[Construction Example] System Building Low-Temperature Logistics Warehouse (Tottori Prefecture)
Introducing case studies of logistics centers that can flexibly respond to customer needs!
Based on the purpose, size, and regional environment of factories and warehouses, it is possible to select suitable roofs, walls, and structures, achieving short construction periods and low costs. Here, we introduce a case study of "system construction." The low-temperature logistics warehouse in Tottori Prefecture is divided into four sections: chilled, partial, frozen, and dry, making it a logistics center that can flexibly respond to customer needs. 【Construction Case Study】 ■ Completion Date: September 2012 ■ Location: Tottori Prefecture ■ Total Floor Area: 2,491 m² (753.53 tsubo) *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Kawata Industrial Co., Ltd.'s Construction Division is engaged in the construction of hospitals, offices, and multi-family housing, among other projects. Additionally, we are involved in the design and construction of special buildings represented by the Ushiku Great Buddha, the evolution of system construction methods introduced from the United States for the construction of large space production and logistics facilities, and we contribute to society through the provision of environmental products such as greening and geothermal heat pump systems.