A two-line welding method for underground beams that achieves significant shortening of construction time and allows for small-scale construction!
The construction method is the "Underground Beam Double-Line Welding Method" for underground beam stirrups and beam stirrups, which ensures a spacious working environment without the need for main reinforcement receiving frames or temporary scaffolding. The reinforcement of the upper main bars of the beam, pressure welding, and the installation of cap ties can be carried out on the formwork. Additionally, the joint length is not a problem as it is more than 25d due to the two horizontal bars welded at the ends of the auxiliary reinforcement. *For more details, please download the PDF or feel free to contact us.*
Inquire About This Product
basic information
【Features】 ■ The ribs of the beam are meshed, resulting in good precision for pitch and other measurements. ■ No need for beam upper main reinforcement support frames or temporary scaffolding. ■ Significant reduction in construction time and the possibility of small-scale work. ■ Drawings and products are created according to the conditions of each site. ■ The reinforcement of the upper main reinforcement of the beam can be done safely on the slab formwork. *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
YB Tech Co., Ltd. is actively engaged in the development and manufacturing of products that contribute to shortening construction periods and labor-saving in rebar work. We offer a variety of technologies and products, including the "two-line welding method (two-line mesh method)" that eliminates the need for upper main rebar support frames and temporary scaffolding, as well as "welded closed column hoops and beam stirrups FB rings."