Visualization of Analog Data: Achieving visualization with minimal equipment configuration.
Here is an introduction to the improvement case proposed by Patlite for FA sites. The remaining amount in the liquid tank, which previously required cumbersome verification work, is now displayed clearly without complex controls like PLCs. The stacked information display light "LA6" is tower-shaped, making it easy to see and confirm from a distance. Whether for water supply or drainage, the settings for the display light are completely flexible and can be easily configured using a computer. 【Case Study】 ■ Clearly displays tank levels without complex controls like PLCs ■ Achieved with minimal equipment configuration ■ Flexible settings for the display light for both water supply and drainage ■ Easily configurable via computer *For more details, please refer to the PDF document or feel free to contact us. https://www.patlite.co.jp/solutions/detail.php?AutoID=35 ↓↓↓ Official Online Shop ↓↓↓
Inquire About This Product
basic information
【Equipment Configuration】 ■Stacked Information Display Light "LA6" *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Since our founding, we have contributed to society with the corporate philosophy of delivering "safety, security, and ease" to people around the world, manufacturing products such as display lights, rotating lights, vehicle equipment, and audio devices.


![[Improvement Idea] Visualizing disaster occurrence information at multiple sites.](https://image.www.ipros.com/public/product/image/7d0/2001444770/IPROS12143039237726689442.png?w=280&h=280)
![[FA Site Improvement Case] Abnormalities of the Compressor Reported via "Wireless"](https://image.www.ipros.com/public/product/image/282/2000332329/IPROS73968046163191525729.jpeg?w=280&h=280)
![[FA Site Improvement Case] Visualizing the Water Volume of Wastewater Treatment as Part of Efficiency Enhancement](https://image.www.ipros.com/public/product/image/03b/2000334964/IPROS11953324446713413105.jpeg?w=280&h=280)
![[FA Site Improvement Case] I want to visualize the number of defective products during equipment downtime.](https://image.www.ipros.com/public/product/image/55b/2000332469/IPROS19030917256733862653.jpeg?w=280&h=280)
![[FA Site Improvement Case] Achieving Enhanced Robot Status Display and Safety Measures](https://image.www.ipros.com/public/product/image/542/2000337265/IPROS85824340114961204777.jpeg?w=280&h=280)


![Safety measures during the construction of ST clamps and tail arm methods [New Release!]](https://image.www.ipros.com/public/product/image/2001517983/IPROS1531843997550096061.jpg?w=280&h=280)