A construction method that can respond to deep water, turbid water environments, and tidal currents, ensuring safe and reliable execution!
The "Marine Stamp Method" involves using a crane ship to freely drop weights onto a foundation stone surface with unevenness, performing leveling and compaction from the unevenness, and leveling it to a specified height. The position of the leveling surface is determined using a GPS azimuth meter to find the weight's orientation, while height and position management are measured through mirroring with light waves and deployed to the stamp system for monitoring management. 【Features】 - Enables the formation of a mound with higher density and strength compared to conventional methods - Improved work efficiency - Labor-saving and cost reduction possible - Prevents human error by crane operators *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
【Specifications】 ■Body weight: 50t ■Base area: 2.65m × 2.65m = 7.0m² *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
At Asia Construction Industry Co., Ltd., we offer a full range of general civil engineering works, as well as sales of sand, soil, and stone materials. We possess the main technology of the foundation waste stone leveling method, "Marine Stamp." Please feel free to contact us if you have any inquiries.