Guidelines for Fire Safety Consultation for Small Quantity Hazardous Material Storage
"Guidelines for Firefighting Consultation" for hazardous material storage cabinets handled by System House R&C.
To install a small hazardous materials storage cabinet, permission from the fire department is required. Depending on the items to be stored, their quantities, and the installation location, approval may not be granted, so it is advisable to consult with the relevant fire department in advance. 【Flow of Pre-Consultation】 ■ Confirm the relevant fire department to submit the fire notification ■ Create a list of the materials to be stored ■ Prepare a layout diagram of the intended installation location ■ Consult with the fire department in advance ■ Guidance ■ A building confirmation application may be required as a structure 【Points to Note During Installation】 ■ Use a 4-ton crane truck only if access and side loading are possible (otherwise, a mini rough terrain crane or forklift is necessary) ■ It is necessary to adjust the unevenness of the installation site ■ Electrical work on-site is required when installing optional electric ventilators ■ The foundation will be designed based on our anchor plan ■ The standard snow load is up to 30 cm, with an option available for up to 150 cm. *For more details, please refer to the catalog or feel free to contact us.
Inquire About This Product
basic information
[Points to Note When Applying for Building Confirmation] The following cases require a building confirmation application: ■ In the case of new construction on the site ■ When installing within a quasi-fire prevention area ■ When the total of extensions or renovations on the site exceeds 10m2 * This product cannot provide structural calculation documents. Please consult with the confirmation application authority in advance as needed to confirm that a structural calculation document is not required. We can provide a structural examination report based on experimental data conducted by our company. * In fire prevention areas, shutter specifications cannot be installed, but parent-child door specifications may be allowed. Please consult with the inspection authority in advance. * For more details, please refer to the catalog or feel free to contact us.
Price range
Delivery Time
P4
Applications/Examples of results
For more details, please refer to the catalog or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
We, System House R&C, are a prefabricated house manufacturer for business purposes that celebrated our 50th anniversary in October 2019. In addition to temporary prefabricated houses for construction, we handle a wide variety of buildings for various uses, including permanent offices and government buildings, convenience stores and restaurants, educational facilities such as daycare centers and after-school care facilities, factories and warehouses, and small hazardous material storage facilities for items like gasoline. We aim to be a company that challenges the creation of new markets with the slogan "Refining quality and reliability to satisfy our customers." We strive for product safety management in our in-house testing facilities and actively support the acquisition of qualifications for architects and construction management engineers. Currently, we have 34 first-class architects, 25 second-class architects, 76 first-class construction management engineers, and 18 second-class construction management engineers on staff, and we continue to work on improving our technology to provide comfortable spaces through better products, services, and technologies. **Benefits of Prefabricated Construction** By producing the frame steel and exterior wall panels in our own factory, we reduce on-site construction and shorten construction periods. This allows us to achieve stable quality at reasonable prices. Additionally, we significantly reduce the amount of waste generated on-site, making our products environmentally friendly.