This is a supplementary construction method useful for work affected by groundwater levels.
The "Well Point Method" is a groundwater lowering technique that temporarily reduces the groundwater level only in the areas affected by construction during the construction period. It allows for treatment on-site with compact equipment. Furthermore, the stability of the excavation slopes and bottom can shorten the later stages and reduce construction costs. Additionally, since no chemicals are used, it is an environmentally friendly method. 【Features】 ■ Eases civil engineering work due to reduced water and soil pressure ■ Shortens later stages and reduces construction costs due to the stability of excavation slopes and bottom ■ Enables purification treatment in a short period ■ Allows for on-site treatment with compact equipment ■ Keeps treatment costs low *For more details, please refer to the catalog or feel free to contact us.
Inquire About This Product
basic information
【Equipment and Parts (Partial)】 ■ Header Elbow 135° ■ Nylon Elbow ■ Swing Hose ■ Header Elbow 90° ■ Ground Cock (C Cock) ■ Nylon Plug ■ Header Cheese ■ Soundproof Parent-Child Pump ■ Swing Hose ■ Rubber Sleeve (Header Coupling) etc. *For more details, please refer to the catalog or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the catalog or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Chikenkougyou Co., Ltd. is a company primarily engaged in general civil engineering, environmental-related projects, and intermediate processing of industrial waste. We possess technology and equipment that enable centralized management of underground construction, techniques for rehabilitating pipelines affected by aging and disasters, and we are committed to environmental protection, including efforts to reduce CO2 emissions. Our company contributes to various public works and civil engineering projects using technology that approaches the "earth."