◆◆Achieving greening in soil that was difficult to green◆◆Effects of vegetation promotion using palm nets◆◆
We would like to introduce construction examples using "Shirokumatt T-20," which can be applied in areas where large machinery cannot be used, allowing for construction on small surfaces, and "Shirokumatt T-30," which enables greening even on slopes where securing a location for vegetation substrate spraying machinery is difficult. In addition to details such as the construction conditions and quantities of Shirokumatt used in pavement exterior work and sidewalk installation, we have included photographs documenting the progress of greening after construction. 【Featured Example】 ■ Project Name: (Northern) Itodaoka Nanakamimawari Line Pavement Exterior Work <Hyogo Prefecture> ■ Conditions: Cut soil (soft rock) ■ Usage: General road ■ Construction Quantity: 610m² *For more details, please refer to the catalog or feel free to contact us. -------------------------------------------------------------------------------- Rontai offers free slope surveys at construction sites. For more information, please contact your nearest branch or sales office. --------------------------------------------------------------------------------
Inquire About This Product
basic information
【Other Publication Examples (Excerpt)】 ■ Project Name: Emergency Restoration Work for Tsuwano Castle Ruins <Shimane Prefecture> ■ Conditions: Cut Earth (Hard Soil) ■ Purpose: Disaster, Restoration, Prevention ■ Construction Quantity: 700m² ■ Project Name: Second Phase of Disaster Prevention Safety Grant for Kamichu Okugawa (Regular Erosion Control) <Shimane Prefecture> ■ Conditions: Cut Earth (Soft Rock) ■ Purpose: Rivers, Erosion Control ■ Construction Quantity: 150m² *For more details, please refer to the catalog or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the catalog or feel free to contact us.
catalog(7)
Download All Catalogs![[Work Rate, Placement Diagram, Construction Method] Vegetation Mat 'Shiroku Mat t-20' for Soft Rock I and Hard Soil](https://image.www.ipros.com/public/catalog/image/01/f89/514828/IPROS79281940378717816346.jpeg?w=120&h=170)
![[Work Rate, Placement Diagram, Construction Method] Vegetation Mat 'Shirokumatt T-30' for Soft Rock I and Hard Soil](https://image.www.ipros.com/public/catalog/image/01/96e/514829/IPROS27436119441528875114.jpeg?w=120&h=170)
![[Work Rate, Placement Diagram, Construction Method] Vegetation Mat 'Shirokumatt T-50' for Soft Rock I and Hard Soil](https://image.www.ipros.com/public/catalog/image/01/ffa/514830/IPROS69945342445363422556.jpeg?w=120&h=170)
![[Work Rate, Placement Diagram, Construction Method] Vegetation Mat for Soft Rock I and Hard Soil 'Shiroku Mat t-70'](https://image.www.ipros.com/public/catalog/image/01/b66/668345/IPROS01335328181813560987.jpeg?w=120&h=170)
CAD data(4)
Model number | overview | File |
---|---|---|
[Drawing] Shirokumatt t-20 |
|
|
[Drawing] Shirokumatt t-30 |
|
|
[Drawing] Shirokumatt t-50 |
|
|
[Drawing] Shirokumatt T-70 |
|
Company information
Gentle green spreads across the slopes of the road, blending into the landscape. This green may be what is called "slope greening," which is planned and planted during road construction. Our work in slope greening aims to prevent slope collapse, protect people's lives and communities, and restore damaged ecosystems. With the belief of "green that protects people," Rontai is committed to greening efforts.