Maintaining effectiveness even 18 years after construction! [Heat-insulating paint construction case]
Kokuyo Co., Ltd. Nagoya Distribution Center [Cool Sarm Construction Case]
At Kokuyo Co., Ltd. Nagoya Distribution Center, the work environment on the intermediate floor before painting was like a steam room with no air conditioning and poor ventilation. However, after the Cool-Sarm coating in 1994, the indoor temperature dropped by 7°C, creating a comfortable environment. Ten years later (in 2004), when measuring the indoor temperature on a day with the same outdoor temperature as immediately after the installation, it was found to maintain a similar temperature, and air conditioning units were not needed or used. The effects have been maintained even 18 years after installation. [Case Study] ■ Galvanized Steel Roof, 6,000 m² *For more details, please refer to the catalog or feel free to contact us.
Inquire About This Product
basic information
【Effect】 ■Achieves an indoor temperature of '−7℃'! ・Before painting: 39℃ ⇒ After painting: 32℃ ... and even after 10 years, it maintains '33.5℃', and after 18 years, '35.5℃'. *For more details, please refer to the catalog or feel free to contact us.
Price information
Please contact us.
Delivery Time
※Please contact us.
Applications/Examples of results
【Usage】 ■ As a heat-insulating and thermal insulation paint for roofs of factories and similar structures. *For more details, please contact us or download the catalog.
catalog(6)
Download All CatalogsCompany information
Since our establishment, we have been engaged in various maintenance businesses as the general agent in Japan for excellent building materials from around the world. While seeking outstanding products and expanding our information network globally, we aim to provide high-quality construction that utilizes the technologies and know-how we have cultivated over many years. It is our job to always stand in the customer's perspective and respond quickly and accurately to their various needs.