P Company [CoolSarm Construction Case Studies]
At Company P, the air conditioning energy in the factory uses city gas. To achieve energy savings during summer cooling, we applied Cool-Sarm paint. 【Case Study】 ■ Roof with tile bars: 3,200m2 ■ Request: To reduce summer cooling energy *For more details, please refer to the catalog or feel free to contact us.
Inquire About This Product
basic information
【Effect】 [Summer] ■Increase the cold water temperature of the air conditioning system from 9℃ to 11℃ ・Reduced city gas usage by 37,152m3 over 5 months ・Achieved energy savings of approximately 1.7 million yen (38% reduction) [Winter] ■Operate by lowering the hot water temperature by 2 to 3℃ ・Achieved energy savings of approximately 600,000 yen *For more details, please refer to the catalog or feel free to contact us.
Price information
Please contact us.
Delivery Time
※Please contact us.
Applications/Examples of results
【Usage】 ■ As a heat-insulating and heat-reflective paint for roofs of factories and similar structures *For more details, please contact us or download the catalog.
catalog(6)
Download All CatalogsCompany information
Since our establishment, we have been engaged in various maintenance businesses as the general agent in Japan for excellent building materials from around the world. While seeking outstanding products and expanding our information network globally, we aim to provide high-quality construction that utilizes the technologies and know-how we have cultivated over many years. It is our job to always stand in the customer's perspective and respond quickly and accurately to their various needs.