An environmentally friendly method that prevents the generation of industrial waste! A new technique for dam holes that excels in safety management.
This is a slab opening slide reinforcement box that solves the issues of "environmental measures" and "safety management" currently faced by the industry. Traditional methods require the installation of formwork for temporary openings, which becomes industrial waste. 'Selbon' combines a rebar mesh formwork, resulting in no industrial waste as it serves as a disposable formwork. It can be constructed by a single trade, contributing to cost reduction through significant reductions in construction days. 【Features】 ■ No reinforcement needed inside the opening ■ No industrial waste ■ Significant reduction in construction days ■ Total cost reduction *For more details, please refer to the catalog or contact us.
Inquire About This Product
basic information
Selbon was developed to solve the processes of conventional construction methods (formwork creation, reinforcement, curing, and formwork removal) with a single component. ● For other functions and details, please contact us.
Price information
Please feel free to contact us.
Delivery Time
※Please feel free to contact us.
Applications/Examples of results
- Unified formwork production, reinforcement, curing, and formwork removal - Reinforcement of openings in apartments For other functions and details, please contact us.
catalog(10)
Download All CatalogsCAD data(3)
Model number | overview | File |
---|---|---|
CAD data for the installation diagram of the Selbon support pile. |
|
|
Cellbon floor plan CAD data 2 |
|
|
Cellbon floor plan CAD data |
|
Company information
The newly developed slab opening slide reinforcement muscle box "Selbon" not only accurately addresses these issues but is also a groundbreaking product developed to solve the processes of traditional construction methods (formwork production, reinforcement, curing, and formwork removal) with a single component, truly looking from the present to the future.