We are introducing examples of residual sludge treatment during renovation work!
We are introducing a case of residual sludge treatment during renovation work conducted by Seisui Kogyo Co., Ltd. During the renovation of the aeration tank, we faced a situation where we had to dispose of 8,000m3 of sludge inside the tank. Since vacuum treatment would incur high processing costs, we used a temporary dewatering plant to reduce the volume. As a result of the treatment, we were able to reduce sludge disposal costs by approximately 73%. If you have any inquiries, please feel free to contact us. 【Features】 ■ Reduced residual sludge using a temporary dewatering plant ■ Resulted in approximately 73% reduction in sludge disposal costs *For more details, please refer to the catalog or feel free to contact us.
Inquire About This Product
basic information
【Details of the Temporary Dewatering Plant】 ■ Processing Period: 3 months ■ Raw Water Concentration: 8,000 mg/ℓ ■ Operating Hours: 8 hours/day ■ Dewatering Machine Model: HS-500MW ■ Dewatering Machine Processing Capacity: 13 m³/hour ■ Dewatering Cake Moisture Content: 82% ■ Treated Water: Recovery Rate of over 99% *For more details, please refer to the catalog or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the catalog or feel free to contact us.
Company information
Seisui Industries is a rental company specializing in temporary dewatering plants for sludge treatment and water treatment troubles. We own 90 centrifuges, and we are the only company renting them out nationwide. We also respond quickly to emergency situations during troubles.