Vibration measurement after the implementation of vibration reduction methods. Results of maximum acceleration measurements under the elevated track are presented.
The T-BAGS vibration reduction method "Post-Construction Vibration Measurement" is a catalog that includes information on the construction locations of the T-BAGS vibration reduction method, measurement sites, measurement details, and measurement results. In all locations, both horizontal and vertical maximum accelerations were reduced. 【Measurement Locations】 ○ Under the JR San'in Main Line elevated section ○ Under the Inbi Line elevated section ○ Top surface of the T-BAGS vibration reduction method construction floor For more details, please contact us or download the catalog.
Inquire About This Product
basic information
【Vibration Measurement Data】 ○ Train from Tottori Station heading to Tsunoi Station on the Inbi Line → The maximum horizontal acceleration under the Inbi Line elevated section and the T-BAGS constructed floor is approximately 1/12 to 1/15, with vertical direction damping up to about 1/6. ○ Train coming into Tottori Station from Tsunoi Station on the Inbi Line → The maximum horizontal acceleration under the Inbi Line elevated section and the T-BAGS constructed floor is approximately 1/53 to 1/73, with vertical direction damping up to about 1/7. ○ Train coming into Tottori Station from Fukube Station on the JR San'in Main Line → The maximum horizontal acceleration under the JR San'in Main Line elevated section and the T-BAGS constructed floor is approximately 1/10 to 1/19, with vertical direction damping up to about 1/11. ● For more details, please contact us or download the catalog.
Price information
Please contact us.
Delivery Time
※Please contact us.
Applications/Examples of results
For more details, please contact us or download the catalog.
catalog(1)
Download All CatalogsCompany information
In today's changing times, we strive to embody the motto of "Customer First" as construction material trading professionals by aiming for: ● Trusted transactions and accurate, prompt responses ● Honest service closely connected to the job site ● Professionals in building materials that customers can consult with confidence We are dedicated to continuous improvement day and night.