A climbing formwork suitable for all shapes and heights of structures without using a crane!
The "SKE50 plus" is a self-climbing formwork scaffold that uses a hydraulic climbing device to integrate formwork and scaffolding into a single unit. It can climb the outer perimeter system on all four sides simultaneously. With a guide rail system, it allows for safe climbing and ensures safety during high-altitude work. Each unit is lightweight, enabling a reduction in lifting equipment capacity and labor-saving. 【Features】 ■ Ensures safety for high-altitude work ■ Environmentally friendly with minimal waste due to the highly efficient unitized formwork scaffold ■ Can climb in strong winds of up to 20 m/s, unaffected by weather conditions ■ Shortens construction time by adhering to cycle processes *For more details, please request documentation or view the PDF data available for download.
Inquire About This Product
basic information
【Basic Performance Overview】 ○ Climbing Method: Hydraulic Self-Climbing ○ Concrete Pouring Height: 2.7m to 5.5m ○ Maximum Wind Speed for Climbing: 20m/s ○ Climbing Speed: 20cm/min ○ Formwork Used: Large Formwork Top50 【Component Parts】 ○ Concrete Pouring Scaffold (Platform Level +1) ○ Large Area Formwork Top50 ○ Working Scaffold (Platform Level ±0) ○ Climbing Profile ○ Finishing Scaffold (Platform Level -1, -2) ● For more details, please contact us or download the catalog.
Price information
Please contact us.
Delivery Time
※Please contact us.
Applications/Examples of results
For more details, please contact us or download the catalog.
catalog(1)
Download All CatalogsCompany information
Doka has been manufacturing the highest quality formwork systems for over 50 years. You can rest assured that the forming work can proceed smoothly without incurring costly work interruptions. To ensure long-term and high-quality standards for formwork products, we have thoroughly pursued the latest production processes and self-certified quality management systems throughout the entire production chain. By making planned investments in new production technologies, expanding production capacity, forming strategic partnerships with audited suppliers, and continuously improving the skills of our wood and metal processing staff, we have strengthened the foundation of our in-house production operations and increased efficiency. Additionally, through an efficient logistics network, we can quickly deliver Doka's comprehensive product portfolio at any time, even when demand peaks.