Cutting the outer shell of the existing pile while crushing it with a screw head! We will remove it completely without leaving anything behind.
The Eco-Crushing Method (ECR Method) involves attaching specially processed casing to a dual-axis co-axial earth auger, which cuts the outer shell of existing piles while crushing them with a screw head. This low-vibration, low-noise method allows for the easy removal and crushing of the pile head, joint, and bottom plate, which have previously been considered difficult to handle. An air compressor is used as auxiliary support for excavation. Construction management is conducted through an integrated control device, enabling confirmation of the crushing and removal status. After crushing and removal, ground improvement can be performed to achieve strength equivalent to the surrounding soil. 【Features】 - Does not use large amounts of water - No wastewater or sludge is generated, eliminating the need for treatment - The site remains clean with minimal machinery and equipment - No pile material is left behind - Backfilling and ground improvement can be performed For more details, please contact us or download the catalog.
Inquire About This Product
basic information
【Features】 ○ Crushing while cutting the outer shell of existing piles with a screw head → Can be removed completely without leaving any remnants ○ Specially processed casing allows for the crushing and removal of PC steel bars, pile head steel plates, pile joint steel plates, and pile bottom steel plates ○ Construction management through an integrated control device enables confirmation of the crushing and removal status ○ After crushing and removal, ground improvement can be done to achieve strength equivalent to the surrounding soil ○ An air compressor is used as an auxiliary for excavation ● For more details, please contact us or download the catalog.
Price information
Please contact us.
Delivery Time
※Please contact us.
Applications/Examples of results
For more details, please contact us or download the catalog.
catalog(1)
Download All CatalogsCompany information
Endo Engineering Co., Ltd. is a company based in Miyagi Prefecture that engages in general civil engineering works, various pile driving works, ground improvement works, temporary and earth retaining works, temporary bridge assembly and dismantling works, and existing pile crushing and removal works. In the fiercely competitive and ever-evolving Japanese economy, companies across all industries, not just in the civil engineering sector, must make various efforts to secure a ticket to the "Ark of Noah." The era of merely producing goods has ended; there is now a demand for environmentally friendly and human-centered manufacturing and system development. The utilization of underground spaces aimed at making effective use of limited land will continue to be an important issue, while also posing delicate problems such as environmental destruction. With civil engineering technology evolving in a more advanced and complex manner, we at Endo Engineering are committed to providing high-quality civil engineering services, with a motto of reliable technology and safety first, as each employee hones their skills with a high level of awareness every day.