Right next to you in an emergency! We've eliminated the hassle of carrying it out!
The water stop board protects people, buildings, and cities from the dangers of guerrilla heavy rain (guerrilla thunderstorms), concentrated rain from typhoons, heavy rain, and urban flooding. 【Features】 - Since the water stop board is embedded at the installation site, there is no hassle of transporting it. - Installation time is approximately 1 minute. - Made with carbon for lightweight and durability. - Shallow ditches minimize impact on existing facilities. - Can be installed by one person! - Cleaning inside the pit is easy! *For more details, please download the catalog or contact us.
Inquire About This Product
Related Videos
basic information
◎ No need to transport as it is embedded in the installation location ◎ High load-bearing capacity with low risk of damage ◎ Installation time is about 1 minute ◎ Lightweight and strong due to carbon use ◎ Shallow trench minimizes impact on existing equipment ◎ Can be installed by one person! ◎ Easy cleaning inside the pit!
Price range
Delivery Time
Applications/Examples of results
For more details, please contact us.
Company information
Mitsuke Kousakusho Co., Ltd. was established in 1967 as a dedicated on-site maintenance contractor for the machinery and equipment maintenance work of Amagasaki Coke Industry Co., Ltd. (now Kansai Thermal Chemical Co., Ltd.). In August 1989, we constructed the Kakogawa Factory, primarily focused on the assembly of conveyor systems for beverages and food, as well as the assembly and installation of other equipment, and we have continued to operate since then. Additionally, we have also carried out equipment installation and piping work for water purification plants and sewage treatment plants under construction companies. Leveraging these achievements, we obtained qualifications to participate in public works bidding for "Hyogo Prefecture," "Kakogawa City," and "Amagasaki City" starting in the fiscal year 2007.