Leave the maintenance management after installation to us!
Regarding the introduction of silo equipment, we have also consulted about installation work and maintenance management after installation. Issues: 1. It is difficult for the equipment manufacturing company to secure personnel for maintenance and inspection work. The costs of replacement parts and labor are significant, and we want to reduce the frequency as much as possible. 2. Especially when the manufacturing company is not located in a nearby prefecture, the costs for dispatching personnel for work are high.
Inquire About This Product
basic information
We proposed to design and manufacture silos based on the customer's specifications and requirements, as well as to manage the necessary personnel arrangements and inspection work as the main contractor for maintenance and inspections after installation. Points: 1. Design of silos with strength to withstand long-term use and harsh operating environments. 2. Safety management and process management will be conducted responsibly by qualified personnel. 3. On-site personnel will be secured locally to minimize expenses such as accommodation and transportation costs. 4. Reports will be prepared in accordance with the specified format.
Price range
Delivery Time
Applications/Examples of results
Please contact us.
catalog(1)
Download All CatalogsCompany information
In the current situation where advanced technological capabilities are required of Japanese companies as a whole, we aim to be a trading company that not only possesses "integrity" and "technology," but also explores our customers' needs and responds to their requests.