Wide compatibility with PVC pipes, fume pipes, and steel pipes.
○ Speeding Method ■ Applicable pipe diameter: PVC pipe 150mm to 250mm ■ Two-stage auger excavation method using temporary pipes Can be launched from a small shaft of 2000×1700 Compact size accommodates a wide range of soil types ○ Iron Mall Method ■ Applicable pipe diameter: PVC pipe 250mm to 350mm, Fume pipe 250mm ■ Mud pressure small diameter pipe pushing method (one-stage auger method) Can push 1m pipe from a launch pit of Φ2.0m, effective for work in narrow spaces. Also, it can be controlled with an automatic control device, ensuring high precision management. It is also possible to push a 2m pipe. ○ Pycon Method Can perform pushing from small diameter to medium diameter. Management is conducted using laser beams, ensuring construction with guaranteed precision.
Inquire About This Product
basic information
【Features】 ○ Demonstrates power in narrow places such as urban areas ○ Can be propelled in limited spaces ○ Can start from a small vertical shaft and reach a manhole We also carry out construction in distant locations (with experience in Okinawa and Kyushu) and outside the prefecture. We will perform propulsion from a Φ1500 circular vertical shaft (Speeder SR-30KM) in two stages. ● For more details, please contact us.
Price information
-
Delivery Time
Applications/Examples of results
Sewer and waterworks construction, etc.
Company information
Kasahara Construction was founded in 1913 (the 2nd year of Taisho) with a focus on civil engineering and construction. Since then, we have been advancing our construction projects with the desire to contribute, even in a small way, to the development of the local community. In addition to the development of social infrastructure in local civil engineering and architecture, we have recently expanded into maintenance and preservation fields such as upkeep, management, repairs, and renovations. Furthermore, we have recently been focusing on environmental aspects, aiming to develop a third pillar for our company by directing our civil and architectural projects towards environmental initiatives. Since 2010, we have introduced a wood drying machine from "Aikobo" to utilize local cedar and forests, and we have begun producing "Echigo Koso Cedar" timber.