TRD method
This construction method connects a chainsaw-type cutter inserted into the ground to a base machine, allowing it to move laterally to excavate a trench, inject a solidifying liquid, and mix and stir with the in-situ soil, thereby creating a continuous soil-cement wall underground.
Inquire About This Product
basic information
【Features】 ○ Effective as a water stop wall during underground excavation ○ Effective as a water stop wall for contaminated soil measures at general waste disposal sites, etc. ○ Effective as a back wall for multi-natural type revetments Please contact us for details on the TRD method.
Price information
-
Delivery Time
Applications/Examples of results
【Usage Examples】 Soil retaining water stop walls, foundation ground improvement, liquefaction countermeasures For details on the TRD method, please contact us.
Company information
The purpose of this association is to promote the TRD method, improve technology, and ensure its sound development.