Geosynthetic Reinforced Soil PAN WALL Method
**Features** - Reduction of long slopes and excavation residual soil volume through steep gradient (1:5 to 1:3 standard). - Protection of obstacles and prevention of loosening and collapse accidents during construction by using reverse construction techniques to finish structures from top to bottom. - Improvement in quality, shortening of construction time, and labor-saving through precasting of surface protection works. - Adaptation to landscape through diversification of PAN WALL panel design patterns. - Excellent seismic resistance. - Superior life cycle cost as a permanent structure through surface works using secondary products and securing hole walls via double pipe drilling. For other functions and details, please download the catalog.
Inquire About This Product
basic information
【Features】 ○ Reduction of long slopes and excavation residual soil volume through steep slope standardization (1:5 to 1:3, with 1:3 as standard). ○ Protection of obstacles and prevention of loosening and collapse accidents during construction by using reverse construction to finish structures from top to bottom. ○ Improvement in quality, shortening of construction period, and labor saving through precasting of surface protection works. ○ Adaptation to landscape through diversification of PAN WALL panel design patterns. ○ Excellent seismic resistance. ○ Superior life cycle cost as a permanent structure through surface works using secondary products and ensuring hole wall stability with double pipe drilling. ● For other functions and details, please download the catalog.
Price information
-
Delivery Time
Applications/Examples of results
【Purpose】 ○ Protection of existing roads, structures, and boundaries ○ Reduction of long slopes and excess soil volume ○ Reinforcement of existing stone masonry, block walls, retaining walls, and weathered bedrock ○ Measures for steep slopes ○ Reinforcement of riverbank protection 【Achievements】 Approximately 350 cases nationwide, construction area of 110,000 m2 Ministry of Land, Infrastructure, Transport and Tourism NETIS registration number CB-980093-A
catalog(1)
Download All CatalogsCompany information
In recent years, many landslides have occurred due to the landfall of massive typhoons and earthquakes. The PAN WALL method is a highly safe construction technique based on a reverse wrapping method, which involves finishing the reinforced earth wall layer by layer (1.2m in height) from top to bottom during construction. Please make use of the PAN WALL method to prevent landslide disasters during construction.