Embankment construction method - Tail Arm Method
This is an embankment construction method that reinforces the soil, which lacks the necessary self-supporting strength, using strip-shaped reinforcing materials made of "steel," a material with low deformation and high tensile strength, to build a reinforced embankment with wall surfaces. ◆ Strip-shaped steel reinforcing materials (strips) are laid in layers within the embankment. ◆ A strong reinforced embankment is constructed through the friction effect between the soil and the strips. (For other functions and details, please contact us.)
Inquire About This Product
basic information
This is an embankment construction method that reinforces the soil, which lacks the self-supporting "strength," with strip-shaped reinforcement materials made of "steel," a material with low deformation and high tensile strength, to create a reinforced embankment with wall surfaces. **Features** - Layered installation of strip-shaped steel reinforcement materials within the embankment - Construction of a strong reinforced embankment through the friction effect between the soil and the strips For other functions and details, please contact us.
Price information
-
Delivery Time
Applications/Examples of results
[Purpose] ○ Reinforcement work
Company information
"JFE Shoji Tail One" will establish a sales system with sales engineers who possess both sales capabilities and technical knowledge, as well as design know-how, to further promote the highly reliable Tail Arm method as a "pioneer in reinforced soil." This will enhance the provision of detailed technical services, allowing us to flexibly respond to the increasingly diverse nature of public works in the future and accurately meet various needs.