Installing surveillance cameras at sites in Hiroshima Prefecture where commercial power and fixed lines cannot be connected.
At the site in Hiroshima Prefecture, multiple cameras were installed under conditions where commercial power and fixed internet lines could not be brought in. The overall situation of the facility and individual monitoring locations can be checked from the laptops of each monitoring department via mobile Wi-Fi. A stainless steel cabinet specified by the customer was used, and the mounting brackets were designed and manufactured using 3D CAD to fit the existing framework.

Inquiry about this news
Contact Us Online




