Ground improvement work - Company Ranking(35 companies in total)
Last Updated: Aggregation Period:Sep 03, 2025〜Sep 30, 2025
This ranking is based on the number of page views on our site.
Display Company Information
Company Name | Featured Products | ||
---|---|---|---|
Product Image, Product Name, Price Range | overview | Application/Performance example | |
![]() TRD method
Other |
Scope of Application Wall Thickness: 450–850mm (at 50mm intervals) Wall Depth: 60m Soil Quality: N≦100 (gravel diameter of 100mm or le... | Application Examples 1. Retaining walls Underground facilities, wastewater treatment facilities, open-cut excavation roads, subway st... | |
![]() HiroWork Kmighty Method
Other |
【Types of Piles Available for Construction, Applicable Pile Diameters, and Depths】 ■ Timber Piles ・Pile Diameter: φ150–300 ・Pile Length: u... | For more details, please refer to the catalog or feel free to contact us. | |
RT-200H Tubing Device Main Unit Drilling Diameter 1,000–2,000mm Casing Pulling Force 3,450kN (352tf) Instantaneous 3... | - Bored pile construction - Underground obstacle removal work | ||
---
--- |
--- |
-
- Featured Products
-
TRD method
- overview
- Scope of Application Wall Thickness: 450–850mm (at 50mm intervals) Wall Depth: 60m Soil Quality: N≦100 (gravel diameter of 100mm or le...
- Application/Performance example
- Application Examples 1. Retaining walls Underground facilities, wastewater treatment facilities, open-cut excavation roads, subway st...
HiroWork Kmighty Method
- overview
- 【Types of Piles Available for Construction, Applicable Pile Diameters, and Depths】 ■ Timber Piles ・Pile Diameter: φ150–300 ・Pile Length: u...
- Application/Performance example
- For more details, please refer to the catalog or feel free to contact us.
For deep excavation work and cutting/removal of underground obstacles! Super Top Method.
- overview
- RT-200H Tubing Device Main Unit Drilling Diameter 1,000–2,000mm Casing Pulling Force 3,450kN (352tf) Instantaneous 3...
- Application/Performance example
- - Bored pile construction - Underground obstacle removal work
-
Membership (free) is required to view all content.
Already a Member? Log In Here