Ground improvement work - Company Ranking(35 companies in total)

Last Updated: Aggregation Period:Sep 03, 2025〜Sep 30, 2025
This ranking is based on the number of page views on our site.

Company Name Featured Products
Product Image, Product Name, Price Range overview Application/Performance example
Scope of Application Wall Thickness: 450–850mm (at 50mm intervals) Wall Depth: 60m Soil Quality: N≦100 (gravel diameter of 100mm or le... Application Examples 1. Retaining walls Underground facilities, wastewater treatment facilities, open-cut excavation roads, subway st...
【Types of Piles Available for Construction, Applicable Pile Diameters, and Depths】 ■ Timber Piles  ・Pile Diameter: φ150–300  ・Pile Length: u... For more details, please refer to the catalog or feel free to contact us.
RT-200H Tubing Device Main Unit Drilling Diameter 1,000–2,000mm Casing Pulling Force 3,450kN (352tf) Instantaneous 3... - Bored pile construction - Underground obstacle removal work
---

---

---
  1. Featured Products
    TRD methodTRD method
    overview
    Scope of Application Wall Thickness: 450–850mm (at 50mm intervals) Wall Depth: 60m Soil Quality: N≦100 (gravel diameter of 100mm or le...
    Application/Performance example
    Application Examples 1. Retaining walls Underground facilities, wastewater treatment facilities, open-cut excavation roads, subway st...
    HiroWork Kmighty MethodHiroWork Kmighty Method
    overview
    【Types of Piles Available for Construction, Applicable Pile Diameters, and Depths】 ■ Timber Piles  ・Pile Diameter: φ150–300  ・Pile Length: u...
    Application/Performance example
    For more details, please refer to the catalog or feel free to contact us.
    For deep excavation work and cutting/removal of underground obstacles! Super Top Method.For deep excavation work and cutting/removal of underground obstacles! Super Top Method.
    overview
    RT-200H Tubing Device Main Unit Drilling Diameter 1,000–2,000mm Casing Pulling Force 3,450kN (352tf) Instantaneous 3...
    Application/Performance example
    - Bored pile construction - Underground obstacle removal work