91~135 item / All 141 items
Displayed results
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationContact this company
Contact Us Online91~135 item / All 141 items
Here is a case study of construction at Upopoy. Within Upopoy, there are several bridges, and we have adopted SP-type fall prevention fences with wooden materials placed on the top edge. Considering the crowd load, the main materials are quite noticeable, but we made efforts to blend them into the surrounding landscape as much as possible. Photography cooperation: Public Interest Incorporated Foundation Ainu Culture Foundation 【Case Overview】 ■ Products: SP-type fall prevention fences, P-type protective fences, furniture ■ Construction Facility: Upopoy (Symbolic Space for Ethnic Coexistence) *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationHere is a case study of construction work on Euro Road in Hachioji City. We have adopted the popular DM type as a vehicle stop to deter vehicle intrusion. The bold chamfering of the corners serves as both a design element and a consideration for pedestrian safety. Additionally, all bollards are designed to be removable (with a key) to allow access for management vehicles and emergency vehicles. 【Case Overview】 ■ Product: DM Type ■ Construction Location: Euro Road, Hachioji City *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a construction case at Odaiba West Promenade. It is the most popular spot in Symbol Promenade Park, where bollards have been installed on the West Promenade. These bollards serve not just as regular vehicle stops, but also as a warning for elevation changes. Additionally, since it is a seaside park, they are designed with measures against salt damage, featuring hot-dip galvanized and fluororesin-coated finishes. 【Case Overview】 ■ Product: Bollard ■ Installation Facility: Odaiba West Promenade *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationHere is a case study of construction on Kayamachi Street in Toyohashi City. The bollards are made of ductile cast iron. They have a height of 800mm above ground, with a base width of 75mm and a top width of 50mm, giving them a slim shape. Not only is the road design appealing, but the community is actively coming up with ideas and activities to cultivate the "path." Stylish planters with flowers are placed along the street, creating a pleasant walking space filled with various creative touches. 【Case Overview】 ■ Product: Bollard (ductile cast iron) ■ Location: Kayamachi Street, Toyohashi City *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a construction case on the Otemae Line in Tanba-Sasayama City. The surrounding roads of the Taisho Roman Hall have been improved, and low-position lighting bollards have been adopted. On the road extending towards Sasayama Castle, there are slim bollards made of recycled wood that serve to prevent vehicles from encroaching onto the sidewalk. 【Case Overview】 ■ Product: Lighting Bollard, Illumina ■ Construction Location: Otemae Line, Tanba-Sasayama City *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a construction example at Takada Matsubara Tsunami Reconstruction Memorial Park. We have created a grass protection fence (rope fence) to deter entry. We have adopted a rope that has good weather resistance, is strong against breakage, and has minimal elongation. The posts are made of square steel 25×25, coated with fluororesin after hot-dip galvanization. To consider visibility and landscape, the height above ground is kept quite low at 300mm. Additionally, there is no concrete foundation; it is a soil-based installation. 【Case Overview】 ■ Product: Grass Protection Fence (Rope Fence) ■ Installation Facility: Takada Matsubara Tsunami Reconstruction Memorial Park *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationAt intersections in Yokohama City, the Hyper Bollard HYP-01A (underground type) has been adopted. It can be installed in the narrow space between the curb and the tactile paving, taking into consideration the position for visually impaired individuals. Additionally, a dark brown color that blends with the landscape has been adopted for intersections near high-traffic highway entrances and exits. 【Case Summary】 ■ Product: Hyper Bollard HYP-01A (underground type) ■ Installation Location: Intersections in Yokohama City *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a construction example from the Nishisando Project. Our removable bollards have been adopted for the historic approach. They feature a slim form with a post diameter of Φ76.3mm and a height of 850mm above ground. They are installed to visually deter vehicles from driving onto the sidewalk. Please feel free to contact us if you have any inquiries. 【Case Overview】 ■ Product: Removable Bollard ■ Construction Work: Nishisando Project *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a construction case at the sidewalk in front of Kyushu Electric Power in Oita City. We adopted the impact-resistant bollard Hyper Bollard (underground pile foundation type, HYP-01A) at the boundary between the sidewalk and roadway. A more comfortable and safer sidewalk has been completed. Please feel free to contact us if you have any inquiries. 【Case Overview】 ■ Product: Impact-resistant bollard Hyper Bollard (underground pile foundation type, HYP-01A) ■ Construction Location: Sidewalk in front of Kyushu Electric Power, Oita City *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a construction case at the Aira Branch of Kagoshima Shinkin Bank. We have adopted impact-resistant bollards (underground pile foundation type, HYP-01A) for the new construction of the credit union. In light of the recent increase in accidents caused by mistakenly pressing the brake and accelerator, they were installed on both the building side and the outer road side. 【Case Overview】 ■ Product: Impact-resistant bollards (underground pile foundation type, HYP-01A) ■ Construction Facility: Aira Branch of Kagoshima Shinkin Bank *For more details, please refer to the PDF materials or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of our work at Shibuya Fukuras. In the bus rotary, our crosswalk prevention fence, which uses CT-shaped steel for the posts, has been adopted. The elegantly rising form fits well with the urban landscape, which has received great acclaim. 【Case Overview】 ■ Product: Crosswalk Prevention Fence ■ Installation Facility: Shibuya Fukuras *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationA hyper bollard chain fence has been adopted on Chomei Route 1 in Nihonmatsu City, Fukushima Prefecture. Due to the proximity to the road shoulder line and the drop-off, hyper bollards were installed as a safety measure. The sleeve piles of the underground foundation used for the hyper bollard HYP-01A can be installed in narrow spaces and are effective. [Case Overview] ■ Product: Hyper bollard chain fence ■ Installation Location: Chomei Route 1, Nihonmatsu City *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a construction case at the Sakai City school route intersection. After the emergency inspection of the school route was completed, several discussions were held between local residents and the city hall, resulting in the adoption of both hyper bollards and high-security bollards. Please feel free to contact us if you have any requests. 【Case Overview】 ■ Products: Hyper Bollard, High-Security Bollard ■ Construction Location: Sakai City School Route Intersection *For more details, please refer to the PDF materials or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of our work at Tsurumi Kagetsuen Park. The Illumina has been adopted as garden lighting at various points within the park. We have received positive feedback, saying, "It's stylish." Please feel free to contact us if you have any inquiries. 【Case Overview】 ■ Product: Illumina ■ Installation Facility: Tsurumi Kagetsuen Park *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a construction example from Motomachi Street in Kobe. On Motomachi Street, we adopted a slim N-type bollard (visual deterrent) with a base diameter of 75mm, a top diameter of 50mm, and a height of 800mm above ground. The material is ductile cast iron with a urethane resin coating finish. Please feel free to contact us if you have any inquiries. 【Case Overview】 ■ Product: N-type bollard (visual deterrent) ■ Installation Location: Motomachi Street, Kobe *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationHere is an introduction to a construction case study at the Hakata Connector. For the boundary between the pedestrian walkway and the roadway, we adopted bollards treated with zinc phosphate (color tone N4). Additionally, our signature vertical barrier was also treated with zinc phosphate and adopted. 【Case Overview】 ■ Treatment: Zinc phosphate treatment (color tone N4) ■ Construction Facility: Hakata Connector *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a construction example at the roadside station "Tenki Tenki Tango." A parking lot has been expanded, and a vertical barrier AK-07 has been installed behind the parking spaces. Unlike the glossy finish of stainless steel, it has a subdued color that blends into the surrounding landscape. 【Case Overview】 ■ Product: Vertical Barrier AK-07 ■ Installation Facility: Tenki Tenki Tango *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce examples of construction projects in Kagoshima Prefecture and Fukuoka Prefecture. In a commercial facility in Kagoshima Prefecture, we adopted impact-resistant vehicle stops and horizontal hyper bollards in the parking lot with the concept of creating a facility that is easy to use and safe for visitors. Additionally, at the Namida Community Center in Iizuka City, Fukuoka Prefecture, we installed stainless steel horizontal hyper bollards at the boundary between the parking lot and the building. [Project Overview] ■ Product: Impact-resistant vehicle stop horizontal hyper bollard ■ Construction Facilities: Commercial facility in Kagoshima Prefecture, Namida Community Center in Iizuka City, Fukuoka Prefecture *For more details, please refer to the PDF materials or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a construction case at Sapporo International University Affiliated Certified Children's Garden. The concept is to create a facility that is easy to use and safe for those who utilize the children's garden. For the parking lot, we have adopted impact-resistant car stops and horizontal hyper bollards. Recently, there have been many accidents caused by mistakenly pressing the brake and accelerator, and since the back of the parking lot is a slope, the potential of the hyper bollards will be demonstrated in case of an emergency. [Case Overview] ■ Product Name: Impact-resistant Car Stops and Horizontal Hyper Bollards ■ Construction Facility: Sapporo International University Affiliated Certified Children's Garden *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a construction case at the JR Otsuka Station North Exit square. We produced two types of pedestrian barriers: fixed and detachable. The fixed type is connected using a joint system. Additionally, the detachable pedestrian barriers are installed so that the gap of the horizontal bollards is less than 150mm. 【Case Overview】 ■ Product: Pedestrian barriers, bollards ■ Installation Location: JR Otsuka Station North Exit square *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a construction case study in Otemachi (from Hitotsubashi to Nishikibashi). In conjunction with the construction of the new Marubeni headquarters building, a riverside promenade has been developed, and a relaxation area has been created under the elevated structure, where we have adopted the type SP fall prevention fence. For better or worse, the metropolitan expressway provides shelter from the rain and blocks sunlight during the summer, making it a place of relaxation for those working in the offices. 【Case Overview】 ■ Product: Type SP fall prevention fence ■ Construction Location: Otemachi (from Hitotsubashi to Nishikibashi) *For more details, please refer to the PDF materials or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a construction case at Floresta Suwaka. A hyper bollard (HYP-01A) has been installed at the intersection of "Hanamizuki Street," the main road of the town, creating a safer and more secure environment. Please feel free to contact us if you have any inquiries. 【Case Overview】 ■ Product: Hyper Bollard (HYP-01A) ■ Installation Location: Floresta Suwaka *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce examples of our installations in Western Japan. Impact-resistant bollards, Hyper Bollards, have been adopted at an intersection in Nago City, Okinawa Prefecture. In addition, they have been used in various locations such as "Yatsushiro Kagami Uto Line in Kumamoto Prefecture" and "an intersection in Ikoma City, Nara Prefecture." [Case Overview] ■ Product: Impact-resistant bollard Hyper Bollard ■ Installation Location: Western Japan (from Okinawa Prefecture to Gifu Prefecture) *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a construction case along the Meguro River promenade. At the newly constructed sidewalk along the Meguro River in Nishi-Gotanda, Shinagawa Ward, Tokyo, solar LED bollards were adopted. The luminous part is made of polycarbonate resin, which is strong against impacts such as contact and collisions. The side cuts allow for a wide range of illumination. 【Case Overview】 ■ Product: Solar LED bollard ■ Construction Location: Meguro River promenade *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a construction case at the new city hall of Yui City. Since a parking lot for visitors was placed directly in front of the city hall, we adopted impact-resistant vehicle stop hyper bollards at the boundaries. Thick and low bollards were also installed at the boundary between the road and the parking lot. Please feel free to contact us if you have any inquiries. 【Case Overview】 ■ Product: Impact-resistant vehicle stop hyper bollard ■ Construction Facility: Yui City New City Hall *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the impact-resistant vehicle stop hyper-bollard installation. In Sapporo City, the chain fence from our company had been used for some time, but it has been reinstalled with an impact-resistant hyper-bollard specification chain fence. In addition, it has been adopted in various locations such as the "Tsurusaki Intersection in Oita City" and the "Shiraishi Town Intersection in Saga Prefecture." [Case Overview] ■ Product: Impact-resistant vehicle stop hyper-bollard ■ Installation Location: Hokkaido and Kyushu *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of our work at the Mito Civic Hall. We have adopted bollards treated with zinc phosphate and vertical barriers for the roads surrounding the civic hall. Additionally, on Art Museum Street (between the Art Museum and the Civic Hall), we have used a combination of our signature vertical barriers and fixed bollards. [Case Overview] ■ Products: Bollards, Vertical Barriers ■ Installation Facility: Mito Civic Hall *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a construction case at the new city hall in Kitami. Planter-type bollards have been adopted for the exterior. Since the top part contains removable planters, it is possible to plant seasonal flowers and plants in a different location and then bring them to the site. Please feel free to contact us if you have any requests. 【Case Overview】 ■Product: Planter Bollard ■Construction Facility: New City Hall in Kitami *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce examples of the installation of our impact-resistant vehicle stop hyper bollards. They have been adopted in supermarkets, shopping centers, electronics retail stores, and drugstores. Additionally, our hyper bollards have also been widely adopted in public facilities, just like in private stores. 【Case Overview】 ■ Product: Impact-resistant vehicle stop hyper bollard ■ Installation Locations - Supermarkets - Shopping Centers - Electronics Retail Stores - Drugstores *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study from Saga Sunrise Park. For the new town development, we adopted impact-resistant vehicle stops, Hyper Bollards. We used high corrosion-resistant steel pipes (ZAM steel pipes) for the post covers and sleeve piles, ensuring that they maintain their impact resistance not only at the time of installation but also over the long term. Please feel free to contact us if you have any inquiries. 【Case Overview】 ■ Product: HYP-01(02)A Dark Brown ■ Installation Facility: Saga Sunrise Park *For more details, please refer to the PDF materials or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a construction case at the new city hall in Moka City. For the exterior construction of the new city hall, we adopted impact-resistant vehicle stop hyper bollards. Additionally, we also adopted removable chain fencing. We supplied bollards made of Inada imitation stone for the boundary between the pedestrian and vehicle areas. 【Case Overview】 ■ Products: HYP-01A zinc phosphate treatment finish, chain fencing, bollards (Inada imitation stone) ■ Construction Facility: Moka City New City Hall *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of our work at Anker Front Town Ikuta. We adopted the KS-11, a vertical barrier that is synonymous with Teikin. Additionally, fall prevention fences and the standard horizontal barrier 82A3-15(20) in brown have been installed in the parking lot. Please feel free to contact us if you have any requests. 【Case Overview】 ■ Products: Vertical barrier KS-11, fall prevention fence, horizontal barrier 82A3-15(20) brown ■ Installation Facility: Anker Front Town Ikuta *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationHere is an introduction to a construction case at Ghibli Park. For the boundary between the parking lot and the plaza, we adopted a DM-type crossing deterrent fence made of corner pipes, which has received positive feedback. Additionally, at the sharp curve of the outer road, impact-resistant vehicle stops and hyper bollards were installed to prevent vehicles from accidentally entering the park. 【Case Overview】 ■ Product: Crossing Deterrent Fence (DM type), HYPS83PK-10 ■ Installation Facility: Ghibli Park *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a construction case at the Yokohama New Port Joint Government Building. On the west side of the joint government building, we have implemented fall prevention fences along Bankoku Bridge Street. The member structure is designed to withstand a crowd load of 980 N/m for vertical loads and 2500 N/m for horizontal loads, and it has been well received not only for its functionality but also for its stylish form. Please feel free to contact us if you have any inquiries. 【Case Overview】 ■ Product: Fall Prevention Fence ■ Construction Facility: Yokohama New Port Joint Government Building *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a construction case at the Fukura waterfront in Yokohama City. Improvements have been made to create a promenade for fishing, which not only serves the function of preventing falls but also includes a 100mm high handrail to prevent people from sitting on the parapet or running children. Additionally, to prevent people from entering the stone embankment area, an entry prevention fence (chain fence) has also been adopted. 【Case Overview】 ■ Products: Handrail, Entry Prevention Fence (Chain Fence) ■ Construction Location: Fukura waterfront, Yokohama City *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a construction case from the Nagasaki Station redevelopment project. We have adopted impact-resistant vehicle stops, custom-made hyper bollards, in the square in front of Nagasaki Station. Given that the station is close to the sea, we have used steel pipes made of ZAM, which boasts excellent corrosion resistance, and applied fluororesin coating. 【Case Overview】 ■ Product: Hyper Bollard (custom-made), Chain Fence (removable type installed underground) ■ Project: Nagasaki Station Redevelopment *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationHere is a case study of the construction at Shin-Oomura Station. A large number of Hyper Bollards HYP-01A (underground type) have been adopted in the station's front square. High corrosion-resistant steel pipes (ZAM steel pipes) have been used for the post covers and sleeve piles, ensuring not only aesthetic appeal but also long-lasting impact resistance. 【Case Overview】 ■ Product: HYP-01A (underground type) ■ Construction Location: Shin-Oomura Station *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of construction at an intersection in Saga City. The Hyper Bollard HYP-01A (underground type) has been widely adopted at intersections throughout Saga Prefecture. High corrosion-resistant steel pipes (ZAM steel pipes) are used for the pole cover and sleeve pile, ensuring not only aesthetic appeal but also long-lasting impact resistance. 【Case Overview】 ■ Product: HYP-01A (underground type) ■ Construction Location: Intersection in Saga City *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a construction example at Ureshino Onsen Station. We have adopted a pedestrian barrier and bollards in the station's front rotary. The outer diameter of the pedestrian barrier's post is 114.3mm, the outer diameter of the beam is 42.7mm, and the post span is set at 3m. Please feel free to contact us if you have any requests. 【Case Overview】 ■Product: Pedestrian barrier, bollard ■Construction Facility: Ureshino Onsen Station *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of our work with Active Link. We have adopted the illuminated parking stop "Illumina" at the vehicle drop-off area, which serves as a supplementary indicator. We also installed our signature vertical bollards at the vehicle entrance and exit. Please feel free to contact us if you have any inquiries. 【Case Overview】 ■ Products: Illumina, vertical bollards ■ Installation Facility: Active Link *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the Sakudaira Station South District Improvement Project. Hyper Bollard HYP-01A (underground type, above ground height 720mm) has been adopted for the roads in the district improvement. To improve visibility, we delivered the Hyper Bollard at a slightly lower height of 720mm than the standard. [Case Overview] ■ Product: HYP-01A (underground type, above ground height 720mm), HYP-02A ■ Industry: Sakudaira Station South District Improvement Project *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a construction case at the south exit square of Yamanashi City Station. As a safety measure for the waterway, we delivered a crossing prevention fence. The posts of the crossing prevention fence are made of CT-shaped steel, giving it a sleek and stylish appearance. Please feel free to contact us if you have any requests. 【Case Overview】 ■ Product: Crossing Prevention Fence ■ Construction Location: South Exit Square of Yamanashi City Station *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationHere is an introduction to a construction case at Higashimurayama Central Park. A bicycle parking area has been developed, and horizontal bollards with a zinc phosphate treatment have been adopted as bicycle stands. The zinc phosphate treatment after hot-dip galvanizing is an inorganic material, which makes it less prone to chalking due to ultraviolet rays compared to organic materials like paint. 【Case Overview】 ■ Product: Horizontal bollards with zinc phosphate treatment ■ Construction Facility: Higashimurayama Central Park *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationHere are some examples of construction work on the Tōkaidō Main Street Line. We have adopted the landscape type of impact-resistant bollards near the chain fence posts at the intersection. Additionally, at the ends of the crosswalk, we have used the pre-manufactured HYP-01A dark gray bollards (with underground pile foundation type). 【Case Overview】 ■ Products: Landscape type bollards, HYP-01A dark gray ■ Construction Location: Tōkaidō Main Street Line *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a construction case at the Hirashin Hiratsuka Cultural Arts Hall. We adopted the 311C model of our signature vertical barrier. The matte hairline finish matches the heavy architecture and the lush square. Additionally, at the entrance of the building, we used the TPN-400D concrete bollard with an Inada stone texture, which has a Φ400 shape that creates an open impression without feeling oppressive. 【Case Overview】 ■ Products: Vertical Barrier 311C, TPN-400D ■ Construction Facility: Hirashin Hiratsuka Cultural Arts Hall *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration