iPROS Urban Planning
  • Search for products by classification category

    • Building Materials
      Building Materials
      35537items
    • Facilities
      Facilities
      56659items
    • Lighting and Interior
      Lighting and Interior
      17273items
    • Common materials
      Common materials
      37011items
    • Civil Engineering Materials
      Civil Engineering Materials
      9535items
    • Construction, work and methods
      Construction, work and methods
      27653items
    • Surveys, Measurements, and Services
      Surveys, Measurements, and Services
      30352items
    • IT/Software
      IT/Software
      31887items
    • others
      others
      84580items
    • Store and facility supplies
      Store and facility supplies
      4358items
    • Office and commercial supplies
      Office and commercial supplies
      11463items
    • Hospital and welfare facility supplies
      Hospital and welfare facility supplies
      952items
    • Logistics Equipment
      Logistics Equipment
      7378items
    • Energy and Resources
      Energy and Resources
      11606items
  • Search for companies by industry

    • Information and Communications
      7198
    • others
      6981
    • Building materials, supplies and fixtures manufacturers
      6683
    • Service Industry
      4607
    • Trading company/Wholesale
      2996
    • Other construction industries
      2455
    • Electrical equipment construction business
      642
    • Interior Design
      528
    • Facility Design Office
      492
    • Construction Consultant
      464
    • Architectural design office
      361
    • retail
      345
    • Warehousing and transport related industries
      321
    • Electricity, Gas and Water Industry
      290
    • General contractors and subcontractors
      288
    • Interior construction business
      274
    • Medical and Welfare
      272
    • Educational and Research Institutions
      258
    • Building Management
      253
    • Renovation and home construction industry
      224
    • Water supply and drainage construction business
      204
    • Housing manufacturers and construction companies
      187
    • Transportation
      160
    • Real Estate Developers
      155
    • Fisheries, Agriculture and Forestry
      124
    • Structural Design Office
      66
    • Finance, securities and insurance
      35
    • Restaurants and accommodations
      29
    • self-employed
      29
    • Mining
      26
    • Public interest/special/independent administrative agency
      18
    • Police, Fire Department, Self-Defense Forces
      18
    • Store and building owners
      9
    • Property Owner
      8
    • Government
      8
    • Individual
      8
  • Special Features
  • Ranking

    • Overall Products Ranking
    • Overall Company Ranking
Search for Products
  • Search for products by classification category

  • Building Materials
  • Facilities
  • Lighting and Interior
  • Common materials
  • Civil Engineering Materials
  • Construction, work and methods
  • Surveys, Measurements, and Services
  • IT/Software
  • others
  • Store and facility supplies
  • Office and commercial supplies
  • Hospital and welfare facility supplies
  • Logistics Equipment
  • Energy and Resources
Search for Companies
  • Search for companies by industry

  • Information and Communications
  • others
  • Building materials, supplies and fixtures manufacturers
  • Service Industry
  • Trading company/Wholesale
  • Other construction industries
  • Electrical equipment construction business
  • Interior Design
  • Facility Design Office
  • Construction Consultant
  • Architectural design office
  • retail
  • Warehousing and transport related industries
  • Electricity, Gas and Water Industry
  • General contractors and subcontractors
  • Interior construction business
  • Medical and Welfare
  • Educational and Research Institutions
  • Building Management
  • Renovation and home construction industry
  • Water supply and drainage construction business
  • Housing manufacturers and construction companies
  • Transportation
  • Real Estate Developers
  • Fisheries, Agriculture and Forestry
  • Structural Design Office
  • Finance, securities and insurance
  • Restaurants and accommodations
  • self-employed
  • Mining
  • Public interest/special/independent administrative agency
  • Police, Fire Department, Self-Defense Forces
  • Store and building owners
  • Property Owner
  • Government
  • Individual
Special Features
Ranking
  • Overall Products Ranking
  • Overall Company Ranking
  • privacy policy
  • terms of service
  • About Us
  • Careers
  • Advertising
  1. Home
  2. Electrical equipment construction business
  3. 八紘テクノ
  4. Product/Service List
Electrical equipment construction business
  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration

八紘テクノ

EstablishmentApril 1974
capital4000Ten thousand
number of employees6
addressTokyo/Shibuya-ku/4th Floor, Ochu Daiichi Building, 2-18-3 Yoyogi
phone03-5351-6571
  • Official site
last updated:Dec 21, 2018
八紘テクノlogo
  • Contact this company

    Contact Us Online
  • Before making an inquiry

    Download PDF
  • Company information
  • Products/Services(37)
  • catalog(42)
  • news(3)

八紘テクノ List of Products and Services

  • category

1~37 item / All 37 items

Displayed results

class="retina-image"

Remote Monitoring System ReMoSy-EB

A remote monitoring service that visualizes power consumption and operational information of our inverter system. By visualizing power, we promote energy conservation!

By connecting ReMoSy to existing equipment and our inverter system, it measures the state and changes in power consumption within buildings and facilities that are normally not visible. The results are displayed in an easily understandable format, such as graphs, on devices like computers and smartphones. This allows us to clearly identify when and where previously unnoticed energy consumption waste occurs, leading to energy savings. "Visualization" is crucial at every step of energy conservation! Understanding the Current Situation By quantifying and graphing power usage, it becomes possible to clarify energy-saving measures. On the homepage, by selecting devices and dates, users can easily check summarized information such as power consumption and inverter operation status. Report Creation The measured data can be used as evidence for energy reduction effects and energy-saving reports, making it easy to record and manage.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Inverter Control Power Saving System E-BRACE Series

[Case Study Collection Gift] Achieving Energy Savings with Inverter Control Power Saving System

Fans and pump system motors are controlled by an inverter, achieving a reduction in electricity costs. Short delivery time, possible within one month from specification confirmation. Basic specifications are simple, yet equipped with necessary features at a low cost. Custom options are available to accommodate installation conditions, control methods, etc. For a limited time, we are offering a collection of case studies as a gift. Please take this opportunity to apply! For more details, please contact us or download the catalog.

  • Power distribution and control panels

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Power Saving System E-BRACE L Series

[Case Study Collection Gift] Low Cost, Lightweight, Compact Inverter Control Power Saving System

Are you overlooking something? Equipment that can be controlled by an inverter. Please consider the next step for "cost reduction measures" and "global warming measures." Since it is low-cost, even small motors that you may have given up on have excellent cost-effectiveness. Being lightweight and compact, it can be installed in tight spaces, leading to reduced installation costs. We have already implemented measures for lighting and heat sources, so if you are struggling with next year's plans, please consider this. Right now, we are offering a collection of case studies as a gift. Please take this opportunity to apply! For more details, please contact us or download the catalog.

  • Power distribution and control panels

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Free download of case studies for inverter control panels by application (air conditioning edition).

Free distribution of 'Inverter Control Panel Application-Specific (Air Conditioning Equipment) Case Study Collection' now available!!

To maintain the indoor temperature optimally, it is mechanically adjusted using dampers, but by opening the dampers and converting motor control to inverter control, we aim to reduce power consumption and lower costs. 【Features】 ○ Inverter control of the air conditioning fan motor for optimal operation ○ Control of motor speed to reduce power consumption For more details, please contact us or download the catalog.

  • Automatic Control Equipment
  • Pool equipment related
  • Sports related facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Free download of case studies for inverter control panels by application (for blowers).

Free distribution of the 'Inverter Control Panel Application-Specific (Blower Edition) Case Study Collection' is currently available!!

By converting the mechanically adjusted airflow, such as airflow adjustments and dampers that match operating hours, to an inverter system, we aim to reduce power consumption and labor by monitoring room temperature, carbon monoxide, and carbon dioxide concentrations. 【Features】 ○ Inverter control for supply fan motors and exhaust fan motors used for indoor and parking ventilation for optimal operation ○ Reduced power consumption during off-peak hours with low-speed operation For more details, please contact us or download the catalog.

  • Automatic Control Equipment
  • Parking lot facility construction
  • Air compressors, blowers and pumps

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Free download of case studies for inverter control panels by application (pump edition).

Free distribution of 'Inverter Control Panel Application-Specific (Pump Edition) Case Study Collection'!!

The flow rate is mechanically adjusted using control valves and manual valves, but by opening the valves and monitoring pressure, temperature, etc., we aim to reduce water supply power by converting motor control to inverter control. 【Features】 ○ Inverter control for optimal operation of heat source pump motors ○ Reducing power consumption by controlling the motor's rotation speed For more details, please contact us or download the catalog.

  • Piping and insulation
  • Automatic Control Equipment
  • Sports related facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Free download of inverter control panel update case studies.

Free distribution of 'Inverter Control Panel Update Case Studies' is now available!!

Hachiko Tech Co., Ltd. responds to various customer requests with optimal proposals and prompt implementation work. 【Features】 ○ Reduces the burden on equipment personnel with inverter updates ○ Improved operability and increased energy-saving rates 【Published Content】 ○ Update Case 1 [Accommodation Facility] Operational improvement (visualization during abnormal occurrences and simplification of recovery work) ○ Update Case 2 [Accommodation Facility] Operational improvement (addition of frequency switch) For more details, please contact us or download the catalog.

  • Automatic Control Equipment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Free download of inverter control panel improvement case studies.

Free distribution of 'Inverter Control Panel Improvement Case Studies'!!

Hakkou Techno Co., Ltd. responds to various customer requests with optimal proposals and prompt implementation work. 【Features】 - Optimal operation by converting motor control to inverter - Cost reduction through problem-solving For more details, please contact us or download the catalog.

  • Automatic Control Equipment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Case Study: Air Conditioning Unit 1 [Accommodation Facility] Inverterization of Air Conditioning Fan

Introducing a cost-effective inverter panel designed for cost performance to reduce power consumption.

We have introduced a cost-effective inverter panel designed for small equipment that is not very effective in terms of cost-performance. During the intermediate seasons (spring and autumn), when heating and cooling are not heavily required, we significantly reduce the rotation speed based on temperature sensor signals. Furthermore, during checkout times, we achieve substantial energy savings by forcibly lowering the rotation speed through timer control. We also automated the manual adjustment of damper openings according to the seasons by fully opening them and implementing inverter control for labor-saving. 【Features】 ○ Control Method: Inverter control of air conditioning fan motor rotation speed using temperature sensors ○ Target Equipment: In-room air conditioning units       Supply fans (5.5kW) x 2 units, return fans (3.7kW) x 2 units For more details, please contact us or download the catalog.

  • Automatic Control Equipment
  • Power distribution and control panels

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Case Study: Air Conditioning Unit 2 [Commercial Facility] Inverterization of Air Conditioning Fans

By changing the air volume adjustment from traditional damper opening and closing to inverter control, power consumption is reduced.

By changing the air volume control from traditional damper opening and closing to inverter control, power consumption is reduced. The duct damper can be fully opened, allowing for easy switching of the fan motor speed with a manual switch on the control panel. It can quickly respond to in-store congestion and seasonal conditions with the set speed on the step speed switch. 【Features】 ○ Control Method: Simplified operation with manual step speed control ○ Target Equipment: In-store air conditioning units       Air conditioning unit fan <Air Handling Unit> (30.0kW) For more details, please contact us or download the catalog.

  • Automatic Control Equipment
  • Unit and other construction
  • Power distribution and control panels

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Case Study: Air Conditioning Unit 3 [Sports Facility] Inverterization of Air Conditioning Fans

Detect the return temperature and control the optimal airflow of two units with inverter control to reduce power consumption.

We detected the return temperature and implemented optimal airflow inverter control for two units. This significantly reduces power consumption during the intermediate seasons (spring and autumn). We achieved an annual energy saving of 75,504 kWh (approximately 55% energy savings). 【Features】 ○ Control Method: Inverter control of fan motor speed using temperature sensors ○ Target Equipment: Air conditioning fan for the lobby and training room of the sports center       Air conditioning supply fan (45.0 kW),       Air conditioning return fan (22.0 kW) For more details, please contact us or download the catalog.

  • Automatic Control Equipment
  • Sports related facilities
  • Power distribution and control panels

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Case Study: Air Conditioning Unit 4 [Sports Facility] Inverterization of Air Conditioning Fans

Reduced power consumption due to low-speed operation outside of indoor pool hours and on closed days.

Detects return air temperature and controls optimal airflow with an inverter. Reduces a significant amount of power through low-speed operation during non-business hours and on closed days. (Continuous operation throughout the year is necessary for the indoor pool's air conditioning to maintain dehumidification and ventilation.) 【Features】 ○ Control Method: Uses temperature sensors to control the rotation speed of the fan motor with an inverter. ○ Target Equipment: Air conditioning fan for indoor pool       Air conditioning supply fan (11.0kW), air conditioning return fan (11.0kW) For more details, please contact us or download the catalog.

  • Pool equipment related
  • Sports related facilities
  • Power distribution and control panels

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Case Study: Blower 1 [Office Building] - Inverterization of Supply and Exhaust Fans

Achieved low implementation costs compared to automatic control using general-purpose sensors.

We achieve low implementation costs compared to automatic control using general-purpose sensors. By utilizing a schedule timer, we manage energy-saving measures according to the operational status of the tenants. 【Features】 ○ Control Method: Time Schedule Control ○ Target Equipment: Indoor Ventilation System       Supply Fan (5.5kW) × 1 unit, Exhaust Fan (3.7kW) × 1 unit For more details, please contact us or download the catalog.

  • Automatic Control Equipment
  • Air compressors, blowers and pumps
  • Power distribution and control panels

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Case Study: Blower 2 [Commercial Facility] - Inverterization of Supply and Exhaust Fans

During the quiet hours of the underground parking lot, significantly reduce power consumption by controlling the motor's rotation speed.

Utilizing information from carbon monoxide concentration sensors. By controlling the rotation speed outside of peak times such as weekends and busy morning and evening hours, we can significantly reduce power consumption. 【Features】 ○ Target Equipment: Underground parking ventilation system       Parking supply and exhaust fans × 3 units (total capacity 90kW) ○ Control Method: Inverter control of fan motor rotation speed using carbon monoxide concentration sensors We will respond to various customer requests with optimal proposals and prompt implementation work. For more details, please contact us or download the catalog.

  • Automatic Control Equipment
  • Air compressors, blowers and pumps
  • Power distribution and control panels

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Case Study: Fan 3 [Accommodation Facility] Inverterization of Supply and Exhaust Fans

Detecting the operating status of kitchen equipment with sensors and controlling the intake and exhaust with an inverter to reduce power consumption.

By linking the supply and exhaust fans, the conditioned air is not unnecessarily released outside, improving air conditioning efficiency and reducing power consumption. Since busy hours vary due to banquet schedules, control is not based on time but instead uses sensors to detect the operating status of kitchen equipment and controls the supply and exhaust with an inverter. During times when no heating or cooking is taking place, temperature sensors and carbon dioxide concentration sensors help reduce the drying of served food. 【Features】 ○ Control Method: Inverter control of motor speed using temperature sensors and carbon dioxide concentration sensors ○ Target Equipment: Kitchen ventilation system       Supply fan (30.0 kW), Exhaust fan (37.0 kW) For more details, please contact us or download the catalog.

  • Automatic Control Equipment
  • Air compressors, blowers and pumps
  • Power distribution and control panels

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Case Study: Fan 4 [Office Building] - Inverter Conversion of Cooling Tower Fan

Eliminating abnormal noise caused by fan belt slippage at startup with gentle acceleration of the inverter.

The gentle acceleration of the inverter eliminates abnormal noises caused by fan belt slippage at startup (noise reduction effect). By adding rotational control via the inverter to the start-stop control method using temperature sensors, significant power savings are achieved. Controlling three motors with one 18.5kW inverter helps to reduce manufacturing and installation costs. 【Features】 ○ Control Method: Inverter control of fan motor speed using temperature sensors ○ Target Equipment: Absorption chiller/heater Cooling tower fans (5.5kW) × 3 units For more details, please contact us or download the catalog.

  • Air compressors, blowers and pumps
  • Power distribution and control panels
  • Refrigeration units, boilers, cooling towers

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Case Study: Fan 5 [Accommodation Facility] Inverterization of Supply and Exhaust Fans

Manage the operating status with the temperature of each exhaust duct and reduce power consumption by controlling the fan motor with an inverter.

In a kitchen where reducing airflow is difficult, the operating status is managed by the temperature of each exhaust duct, and the fan motor is controlled by an inverter. The coordination between the external air conditioning unit and the exhaust fan, which are located far apart, is also controlled by an inverter. 【Features】 ○ Control Method: Fan motor speed is controlled by an inverter using temperature sensors. ○ Target Equipment: Kitchen ventilation system External air conditioning unit (11.0 kW), exhaust fan (7.5 kW) For more details, please contact us or download the catalog.

  • Automatic Control Equipment
  • Air compressors, blowers and pumps
  • Power distribution and control panels

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Case Study: Fan 6 [Apartment] Inverterization of Supply and Exhaust Fans

The underground parking lot of the apartment has few entries and exits, and by reducing the ventilation volume, significant power savings are achieved.

The underground parking lot of the apartment has few entries and exits, and by reducing the ventilation volume, significant power savings are achieved. When the concentration rises, switching to high-speed operation manually reduces installation costs compared to automatic control. Carbon monoxide levels are monitored in the control room. 【Features】 ○ Control method: Simplified operation with a manual 4-speed switch ○ Target equipment: Underground parking supply fan (11.0 kW), Underground parking exhaust fan (22.0 kW) For more details, please contact us or download the catalog.

  • Automatic Control Equipment
  • Air compressors, blowers and pumps
  • Power distribution and control panels

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Case Study: Fan 7 [Commercial Facility] Inverterization of Exhaust Fan

Reduce power consumption by controlling the fan motor speed with an inverter using a carbon monoxide concentration sensor.

Control the rotation speed of the fan motor using an inverter based on the carbon monoxide concentration detected by a sensor installed on the roadway. By controlling the motor speed with the inverter during times with low traffic (excluding busy periods such as weekends and evenings), significant power savings can be achieved. 【Features】 ○ Control Method: Use of a carbon monoxide concentration sensor to control the rotation speed of the fan motor with an inverter. ○ Target Equipment: Underground parking exhaust fans (22.0 kW × 3 units) For more details, please contact us or download the catalog.

  • Automatic Control Equipment
  • Air compressors, blowers and pumps
  • Power distribution and control panels

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Case Study: Air Blower 8 [Office Building] - Inverterization of Supply and Exhaust Fans

Significant power reduction by controlling motor speed during off-peak hours.

The carbon monoxide concentration sensor installed in the exhaust duct controls the rotation speed of the supply fan motor and the exhaust fan motor using inverter control. By controlling the motor speed during off-peak hours, significant power savings can be achieved. 【Features】 ○ Control Method: Inverter control of fan motor speed using a carbon monoxide concentration sensor ○ Target Equipment: Underground parking supply fan (7.5kW),       Underground parking exhaust fan (7.5kW) For more details, please contact us or download the catalog.

  • Automatic Control Equipment
  • Air compressors, blowers and pumps
  • Power distribution and control panels

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Case Study: Fan 9 [Factory Facility] Inverterization of Exhaust Fan

Adjust the operation of the exhaust fan motor according to the equipment's operating status to reduce power consumption.

During the lunch break, adjust the operation of the exhaust fan motor according to the equipment's operating status to reduce power consumption. We propose and install compactly designed inverter panels even in space-constrained factories. 【Features】 ○ Control Method: Simplified operation using a manual 4-speed switch ○ Target Equipment: Factory ventilation system       Cutting oil mist exhaust fan (11.0kW) For more details, please contact us or download the catalog.

  • Automatic Control Equipment
  • Air compressors, blowers and pumps
  • Power distribution and control panels

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Case Study: Pump 1 [Public Facility] Inverterization of Chilled and Hot Water Pump

Perform inverter operation to drive the pump with high efficiency and save electricity.

To adjust the flow, the valve that was partially closed was opened, and by regulating the flow with an inverter, significant power savings were achieved. The inverter operates at the optimal and minimum frequency based on signals from pressure sensors and flow sensors, driving the pump with high efficiency for energy conservation. To prevent the loss of flow that cannot be reduced by the inverter during low demand periods, bypass valve control is also used. 【Features】 ○ Control Method: The rotation speed of the pump motor is controlled by the inverter using pressure sensors and flow sensors. ○ Target Equipment: Absorption chiller/heater       Secondary chilled/heated water pumps (11.0 kW) × 2 units For more details, please contact us or download the catalog.

  • Piping and insulation
  • Power distribution and control panels
  • District heating and cooling/heat source system

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Case Study: Pump 2 [Commercial Facility] Inverterization of Cooling Water Pump

Monitor the temperature of the cooling water outlet and further reduce power consumption through inverter control except during the peak summer daytime.

The flow rate sent to the cold water pump was adjusted by throttling the valve, but significant reductions in power consumption were achieved by controlling it with an inverter. By monitoring the temperature at the cooling water outlet with a temperature sensor, the pump motor's rotation speed can be controlled by the inverter, allowing for further energy savings except during the peak summer daytime. 【Features】 ○ Control Method: Pump motor rotation speed controlled by inverter using a temperature sensor ○ Target Equipment: Absorption chiller       Cooling water pump (200V/55.0kW) For more details, please contact us or download the catalog.

  • Power distribution and control panels
  • District heating and cooling/heat source system
  • Refrigeration units, boilers, cooling towers

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Case Study: Pump 3 [Hospitals and Care Facilities] Inverterization of Chilled and Hot Water Pumps

Control the required flow rate with an inverter using a temperature sensor to reduce power consumption.

Control the required flow rate with an inverter based on the temperature difference at the inlet and outlet of the absorption chiller, significantly reducing power consumption during light load conditions. By alternating the operation of two pumps controlled by a single inverter, we reduce installation costs. 【Features】 ○ Control Method: Temperature Control ○ Target Equipment: Air-Cooled Heat Pump Chiller Chilled and Hot Water Pumps (11.0 kW × 2 alternating switch type) For more details, please contact us or download the catalog.

  • Power distribution and control panels
  • District heating and cooling/heat source system
  • Refrigeration units, boilers, cooling towers

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Case Study: Pump 4 [Condominium] Inverterization of Chilled and Hot Water Pumps

It is possible to convert pumps to inverters at a low cost.

By opening the valve and adjusting the inverter to the same flow rate as before, power consumption is reduced. Since control is not performed using sensors for temperature, pressure, or flow rate, it can be implemented at a low cost. Five inverters are compactly installed on one panel. 【Features】 ○ Control Method: Fixed frequency (constant flow) control ○ Target Equipment: Absorption chiller/heater Primary chilled and hot water pump (2.2kW × 2 units), Secondary chilled and hot water pump (3.7kW × 3 units) For more details, please contact us or download the catalog.

  • Piping and insulation
  • Power distribution and control panels
  • District heating and cooling/heat source system

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Case Study: Pump 5 [Commercial Facility] Inverterization of Chilled Water Pump

By using a temperature sensor in conjunction, further power reduction is achieved through inverter control.

By opening the valve and adjusting the inverter to the same flow rate as before, we reduce the power consumption of the pump. By combining temperature control and variable control of the inverter frequency, we implement further energy savings. Additionally, by using compressor current control for the turbo chiller itself, we prevent overload due to insufficient cooling water. 【Features】 ○ Control Method: Using temperature sensors to control the pump motor speed with the inverter ○ Target Equipment: Turbo chiller       Cooling water pump (75.0 kW), Chilled water primary pump (55.0 kW) For more details, please contact us or download the catalog.

  • Piping and insulation
  • Power distribution and control panels
  • Refrigeration units, boilers, cooling towers

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Case Study: Pump 6 [Public Facility] Inverter Conversion of Chilled and Hot Water Pumps

Support with low-cost inverter panels (EBL series), shortening the investment recovery period for equipment.

By opening the valve and adjusting the inverter to the same flow rate as before, power consumption is reduced. For educational facilities, during breaks, the switch is operated to switch to low-speed operation for further energy savings. Since control using sensors for temperature, pressure, and flow rate is not performed, it can be implemented at a low cost. The low-cost inverter panel (EBL series) is used to shorten the investment recovery period. 【Features】 ○ Control method: The rotation speed of the pump motor is controlled by the inverter using a manual step switch. ○ Target equipment: Absorption chiller/heater Chilled and hot water pumps (11.0 kW × 2 units) For more details, please contact us or download the catalog.

  • Piping and insulation
  • Power distribution and control panels
  • District heating and cooling/heat source system

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Case Study: Pump 7 [Sports Facility] - Inverterization of Filtration Pump

Inverter control considering the backwashing operation of the filtration device and the number of circulation cycles (turns).

We will implement a scheduled operation where the speed is high during business hours and low outside of business hours (such as at night or on closed days). To maintain water quality, we will use inverter control that takes into account backwashing and circulation frequency (turns). We will use a low-cost inverter panel (EBL series) to shorten the investment recovery period. 【Features】 ○ Control methods: Time schedule control, temperature control, manual step speed control ○ Target equipment: Pool filtration pump (5.5kW) For more details, please contact us or download the catalog.

  • Pool equipment related
  • Sports related facilities
  • Power distribution and control panels

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Update Case 1 [Accommodation Facility] Operational Improvement (Visualization during Abnormal Occurrences)

Added abnormal indicator lights and abnormal buzzers to enable response even when facility personnel are absent.

Before the update, inverter abnormalities occurred occasionally, and recovery work was handled by cutting off the power breaker since the error information was unclear. After the update, an inverter abnormality indicator light was installed in a more visible location, and an abnormality buzzer was also installed in the security room, allowing for response even when the facility manager is not present. 【Features】 - Installation of indicators and buzzers to notify of inverter abnormalities, enabling response even when the facility manager is absent. - Target equipment: Inverter for chilled and hot water pumps (200V / 15.0kW) For more details, please contact us or download the catalog.

  • Automatic Control Equipment
  • Power distribution and control panels

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Update Case 2 [Accommodation Facility] Operational Improvement (Addition of Frequency Switch)

Anyone can easily change the frequency according to the season and busyness.

Before the update, the equipment manager adjusted the frequency using the up and down keys on the inverter while monitoring the operating conditions. After the update, anyone can easily change the frequency to any desired setting that matches the season or busy periods using a manual four-speed switch. 【Features】 ○ Installation of a manual four-speed switch for simplified switching operations ○ Target equipment: Inverter for return air fan (400V/11.0kW) For more details, please contact us or download the catalog.

  • Automatic Control Equipment
  • Power distribution and control panels

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Update Case 3: Accommodation Facilities - Operational Improvement, Continuous Operation Measures, and Simplification of Frequency Switching

Simplification of frequency variable operation according to seasons and busy periods.

Before the update, when a problem occurred, the equipment would stop, and operations could not continue. The equipment manager adjusted the frequency using the up and down keys on the inverter while monitoring the operating conditions. After the update, in the event of an inverter malfunction, it automatically switches to commercial operation, allowing the equipment to continue running. A manual four-speed switch has been installed, making it easier to adjust the frequency to any desired level according to the season or busy periods. 【Features】 ○ Installation of a manual four-speed switch for simplified switching operations ○ Target equipment: Inverter for ventilation fans (400V/7.5kW) For more details, please contact us or download the catalog.

  • Automatic Control Equipment
  • Power distribution and control panels

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Case Study 4: [Office Building] Operational Improvement (Standardization of Inverter Manufacturers)

The inverter becomes understandable for facility managers, improving maintenance capabilities.

Before the update, the inverter, which had been installed for over ten years, had a built-in sequence circuit for frequency display, but the failure information and operation methods were unclear. After the update, the inverter became user-friendly for facility personnel, improving maintenance capabilities. 【Features】 ○ The inverter became user-friendly, enhancing maintenance capabilities. ○ Target equipment: Inverter for total heat exchanger blower (200V/15.0kW) For more details, please contact us or download the catalog.

  • Automatic Control Equipment
  • Air compressors, blowers and pumps
  • Power distribution and control panels

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Case Study 5 [Commercial Facility] Operational Improvement (Improvement of Energy Saving Rate through Automated Control)

Added variable speed control based on temperature and carbon dioxide concentration. Improved average energy-saving rate to over 60%.

Before the update, the machine room was located far away, making it almost impossible to adjust the frequency using an inverter. After the update, we improved the average energy-saving rate to over 60% by using temperature sensors and carbon dioxide concentration sensors to control the fan motor with an inverter. 【Features】 ○ Inverter control of the fan motor's rotation speed using temperature sensors and carbon dioxide concentration sensors ○ Target equipment: Inverters for air conditioning units and exhaust fans (400V/30.0kW, 18.5kW) For more details, please contact us or download the catalog.

  • Automatic Control Equipment
  • Power distribution and control panels

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Update Case 6 [Accommodation Facility] Operational Improvement (Recovery of Faulty Inverter, etc.)

Installed a manual 4-speed transmission switch. Contributes to reducing food drying through low air volume operation.

Before the update, strong winds affected the dishes, causing the surface to dry out, and during inverter operation, the person in charge could not adjust the speed consistently. After the update, low air volume operation contributed to reducing the drying of the dishes. Switching the air volume according to the season and busy periods has become easy for anyone. 【Features】 ○ Simplified air volume switching operation using a manual 4-speed switch ○ Target equipment: Banquet hall air conditioning units (blowers, exhaust fans) inverter (400V / 5.5kW x 2 units) For more details, please contact us or download the catalog.

  • Automatic Control Equipment
  • Air compressors, blowers and pumps
  • Power distribution and control panels

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Improvement Case 1 [Accommodation Facility] Stabilization of Hot Water Pump Temperature

Resolved 0 complaints from 5 to 6 per month. The discharge amount (temperature) during shower use is stable.

We addressed the issue of unstable hot water temperature during peak shower usage times in guest rooms by adding control to maintain a constant discharge pressure with an inverter. This allows us to consistently supply showers with stable temperatures to the guest rooms. 【Features】 ○ Control Method: Pressure Control ○ Target Equipment: Oil Supply Booster Pump (7.5kW) For more details, please contact us or download the catalog.

  • pump
  • Water supply facilities
  • Power distribution and control panels

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Improvement Case 2 [Office Building] Stopping the Cooling Fan Belt Noise

The inverter enables smooth acceleration, eliminating belt squeaking at startup and extending lifespan.

When the cooling fan starts, the belt that drives it slips, causing a squeaking noise as it rubs against the pulley. Due to its installation on the roof, complaints have arisen from nearby apartments. Because the fan turns on and off dozens of times a day depending on the set temperature, there are many complaints, and the belt also experiences significant wear. This issue has been improved by implementing gentle acceleration through an inverter, which eliminates the belt squeak and extends its lifespan. 【Features】 ○ Control method: Gentle acceleration operation using an inverter ○ Target equipment: Cooling fan (for air-cooled heat pump chiller) (5.5kW × 2 units) For more details, please contact us or download the catalog.

  • Automatic Control Equipment
  • Power distribution and control panels
  • Refrigeration units, boilers, cooling towers

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Improvement Case 3 [Hospital/Care Facility] Prevention of Pump Impeller Damage

Prevention of water hammer, damage to the impeller, and prevention of wear.

The problem of the impeller frequently breaking due to water hammer during the pump's startup, leading to equipment downtime and costs amounting to millions for repairs, has been resolved through smooth acceleration using a soft starter. Measures have been taken to prevent water hammer, impeller damage, and wear. 【Features】 ○ Control method: Stepless acceleration operation using a soft starter ○ Target equipment: Water lifting pumps (37.0 kW × 3 units) For more details, please contact us or download the catalog.

  • Piping and insulation
  • pump
  • Power distribution and control panels

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
Prev 1 Next
  • イプロスがリアル展示会を主催します! AI/DX 営業・マーケティング展 出展社募集中 リード数・商談数が止まらない!新しいリアル展示会を提供 会期 2026年3月24日(火)~25日(水) 会場 東京ビッグサイト東4ホール 出展概要資料を進呈!
    • Contact this company

      Contact Us Online
    • Before making an inquiry

      Download PDF

    Products

    • Search for Products

    Company

    • Search for Companies

    Special Features

    • Special Features

    Ranking

    • Overall Products Ranking
    • Overall Company Ranking

    support

    • site map
    IPROS
    • privacy policy Regarding external transmission of information
    • terms of service
    • About Us
    • Careers
    • Advertising
    COPYRIGHT © 2001-2025 IPROS CORPORATION ALL RIGHTS RESERVED.
    Please note that the English text on this page is automatically translated and may contain inaccuracies.