iPROS Urban Planning
  • Search for products by classification category

    • Building Materials
      Building Materials
      35366items
    • Facilities
      Facilities
      55928items
    • Lighting and Interior
      Lighting and Interior
      17175items
    • Common materials
      Common materials
      36600items
    • Civil Engineering Materials
      Civil Engineering Materials
      9526items
    • Construction, work and methods
      Construction, work and methods
      27269items
    • Surveys, Measurements, and Services
      Surveys, Measurements, and Services
      29208items
    • IT/Software
      IT/Software
      32309items
    • others
      others
      76364items
    • Store and facility supplies
      Store and facility supplies
      4339items
    • Office and commercial supplies
      Office and commercial supplies
      11356items
    • Hospital and welfare facility supplies
      Hospital and welfare facility supplies
      948items
    • Logistics Equipment
      Logistics Equipment
      6748items
    • Energy and Resources
      Energy and Resources
      11533items
  • Search for companies by industry

    • Information and Communications
      7210
    • others
      7011
    • Building materials, supplies and fixtures manufacturers
      6665
    • Service Industry
      4638
    • Trading company/Wholesale
      2998
    • Other construction industries
      2453
    • Electrical equipment construction business
      642
    • Interior Design
      526
    • Facility Design Office
      490
    • Construction Consultant
      464
    • Architectural design office
      361
    • retail
      345
    • Warehousing and transport related industries
      322
    • Electricity, Gas and Water Industry
      290
    • General contractors and subcontractors
      286
    • Interior construction business
      275
    • Medical and Welfare
      274
    • Educational and Research Institutions
      257
    • Building Management
      252
    • Renovation and home construction industry
      223
    • Water supply and drainage construction business
      202
    • Housing manufacturers and construction companies
      186
    • Transportation
      161
    • Real Estate Developers
      155
    • Fisheries, Agriculture and Forestry
      126
    • Structural Design Office
      66
    • Finance, securities and insurance
      36
    • Restaurants and accommodations
      30
    • self-employed
      29
    • Mining
      26
    • Public interest/special/independent administrative agency
      18
    • Police, Fire Department, Self-Defense Forces
      18
    • Store and building owners
      9
    • Property Owner
      8
    • Government
      8
    • Individual
      8
  • Special Features
  • Ranking

    • Overall Products Ranking
    • Overall Company Ranking
Search for Products
  • Search for products by classification category

  • Building Materials
  • Facilities
  • Lighting and Interior
  • Common materials
  • Civil Engineering Materials
  • Construction, work and methods
  • Surveys, Measurements, and Services
  • IT/Software
  • others
  • Store and facility supplies
  • Office and commercial supplies
  • Hospital and welfare facility supplies
  • Logistics Equipment
  • Energy and Resources
Search for Companies
  • Search for companies by industry

  • Information and Communications
  • others
  • Building materials, supplies and fixtures manufacturers
  • Service Industry
  • Trading company/Wholesale
  • Other construction industries
  • Electrical equipment construction business
  • Interior Design
  • Facility Design Office
  • Construction Consultant
  • Architectural design office
  • retail
  • Warehousing and transport related industries
  • Electricity, Gas and Water Industry
  • General contractors and subcontractors
  • Interior construction business
  • Medical and Welfare
  • Educational and Research Institutions
  • Building Management
  • Renovation and home construction industry
  • Water supply and drainage construction business
  • Housing manufacturers and construction companies
  • Transportation
  • Real Estate Developers
  • Fisheries, Agriculture and Forestry
  • Structural Design Office
  • Finance, securities and insurance
  • Restaurants and accommodations
  • self-employed
  • Mining
  • Public interest/special/independent administrative agency
  • Police, Fire Department, Self-Defense Forces
  • Store and building owners
  • Property Owner
  • Government
  • Individual
Special Features
Ranking
  • Overall Products Ranking
  • Overall Company Ranking
  • privacy policy
  • terms of service
  • About Us
  • Careers
  • Advertising
  1. Home
  2. Other construction industries
  3. エルニード協会
  4. Product/Service List
Other construction industries
  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration

エルニード協会

addressKagawa/Takamatsu-shi/2485-21 Nishimachi, Wakayama
phone087-841-0161
  • Special site
  • Official site
last updated:Jun 18, 2025
エルニード協会logo
  • Contact this company

    Contact Us Online
  • Before making an inquiry

    Download PDF
  • Company information
  • Products/Services(56)
  • catalog(14)
  • news(0)

エルニード協会 List of Products and Services

  • category

46~56 item / All 56 items

Displayed results

Filter by category

Super Rappu El Nido Method Super Rappu El Nido Method
Ground improvement work Ground improvement work
Shallow and intermediate layer mixed treatment method Shallow and intermediate layer mixed treatment method
Slurry-type mechanical stirring block ground improvement method Slurry-type mechanical stirring block ground improvement method
Super Rappuru Basic Construction Method Super Rappuru Basic Construction Method
Koshinetsu Area (Elneed Koshinetsu Co., Ltd.) Koshinetsu Area (Elneed Koshinetsu Co., Ltd.)
Chubu Japan Area (Elneed Chubu Co., Ltd.) Chubu Japan Area (Elneed Chubu Co., Ltd.)
Kyushu Okinawa Area (Elneed Kyushu Co., Ltd.) Kyushu Okinawa Area (Elneed Kyushu Co., Ltd.)
Chugoku-Shikoku Area (Elneed Chugoku-Shikoku Co., Ltd.) Chugoku-Shikoku Area (Elneed Chugoku-Shikoku Co., Ltd.)
Tohoku Area (Elneed Tohoku Co., Ltd.) Tohoku Area (Elneed Tohoku Co., Ltd.)
Hokkaido, Kanto region, Kansai region area (Neo Need Co., Ltd.) Hokkaido, Kanto region, Kansai region area (Neo Need Co., Ltd.)
class="retina-image"

Rubble Concrete Super Rubble Elneed Method

[NETIS Registration] It is active in a wide range of applications as a fundamental construction method that responds to various situations!

We would like to introduce the feature of the "Super Rappuru Erunido Method," which makes it easy to confirm the supporting layer. By excavating down to the bearing ground, visual confirmation and tactile examination through the removal of the bearing ground can be performed, allowing for direct judgment and increasing reliability. Additionally, by using different devices according to the soil type, high-quality and uniform construction has become possible. 【Features】 ■ Excellent cost-effectiveness ■ Shortened construction period and high-quality fill ■ Minimal excess soil on site (amount of disposal soil) ■ Quick response to various sites *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Achieving both a reduction in construction days and cost savings! Ground improvement work using the Rapple foundation method.

[NETIS Registration] Achieving low costs! Utilizing the advantages of construction methods to create high-quality land development that considers the environment.

We would like to introduce the excellent economic efficiency of the "Super Lapple Elneed Method." Since it is constructed using direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site preparation at each location. Through numerous trial constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality site preparations with minimal variation in strength. 【Features】 ■ Easy confirmation of the support layer ■ Shortened construction period and high-quality site preparation ■ Minimal excess soil on site (remaining disposal soil volume) ■ Agile response to various sites *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Slurry-type mechanical stirring block ground improvement method - El Nido method

[NETIS Registration] Supporting the form of the earth with reliable technology! Appropriate and safe design tailored to the application.

We would like to introduce the features of the "Super Rappuru Erunido Method," which include shortened construction periods and high-quality embankments. By using different buckets according to the soil type for mixing, it enables the creation of high-quality improved materials and also enhances efficiency. Additionally, the time from excavation to completion of the embankment is short, and in most cases, direct excavation is possible, eliminating the need for excess excavation and the setting and removal of formwork. 【Features】 ■ Excellent cost-effectiveness ■ Easy confirmation of support layers ■ Minimal excess soil on site (remaining disposal soil volume) ■ Agile response to various sites *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Shallow and Intermediate Layer Mixed Treatment Method - Super Rappelle Erneed Method

[NETIS Registration] Achieving low costs! Utilizing the advantages of construction methods to create high-quality land development with consideration for the environment.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Erunido Method." Since it is constructed through direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site development for each location. Through numerous trial constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality development bodies with minimal strength variation. 【Features】 ■ Easy confirmation of the supporting layer ■ Shortened construction period and high-quality development body ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[NETIS Registration] Ground Improvement Work Super Rappu Elniido Method

Supporting the form of the earth with reliable technology! Appropriate and safe design tailored to the application.

We would like to introduce the features of the "Super Rappuru Elniido Method," which include shortened construction periods and high-quality embankments. By using different buckets according to soil type for mixing, it enables the creation of high-quality improved materials and also enhances efficiency. Additionally, the time from excavation to completion of the embankment is short, and in most cases, direct excavation is possible, eliminating the need for excess excavation and the setting and removal of formwork. 【Features】 ■ Excellent cost-effectiveness ■ Easy confirmation of support layers ■ Minimal excess soil on site (remaining disposal soil volume) ■ Quick response to various sites *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

<Capable of responding swiftly to various sites> Super Rappuru Erunido Method

[NETIS Registration] Capable of responding to various situations and active in a wide range of applications! A technology that allows for direct confirmation of the quality of the fill material and the supporting ground.

We would like to introduce the "Super Lapple Elneed Method," which can respond swiftly to various job sites. This method allows for excavation and improvement even in ground containing cobbles and boulders, and it enables water volume adjustments according to site conditions in response to changes in soil moisture content and unexpected groundwater. By incorporating an adjusted moisture content into the mix design, the uniformity of the constructed body is enhanced. Please feel free to contact us when you need our services. 【Features】 ■ Excellent cost-effectiveness ■ Easy confirmation of support layers ■ Shortened construction period and high-quality constructed body ■ Minimal excess soil on site *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[NETIS Registration] Basic Construction Method: Super Lapel Elneed Method

High-quality construction materials that consider the environment! Using attachments compatible with various soil types.

We would like to introduce the feature of the "Super Rappuru Elniido Method," which is that it generates minimal excess soil on site. Since this method involves mixing site-generated soil with solidifying agents, it produces less residual soil compared to conventional methods, making disposal easier. Additionally, by excavating down to the supporting ground, visual confirmation and tactile inspection through the removal of the supporting ground are possible, allowing for direct judgment and thereby increasing reliability. [Features] ■ Excellent cost-effectiveness ■ Easy confirmation of the supporting layer ■ Shortened construction period and high-quality embankment ■ Agile response to various sites *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Super Rappu Elniido Method - Shortening Construction Period! Ground Improvement Work

[NETIS Registration] Supporting the form of the earth with reliable technology! Appropriate and safe design tailored to the application.

We would like to introduce the features of the "Super Rappuru Erunido Method," which include shortened construction periods and high-quality embankments. By using different buckets according to soil types for mixing, it enables the creation of high-quality improved materials and also enhances efficiency. Additionally, the time from excavation to completion of embankment is short, and in most cases, direct excavation is possible, eliminating the need for excess excavation and the setting and removal of formwork. 【Features】 ■ Excellent cost-effectiveness ■ Easy confirmation of support layers ■ Minimal excess soil on site (remaining disposal soil volume) ■ Quick response to various sites *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Achieving low-cost construction! Rappuru concrete foundation ground improvement work.

[NETIS Registration] It is active in a wide range of applications as a fundamental construction method that responds to various situations!

We would like to introduce the feature of the "Super Rappuru Erunido Method," which makes it easy to confirm the supporting layer. By excavating down to the supporting ground, visual confirmation and tactile examination through the removal of the supporting ground are possible, allowing for direct judgment and increasing reliability. Additionally, by using different equipment according to the soil type, it has become possible to achieve high-quality and uniform construction. 【Features】 ■ Excellent cost-effectiveness ■ Shortened construction period and high-quality fill ■ Minimal excess soil on site (remaining disposal soil volume) ■ Agile response to various sites *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Environmentally friendly super rubble elnid construction method using fluidized treatment soil.

[NETIS Registration] Achieving low costs! Utilizing the advantages of construction methods to create high-quality, environmentally friendly development bodies.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Erunido Method." Since it is constructed using direct excavation, it reduces the processes of excess excavation, setting up, and removing formwork. The construction can be completed in a short time from excavation to site development for each location. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality development bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality development bodies ■ Minimal excess soil on site (remaining disposal soil amount) ■ Quick response to various sites *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[NETIS Registration] Super Wrap L Elneed Method

Foundation construction method using fluidized treatment soil! Joint research and development with the National Institute for Land and Infrastructure Management.

The "Super Rappuru Erunido Method" is a construction method that realizes "simplicity, clarity, and reliability." Considering soil quality, high quality, and uniformity, various buckets such as cut & mixing buckets, M mixing buckets, and skeleton mixing buckets are used appropriately during construction. Additionally, to achieve high quality, we thoroughly manage quality by addressing changes in soil quality during construction, changes in groundwater levels, and ensuring reliable confirmation of the supporting ground. 【Features】 ■ Minimal leftover soil ■ Easy confirmation of the supporting layer ■ Strength management can be performed as needed ■ Quick response to changes in natural soil moisture content ■ No compaction required ■ Increased adhesion prevents liquefaction *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
Prev 12 Next
  • イプロスがリアル展示会を主催します! AI/DX 営業・マーケティング展 出展社募集中 リード数・商談数が止まらない!新しいリアル展示会を提供 会期 2026年3月24日(火)~25日(水) 会場 東京ビッグサイト東4ホール 出展概要資料を進呈!
    • Contact this company

      Contact Us Online
    • Before making an inquiry

      Download PDF

    Products

    • Search for Products

    Company

    • Search for Companies

    Special Features

    • Special Features

    Ranking

    • Overall Products Ranking
    • Overall Company Ranking

    support

    • site map
    IPROS
    • privacy policy Regarding external transmission of information
    • terms of service
    • About Us
    • Careers
    • Advertising
    COPYRIGHT © 2001-2025 IPROS CORPORATION ALL RIGHTS RESERVED.
    Please note that the English text on this page is automatically translated and may contain inaccuracies.