iPROS Urban Planning
  • Search for products by classification category

    • Building Materials
      Building Materials
      36716items
    • Facilities
      Facilities
      57280items
    • Lighting and Interior
      Lighting and Interior
      17483items
    • Common materials
      Common materials
      37163items
    • Civil Engineering Materials
      Civil Engineering Materials
      10005items
    • Construction, work and methods
      Construction, work and methods
      28653items
    • Surveys, Measurements, and Services
      Surveys, Measurements, and Services
      29704items
    • IT/Software
      IT/Software
      33234items
    • others
      others
      80827items
    • Store and facility supplies
      Store and facility supplies
      4579items
    • Office and commercial supplies
      Office and commercial supplies
      11659items
    • Hospital and welfare facility supplies
      Hospital and welfare facility supplies
      1023items
    • Logistics Equipment
      Logistics Equipment
      7279items
    • Energy and Resources
      Energy and Resources
      12068items
  • Search for companies by industry

    • Information and Communications
      7306
    • others
      7196
    • Building materials, supplies and fixtures manufacturers
      6578
    • Service Industry
      4699
    • Trading company/Wholesale
      3020
    • Other construction industries
      2426
    • Electrical equipment construction business
      636
    • Interior Design
      519
    • Facility Design Office
      491
    • Construction Consultant
      480
    • retail
      361
    • Architectural design office
      356
    • Warehousing and transport related industries
      324
    • General contractors and subcontractors
      321
    • Electricity, Gas and Water Industry
      287
    • Interior construction business
      279
    • Medical and Welfare
      274
    • Building Management
      262
    • Educational and Research Institutions
      253
    • Renovation and home construction industry
      221
    • Water supply and drainage construction business
      203
    • Housing manufacturers and construction companies
      190
    • Transportation
      164
    • Real Estate Developers
      157
    • Fisheries, Agriculture and Forestry
      127
    • Structural Design Office
      65
    • Finance, securities and insurance
      40
    • self-employed
      31
    • Restaurants and accommodations
      30
    • Mining
      26
    • Public interest/special/independent administrative agency
      20
    • Police, Fire Department, Self-Defense Forces
      17
    • Store and building owners
      9
    • Government
      9
    • Individual
      9
    • Property Owner
      8
  • Special Features
  • Ranking

    • Overall Products Ranking
    • Overall Company Ranking
Search for Products
  • Search for products by classification category

  • Building Materials
  • Facilities
  • Lighting and Interior
  • Common materials
  • Civil Engineering Materials
  • Construction, work and methods
  • Surveys, Measurements, and Services
  • IT/Software
  • others
  • Store and facility supplies
  • Office and commercial supplies
  • Hospital and welfare facility supplies
  • Logistics Equipment
  • Energy and Resources
Search for Companies
  • Search for companies by industry

  • Information and Communications
  • others
  • Building materials, supplies and fixtures manufacturers
  • Service Industry
  • Trading company/Wholesale
  • Other construction industries
  • Electrical equipment construction business
  • Interior Design
  • Facility Design Office
  • Construction Consultant
  • retail
  • Architectural design office
  • Warehousing and transport related industries
  • General contractors and subcontractors
  • Electricity, Gas and Water Industry
  • Interior construction business
  • Medical and Welfare
  • Building Management
  • Educational and Research Institutions
  • Renovation and home construction industry
  • Water supply and drainage construction business
  • Housing manufacturers and construction companies
  • Transportation
  • Real Estate Developers
  • Fisheries, Agriculture and Forestry
  • Structural Design Office
  • Finance, securities and insurance
  • self-employed
  • Restaurants and accommodations
  • Mining
  • Public interest/special/independent administrative agency
  • Police, Fire Department, Self-Defense Forces
  • Store and building owners
  • Government
  • Individual
  • Property Owner
Special Features
Ranking
  • Overall Products Ranking
  • Overall Company Ranking
  • privacy policy
  • terms of service
  • About Us
  • Careers
  • Advertising
  1. Home
  2. Other construction industries
  3. エルニード協会
  4. Product/Service List
Other construction industries
  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration

エルニード協会

addressKagawa/Takamatsu-shi/2485-21 Nishimachi, Wakayama
phone087-841-0161
  • Special site
  • Official site
last updated:Jun 18, 2025
エルニード協会logo
  • Contact this company

    Contact Us Online
  • Before making an inquiry

    Download PDF
  • Company information
  • Products/Services(103)
  • catalog(31)
  • news(0)

エルニード協会 List of Products and Services

  • category

46~58 item / All 58 items

Displayed results

Filter by category

Super Rappu El Nido Method Super Rappu El Nido Method
Ground improvement work Ground improvement work
Shallow and intermediate layer mixed treatment method Shallow and intermediate layer mixed treatment method
Slurry-type mechanical stirring block ground improvement method Slurry-type mechanical stirring block ground improvement method
Super Rappuru Basic Construction Method Super Rappuru Basic Construction Method
Koshinetsu Area (Elneed Koshinetsu Co., Ltd.) Koshinetsu Area (Elneed Koshinetsu Co., Ltd.)
Chubu Japan Area (Elneed Chubu Co., Ltd.) Chubu Japan Area (Elneed Chubu Co., Ltd.)
Kyushu Okinawa Area (Elneed Kyushu Co., Ltd.) Kyushu Okinawa Area (Elneed Kyushu Co., Ltd.)
Chugoku-Shikoku Area (Elneed Chugoku-Shikoku Co., Ltd.) Chugoku-Shikoku Area (Elneed Chugoku-Shikoku Co., Ltd.)
Tohoku Area (Elneed Tohoku Co., Ltd.) Tohoku Area (Elneed Tohoku Co., Ltd.)
Hokkaido, Kanto region, Kansai region area (Neo Need Co., Ltd.) Hokkaido, Kanto region, Kansai region area (Neo Need Co., Ltd.)
Slurry-type

Slurry-type mechanical stirring block ground improvement method

The Super Rappu L Elniido method is a construction technique that uses stabilized soil created by mixing construction-generated soil with water and cement-based solidifying agents, further improving the Rappu concrete method for construction foundations.

Ground improvement work in Wakayama Prefecture! Super Rappu Elniido method.

[NETIS Registration] A construction technique has been established that is easy for anyone to understand and directly confirms the reliability of the constructed body!

The "Super Rappuru Basic Construction Method" uses stabilized soil created by mixing construction-generated soil with water and cement-based solidifying agents, and is an improved method of the Rappuru concrete construction method for building foundations. The design utilizes various design standards based on the Japan Architectural Institute's "Construction Structural Design Guidelines," and similarly to the design of Rappuru concrete, it examines the ground bearing capacity and settlement based on boring data, determining the strength of the fill and the mixing plan (estimation). Prior to construction, on-site soil is collected, and soil analysis and indoor mixing tests are conducted to determine the mixing quantities and the effective range of flow values. [Features] ■ Establishment of theoretical framework: Reliable ■ Development and improvement of equipment: Fast ■ Easy-to-understand construction techniques: Certain *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Yamaguchi Prefecture! Super Rappu El Nido method.

[NETIS Registration] Achieving shortened construction periods and low costs! Capable of handling groundwater and soft ground!

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed using direct excavation, it reduces the processes of excess excavation, as well as the setting up and removal of formwork. Construction can be completed in a short time from excavation to site development for each location. Through numerous trial constructions in various ground conditions, we have established know-how in testing systems, mix design, construction management, and the development of mixing buckets, enabling us to create high-quality site development with minimal variation in strength. 【Features】 ■ Easy confirmation of the supporting layer ■ Shortened construction period and high-quality site development ■ Minimal surplus soil (disposal leftover amount) on site ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Fukuoka Prefecture! Super Rappu Elniido method.

【NETIS Registration】 Capable of addressing problematic ground issues such as "cost reduction," "shortened construction period," "groundwater emergence," and "soft ground"!

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed using direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site preparation for each location. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality site preparation with minimal variation in strength. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality site preparation ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Saga Prefecture! Super Rappu Elneed method.

[NETIS Registration] Achieving shortened construction periods and low costs! Utilizing the advantages of construction methods to create high-quality development bodies with consideration for the environment.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Erunido Construction Method." Since it is constructed through direct excavation, it reduces the processes of over-excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site development for each location. Through numerous trial constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling the creation of high-quality development bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality development bodies ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Nagasaki Prefecture! Super Rappu Elniido method.

[NETIS Registration] Nagasaki Prefecture, which is compatible with the construction method! Achieving shortened construction periods and low costs! The Super Rappu El Nido method, which is expected to have particular advantages in remote islands.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed by direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Through trial constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality embankments with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality embankments ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Oita Prefecture! Super Rappu Elneed method.

[NETIS Registration] Capable of handling groundwater, weak ground, and large boulders where piles cannot be installed! The Super Rappu Elneed method achieves shortened construction periods and cost reductions.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed by direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. It allows for quick construction from excavation to completion at each site. Through numerous trial constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality construction bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality construction bodies ■ Minimal excess soil on site (disposal residual soil volume) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Kumamoto Prefecture! Super RAPL El Nido method.

[NETIS Registration] Capable of addressing "groundwater" and "soft ground"! A super wrap-around needle method that achieves "shortened construction periods" and "cost reduction."

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed through direct excavation, it reduces the processes of over-excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site preparation for each location. Through numerous test constructions in various ground conditions, we have established know-how in test systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality site preparations with minimal variation in strength. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality site preparation ■ Minimal excess soil on site (disposal soil volume) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Miyazaki Prefecture! Super RAPL Elneed method.

[NETIS Registration] Capable of addressing "groundwater" and "soft ground"! The Super Lapel Elneed Method achieves "shortened construction periods" and "cost reduction."

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed by direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. It allows for quick construction from excavation to completion at each site. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality construction bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality construction bodies ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Kagoshima Prefecture! Super Rappu Elneed method.

[NETIS Registration] Achieve "shortened construction periods" and "cost reduction" for problematic ground such as "groundwater" and "soft ground"!

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Method." Since it is constructed through direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site preparation for each location. Through numerous trial constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality site preparation with minimal variation in strength. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality site preparation ■ Minimal surplus soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Okinawa Prefecture! Super Ruple El Nido method.

[NETIS Registration] Super Rappu El Nido method, which is expected to have significant cost advantages, especially in remote islands such as Okinawa, Ishigaki Island, and Miyako Island!

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed using direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site preparation for each location. Through numerous test constructions on various ground types, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling the creation of high-quality site preparation with minimal variation in strength. [Features] - Easy confirmation of the support layer - Shortened construction period and high-quality site preparation - Minimal excess soil on site (amount of disposal soil) - Capable of appropriately responding to the unique ground conditions of Okinawa - Can handle sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in the Kyushu and Okinawa regions! Super Ruple El Nido method.

[NETIS Registration] Achieving low cost and shortened construction period! Utilizing the advantages of the construction method to create high-quality development bodies with consideration for the environment.

We would like to introduce the excellent economic efficiency of the "Super Rappu Elniido Construction Method." Since it is constructed through direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. It allows for quick construction from excavation to completion at each location. Through numerous test constructions in various ground conditions, we have established know-how in test systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality construction bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality construction bodies ■ Minimal excess soil on site (disposal residual soil volume) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Column] The Appeal of the El Niño Method for Pebbles and Boulders on Solid Bedrock

How to absorb risks that are not visible in preliminary surveys through design, such as point-embedded boulders, rolling stones, and solid bedrock?

Boring surveys are an important means of understanding the ground. However, it is realistically difficult to fully capture the scattered boulders and cobbles, as well as the hard and uneven bedrock, from data points collected at only 3 to 5 locations. When unexpected issues arise on-site after the design has been finalized, it leads to a triple burden of changes in construction methods, extended timelines, and additional costs. This time, we will explain how to approach cobbles, boulders, and solid bedrock from the perspective of incorporating "uncertainty" during the design phase. 1. Why are boulders and cobbles "difficult to see in preliminary surveys"? Boulders and cobbles are typically distributed sporadically in river basins, fan-shaped deposits, and old river channels. 2. The significance of choosing a construction method that "allows for unexpected issues" during the design phase. The resilience to unexpected issues varies greatly depending on the construction method. 3. Solid bedrock can also be "cut and leveled." Alongside cobbles and boulders, the unevenness of the bedrock when reaching the support layer is also difficult to see during the design phase. When encountering hard bedrock with slopes and steps, many construction methods find it challenging to adapt. The Elneed method is designed with the assumption of changes occurring on-site. Being able to absorb this uncertainty regarding cobbles, boulders, and solid bedrock on-site directly contributes to the reliability of the design and the stability of the construction timeline.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Column] Over 3,000 Achievements: Reasons Why the Elneed Method is Chosen

Over 3,000 pieces of data prove the effectiveness of the Elniido method. From RC construction and high-rise projects to challenging job sites, the numbers tell the "reasons for continued selection."

The projects assisted by Elneed Kyushu have surpassed a total of 3,000. We will analyze this vast achievement through "numbers" and introduce why we continue to be chosen by many designers and contractors. ⬛︎ Breakdown of Structural Types - S-structure (Steel Frame): 51.7% - RC structure (Reinforced Concrete): 36.2% - Others (W structure, WRC structure, etc.): Approximately 12% ⬛︎ Distribution of Design Bearing Capacity (Long-term Allowable Bearing Capacity) - Volume Zone: 201–300 kN/m² - Corresponding Range: 50–1,000 kN/m² The reason we have continued to be chosen in this fiercely competitive area, where "ground improvement is considered to be below 300 kN/m²," lies in our high on-site responsiveness. ⬛︎ Responding to Evolving Needs In recent years, there has been a sharp increase in inquiries for high-capacity projects of 400 kN/m² or more. In this area, where general column improvements are difficult to address and ultra-high-strength methods (such as RAPL) tend to lead to over-design, the Elneed method provides optimal solutions. "What construction method is best for building this structure on this ground?" Please feel free to consult with us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
Prev 12 Next
  • Contact this company

    Contact Us Online
  • Before making an inquiry

    Download PDF

Products

  • Search for Products

Company

  • Search for Companies

Special Features

  • Special Features

Ranking

  • Overall Products Ranking
  • Overall Company Ranking

support

  • site map
IPROS
  • privacy policy Regarding external transmission of information
  • terms of service
  • About Us
  • Careers
  • Advertising
COPYRIGHT © 2001-2026 IPROS CORPORATION ALL RIGHTS RESERVED.
Please note that the English text on this page is automatically translated and may contain inaccuracies.