iPROS Urban Planning
  • Search for products by classification category

    • Building Materials
      Building Materials
      36338items
    • Facilities
      Facilities
      56768items
    • Lighting and Interior
      Lighting and Interior
      17441items
    • Common materials
      Common materials
      37245items
    • Civil Engineering Materials
      Civil Engineering Materials
      9864items
    • Construction, work and methods
      Construction, work and methods
      28344items
    • Surveys, Measurements, and Services
      Surveys, Measurements, and Services
      29676items
    • IT/Software
      IT/Software
      36688items
    • others
      others
      79664items
    • Store and facility supplies
      Store and facility supplies
      4519items
    • Office and commercial supplies
      Office and commercial supplies
      11641items
    • Hospital and welfare facility supplies
      Hospital and welfare facility supplies
      983items
    • Logistics Equipment
      Logistics Equipment
      7051items
    • Energy and Resources
      Energy and Resources
      11762items
  • Search for companies by industry

    • Information and Communications
      7321
    • others
      7156
    • Building materials, supplies and fixtures manufacturers
      6585
    • Service Industry
      4688
    • Trading company/Wholesale
      3007
    • Other construction industries
      2433
    • Electrical equipment construction business
      639
    • Interior Design
      520
    • Facility Design Office
      489
    • Construction Consultant
      462
    • retail
      361
    • Architectural design office
      358
    • Warehousing and transport related industries
      324
    • Electricity, Gas and Water Industry
      286
    • General contractors and subcontractors
      280
    • Interior construction business
      277
    • Medical and Welfare
      275
    • Educational and Research Institutions
      256
    • Building Management
      252
    • Renovation and home construction industry
      222
    • Water supply and drainage construction business
      203
    • Housing manufacturers and construction companies
      182
    • Transportation
      159
    • Real Estate Developers
      154
    • Fisheries, Agriculture and Forestry
      126
    • Structural Design Office
      65
    • Finance, securities and insurance
      38
    • Restaurants and accommodations
      30
    • self-employed
      30
    • Mining
      26
    • Public interest/special/independent administrative agency
      20
    • Police, Fire Department, Self-Defense Forces
      17
    • Store and building owners
      9
    • Property Owner
      8
    • Government
      8
    • Individual
      8
  • Special Features
  • Ranking

    • Overall Products Ranking
    • Overall Company Ranking
Search for Products
  • Search for products by classification category

  • Building Materials
  • Facilities
  • Lighting and Interior
  • Common materials
  • Civil Engineering Materials
  • Construction, work and methods
  • Surveys, Measurements, and Services
  • IT/Software
  • others
  • Store and facility supplies
  • Office and commercial supplies
  • Hospital and welfare facility supplies
  • Logistics Equipment
  • Energy and Resources
Search for Companies
  • Search for companies by industry

  • Information and Communications
  • others
  • Building materials, supplies and fixtures manufacturers
  • Service Industry
  • Trading company/Wholesale
  • Other construction industries
  • Electrical equipment construction business
  • Interior Design
  • Facility Design Office
  • Construction Consultant
  • retail
  • Architectural design office
  • Warehousing and transport related industries
  • Electricity, Gas and Water Industry
  • General contractors and subcontractors
  • Interior construction business
  • Medical and Welfare
  • Educational and Research Institutions
  • Building Management
  • Renovation and home construction industry
  • Water supply and drainage construction business
  • Housing manufacturers and construction companies
  • Transportation
  • Real Estate Developers
  • Fisheries, Agriculture and Forestry
  • Structural Design Office
  • Finance, securities and insurance
  • Restaurants and accommodations
  • self-employed
  • Mining
  • Public interest/special/independent administrative agency
  • Police, Fire Department, Self-Defense Forces
  • Store and building owners
  • Property Owner
  • Government
  • Individual
Special Features
Ranking
  • Overall Products Ranking
  • Overall Company Ranking
  • privacy policy
  • terms of service
  • About Us
  • Careers
  • Advertising
  1. Home
  2. Other construction industries
  3. エルニード協会
  4. Product/Service List
Other construction industries
  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration

エルニード協会

addressKagawa/Takamatsu-shi/2485-21 Nishimachi, Wakayama
phone087-841-0161
  • Special site
  • Official site
last updated:Jun 18, 2025
エルニード協会logo
  • Contact this company

    Contact Us Online
  • Before making an inquiry

    Download PDF
  • Company information
  • Products/Services(96)
  • catalog(30)
  • news(0)

エルニード協会 List of Products and Services

  • category

1~45 item / All 73 items

Displayed results

Filter by category

Super Rappu El Nido Method Super Rappu El Nido Method
Ground improvement work Ground improvement work
Shallow and intermediate layer mixed treatment method Shallow and intermediate layer mixed treatment method
Slurry-type mechanical stirring block ground improvement method Slurry-type mechanical stirring block ground improvement method
Super Rappuru Basic Construction Method Super Rappuru Basic Construction Method
Koshinetsu Area (Elneed Koshinetsu Co., Ltd.) Koshinetsu Area (Elneed Koshinetsu Co., Ltd.)
Chubu Japan Area (Elneed Chubu Co., Ltd.) Chubu Japan Area (Elneed Chubu Co., Ltd.)
Kyushu Okinawa Area (Elneed Kyushu Co., Ltd.) Kyushu Okinawa Area (Elneed Kyushu Co., Ltd.)
Chugoku-Shikoku Area (Elneed Chugoku-Shikoku Co., Ltd.) Chugoku-Shikoku Area (Elneed Chugoku-Shikoku Co., Ltd.)
Tohoku Area (Elneed Tohoku Co., Ltd.) Tohoku Area (Elneed Tohoku Co., Ltd.)
Hokkaido, Kanto region, Kansai region area (Neo Need Co., Ltd.) Hokkaido, Kanto region, Kansai region area (Neo Need Co., Ltd.)
Ground

Ground improvement work

The Super Rappu L Elneed method is a construction technique that uses stabilized soil created by mixing construction-generated soil with water and cement-based solidifying agents, further improving the Rappu concrete method for construction foundations.

Ground improvement work in Aichi Prefecture! Super Rappu Elneed method.

[NETIS Registration] Achieving low costs! Utilizing the advantages of construction methods to create high-quality earthworks with consideration for the environment.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Erunido Method." Since it is constructed by direct excavation, it reduces the processes of excess excavation, setting up, and removing formwork. Construction can be completed in a short time from excavation to site development for each location. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling the creation of high-quality development bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality development bodies ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Achieving low-cost construction! Rappuru concrete foundation ground improvement work.

[NETIS Registration] It is active in a wide range of applications as a fundamental construction method that responds to various situations!

We would like to introduce the feature of the "Super Rappuru Erunido Method," which makes it easy to confirm the supporting layer. By excavating down to the supporting ground, visual confirmation and tactile examination through the removal of the supporting ground are possible, allowing for direct judgment and increasing reliability. Additionally, by using different equipment according to the soil type, it has become possible to achieve high-quality and uniform construction. 【Features】 ■ Excellent cost-effectiveness ■ Shortened construction period and high-quality fill ■ Minimal excess soil on site (remaining disposal soil volume) ■ Agile response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Achieving both a reduction in construction days and cost savings! Ground improvement work using the Rapple foundation method.

[NETIS Registration] Achieving low costs! Utilizing the advantages of construction methods to create high-quality land development that considers the environment.

We would like to introduce the excellent economic efficiency of the "Super Lapple Elneed Method." Since it is constructed using direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site preparation at each location. Through numerous trial constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality site preparations with minimal variation in strength. 【Features】 ■ Easy confirmation of the support layer ■ Shortened construction period and high-quality site preparation ■ Minimal excess soil on site (remaining disposal soil volume) ■ Agile response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[NETIS Registration] Ground Improvement Work Super Rappu Elniido Method

Supporting the form of the earth with reliable technology! Appropriate and safe design tailored to the application.

We would like to introduce the features of the "Super Rappuru Elniido Method," which include shortened construction periods and high-quality embankments. By using different buckets according to soil type for mixing, it enables the creation of high-quality improved materials and also enhances efficiency. Additionally, the time from excavation to completion of the embankment is short, and in most cases, direct excavation is possible, eliminating the need for excess excavation and the setting and removal of formwork. 【Features】 ■ Excellent cost-effectiveness ■ Easy confirmation of support layers ■ Minimal excess soil on site (remaining disposal soil volume) ■ Quick response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

A must-see for structural design offices! Super Rappuru Elniido method.

【NETIS Registration】High-quality construction materials that consider the environment! Using attachments compatible with various soil types.

We would like to introduce the feature of the "Super Rappuru Erunido Method," which is characterized by the minimal amount of surplus soil generated on site. Since this method involves mixing site-generated soil with solidifying agents, it produces less residual soil compared to conventional methods, making disposal easier. Additionally, by excavating down to the supporting ground, visual confirmation and tactile inspection through the removal of the supporting ground are possible, allowing for direct assessment and increasing reliability. 【Features】 ■ Excellent cost-effectiveness ■ Easy confirmation of the supporting layer ■ Shortened construction period and high-quality embankment ■ Agile response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Hyogo Prefecture! Super Rappu Elneed method.

[NETIS Registration] Supporting the form of the earth with reliable technology! Appropriate and safe design tailored to the application.

We would like to introduce the features of the "Super Rappuru Elniido Method," which include a shortened construction period and high-quality improvement bodies. By using different buckets according to the soil type for mixing, it enables the creation of high-quality improved bodies and also improves efficiency. Additionally, the time from excavation to completion of the improvement is short, and in most cases, direct excavation is possible, eliminating the need for excess excavation and the setting and removal of formwork. [Features] ■ Excellent cost-effectiveness ■ Easy confirmation of support layers ■ Minimal excess soil on site (amount of disposal soil) ■ Quick response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Rubble Concrete Super Rubble Elneed Method

[NETIS Registration] It is active in a wide range of applications as a fundamental construction method that responds to various situations!

We would like to introduce the feature of the "Super Rappuru Erunido Method," which makes it easy to confirm the supporting layer. By excavating down to the bearing ground, visual confirmation and tactile examination through the removal of the bearing ground can be performed, allowing for direct judgment and increasing reliability. Additionally, by using different devices according to the soil type, high-quality and uniform construction has become possible. 【Features】 ■ Excellent cost-effectiveness ■ Shortened construction period and high-quality fill ■ Minimal excess soil on site (amount of disposal soil) ■ Quick response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Environmentally friendly super rubble elnid construction method using fluidized treatment soil.

[NETIS Registration] Achieving low costs! Utilizing the advantages of construction methods to create high-quality, environmentally friendly development bodies.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Erunido Method." Since it is constructed using direct excavation, it reduces the processes of excess excavation, setting up, and removing formwork. The construction can be completed in a short time from excavation to site development for each location. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality development bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality development bodies ■ Minimal excess soil on site (remaining disposal soil amount) ■ Quick response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Super Rappu Elniido Method - Shortening Construction Period! Ground Improvement Work

[NETIS Registration] Supporting the form of the earth with reliable technology! Appropriate and safe design tailored to the application.

We would like to introduce the features of the "Super Rappuru Erunido Method," which include shortened construction periods and high-quality embankments. By using different buckets according to soil types for mixing, it enables the creation of high-quality improved materials and also enhances efficiency. Additionally, the time from excavation to completion of embankment is short, and in most cases, direct excavation is possible, eliminating the need for excess excavation and the setting and removal of formwork. 【Features】 ■ Excellent cost-effectiveness ■ Easy confirmation of support layers ■ Minimal excess soil on site (remaining disposal soil volume) ■ Quick response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Slurry-type mechanical stirring block ground improvement method - El Nido method

[NETIS Registration] Supporting the form of the earth with reliable technology! Appropriate and safe design tailored to the application.

We would like to introduce the features of the "Super Rappuru Erunido Method," which include shortened construction periods and high-quality embankments. By using different buckets according to the soil type for mixing, it enables the creation of high-quality improved materials and also enhances efficiency. Additionally, the time from excavation to completion of the embankment is short, and in most cases, direct excavation is possible, eliminating the need for excess excavation and the setting and removal of formwork. 【Features】 ■ Excellent cost-effectiveness ■ Easy confirmation of support layers ■ Minimal excess soil on site (remaining disposal soil volume) ■ Agile response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[NETIS Registration] Basic Construction Method: Super Lapel Elneed Method

High-quality construction materials that consider the environment! Using attachments compatible with various soil types.

We would like to introduce the feature of the "Super Rappuru Elniido Method," which is that it generates minimal excess soil on site. Since this method involves mixing site-generated soil with solidifying agents, it produces less residual soil compared to conventional methods, making disposal easier. Additionally, by excavating down to the supporting ground, visual confirmation and tactile inspection through the removal of the supporting ground are possible, allowing for direct judgment and thereby increasing reliability. [Features] ■ Excellent cost-effectiveness ■ Easy confirmation of the supporting layer ■ Shortened construction period and high-quality embankment ■ Agile response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Shallow and Intermediate Layer Mixed Treatment Method - Super Rappelle Erneed Method

[NETIS Registration] Achieving low costs! Utilizing the advantages of construction methods to create high-quality land development with consideration for the environment.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Erunido Method." Since it is constructed through direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site development for each location. Through numerous trial constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality development bodies with minimal strength variation. 【Features】 ■ Easy confirmation of the supporting layer ■ Shortened construction period and high-quality development body ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[NETIS Registration] Super Wrap L Elneed Method

Foundation construction method using fluidized treatment soil! Joint research and development with the National Institute for Land and Infrastructure Management.

The "Super Rappuru Erunido Method" is a construction method that realizes "simplicity, clarity, and reliability." Considering soil quality, high quality, and uniformity, various buckets such as cut & mixing buckets, M mixing buckets, and skeleton mixing buckets are used appropriately during construction. Additionally, to achieve high quality, we thoroughly manage quality by addressing changes in soil quality during construction, changes in groundwater levels, and ensuring reliable confirmation of the supporting ground. 【Features】 ■ Minimal leftover soil ■ Easy confirmation of the supporting layer ■ Strength management can be performed as needed ■ Quick response to changes in natural soil moisture content ■ No compaction required ■ Increased adhesion prevents liquefaction *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

<Capable of responding swiftly to various sites> Super Rappuru Erunido Method

[NETIS Registration] Capable of responding to various situations and active in a wide range of applications! A technology that allows for direct confirmation of the quality of the fill material and the supporting ground.

We would like to introduce the "Super Lapple Elneed Method," which can respond swiftly to various job sites. This method allows for excavation and improvement even in ground containing cobbles and boulders, and it enables water volume adjustments according to site conditions in response to changes in soil moisture content and unexpected groundwater. By incorporating an adjusted moisture content into the mix design, the uniformity of the constructed body is enhanced. Please feel free to contact us when you need our services. 【Features】 ■ Excellent cost-effectiveness ■ Easy confirmation of support layers ■ Shortened construction period and high-quality constructed body ■ Minimal excess soil on site *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Nara Prefecture! Super Rappu Elniido method.

[NETIS Registration] Achieving low costs! Utilizing the advantages of construction methods to create high-quality, environmentally friendly development bodies.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Method." Since it is constructed using direct excavation, it reduces the processes of excess excavation, as well as the setting up and removal of formwork. Construction can be completed in a short time from excavation to site development for each location. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality development bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality development bodies ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Shiga Prefecture! Super Rappu Elneed method.

[NETIS Registration] Achieving low costs! Utilizing the advantages of construction methods to create high-quality earthworks with consideration for the environment.

We would like to introduce the excellent economic efficiency of the "Super Lapple Erneed Method." Since it is constructed through direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site preparation for each location. Through numerous trial constructions in various ground conditions, we have established know-how in testing systems, mixing plans, construction management, and the development of mixing buckets, enabling us to create high-quality site preparations with minimal variation in strength. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality site preparations ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in the Kansai region! Super Rappu Elniido method.

[NETIS Registration] Supporting the form of the earth with reliable technology! Appropriate and safe design tailored to the application.

We would like to introduce the features of the "Super Rappuru Erunido Method," which include a shortened construction period and high-quality embankments. By using different buckets according to the soil type for mixing, it enables the creation of high-quality improved soil and also improves efficiency. Additionally, the time from excavation to completion of the embankment is short, and in most cases, direct excavation is possible, eliminating the need for excess excavation and the setting and removal of formwork. 【Features】 ■ Excellent cost-effectiveness ■ Easy confirmation of the support layer ■ Minimal excess soil on site (amount of disposal soil) ■ Quick response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Nagano Prefecture! Super Rappu Elniido method.

[NETIS Registration] Achieving low costs! Utilizing the advantages of construction methods to create high-quality earthworks with consideration for the environment.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Erunido Method." Since it is constructed using direct excavation, it reduces the processes of excess excavation, as well as the setting up and removal of formwork. Construction can be completed in a short time from excavation to site preparation for each location. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix design, construction management, and the development of mixing buckets, enabling us to create high-quality site preparations with minimal variation in strength. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality site preparation ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Toyama Prefecture! Super Rappu Elniido method.

[NETIS Registration] Achieving low costs! Utilizing the advantages of construction methods to create high-quality landforms with consideration for the environment.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Erunido Method." Since it is constructed by direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site development for each location. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality development bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality development bodies ■ Minimal excess soil on site (amount of disposal soil) ■ Quick response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Fukui Prefecture! Super Rappu Elniido method.

[NETIS Registration] Achieving low costs! Utilizing the advantages of construction methods to create high-quality, environmentally friendly land development.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Erunido Method." Since it is constructed using direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site preparation for each location. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality site preparations with minimal variation in strength. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality site preparation ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in the Tokai region! Super Rappu Elniido method.

[NETIS Registration] Supporting the form of the earth with reliable technology! Appropriate and safe design tailored to the application.

We would like to introduce the features of the "Super Rappuru Elniido Method," which include shortened construction periods and high-quality embankments. By using different buckets according to soil types for mixing, it enables the creation of high-quality improved soil and also enhances efficiency. Additionally, the time from excavation to completion of embankment is short, and in most cases, direct excavation is possible, eliminating the need for excess excavation and the setting and removal of formwork. 【Features】 ■ Excellent cost-effectiveness ■ Easy verification of support layers ■ Minimal excess soil on site (amount of disposal soil) ■ Quick response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Super Rappu El Nido Method

Over 3,000 construction achievements nationwide! Ground improvement that realizes shortened construction periods and cost reduction.

We would like to introduce the excellent economic efficiency of the "Super Lapple Elneed Method." Since it is constructed through direct excavation, it reduces the processes of over-excavation and the setting and removal of formwork. The construction can be completed in a short time from excavation to site development for each location, achieving cost reduction. By conducting preliminary test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality development bodies with minimal variation in strength. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality development bodies ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[NETIS Registration] For sites concerned about groundwater and soft ground. Reliable construction methods.

A clear move that can be judged visually at sites with abundant groundwater and soft ground!

The "Super Rappuru Erunido Method" allows for visual and tactile confirmation of the support layer during construction, enabling accurate decision-making even in sites where construction judgments may be uncertain. It supports reliable on-site judgments without relying on estimates or experience as in the past. This leads to a reduction in construction time and stabilization of quality, while minimizing the risk of construction errors. It can also accommodate complex ground conditions, significantly reducing uncertainties on site. 【Features】 ■ Reliable confirmation of the support layer during construction ■ Completion of construction in a short period at low cost ■ Achievement of high-quality embankments ■ Flexible construction tailored to the site environment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【NETIS Registration】 "Defect Rate 0%" High-density ground improvement for reliable prevention of settlement

"0% defect rate" Reliable ground improvement with high density to prevent sinking.

In response to the risk of re-softening after ground improvement, the "Super Rappu El Nido Method" ensures the stability of high-quality fill. Utilizing years of testing and construction know-how, we achieve construction quality with minimal strength variation. It can be confidently implemented not only immediately after improvement but also in projects requiring long-term ground stability. 【Features】 ■ Construction of high-strength fill ■ Improved stability after improvement ■ Zero risk of settlement after construction ■ High-precision construction management

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[NETIS Registration] Resolving the gap between indoor mixing tests and field conditions! Construction with stable strength.

Don't just end with calculations on paper. A construction system that stabilizes the strength on site.

The "Super Rappuru Erunido Method" addresses the issue of strength discrepancies between indoor mixing tests and actual site construction. By implementing mix adjustments and a quality control system tailored to the site, it achieves stability in strength. Even in a rapidly changing construction environment, it provides high-quality construction with high reproducibility. 【Features】 ■ Guaranteed strength stability ■ Eliminates discrepancies between indoor tests and site conditions ■ High-precision construction system ■ Quality assurance after construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Kagawa Prefecture! Super Rappu Elneed method.

[NETIS Registration] Achieving cost-effective ground improvement that can accommodate groundwater, weak ground, and narrow sites.

We are implementing ground improvement work that excels in the balance of quality and cost by utilizing the Super Rappu Elniido method, which accommodates various architectural uses such as medical facilities and factories within Kagawa Prefecture. This method allows for a reduction in processes such as excess excavation and the installation and removal of formwork through direct excavation construction, enabling the completion of work at each location in a short time. This achieves both a reduction in construction period and cost. Additionally, based on our track record of conducting numerous preliminary test constructions on various grounds, we have accumulated know-how in mix design, construction management, and the development of mixing buckets. A key feature of this method is its ability to construct high-quality fill with minimal strength variation. We flexibly respond to design requirements such as design bearing capacity, improvement depth, and construction volume, ensuring long-term structural stability and economic efficiency. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality fill ■ Minimal site surplus soil (disposal residual amount) ■ Agile response to various sites

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Ehime Prefecture! Super Rappu Elneed method.

[NETIS Registration] Adopted in various sites such as shipbuilding factories, hospitals, and fishing port facilities.

In Ehime Prefecture, the Super Rappuru Elniido method is widely adopted, ranging from large-scale factory facilities to medical and fisheries-related facilities. It ensures high design strength even on soft ground and can accommodate deep improvements. Additionally, this method reduces the amount of leftover soil after construction by utilizing the excavated soil generated on-site, contributing to a reduction in environmental impact and waste disposal costs. Thus, it is being increasingly adopted throughout the prefecture as a ground improvement method that achieves both construction quality and environmental consideration.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Kochi Prefecture! Super Rappu Elneed method.

[NETIS Registration] Supports large-scale renovations of educational facilities! Short construction period and high-strength ground improvement.

In Kochi Prefecture, support is provided for stable foundation construction through ground improvement using the Super Rappu Elneed method, primarily focusing on school facilities. This method is highly regarded for balancing safety and cost performance while ensuring the necessary construction volume according to structural scale, and it can flexibly adapt to limited site conditions. Since this method involves direct excavation, it reduces processes such as excess digging and the installation and removal of formwork, thereby shortening the construction time per location. As a result, it enables a reduction in construction period and costs. Furthermore, leveraging the knowledge gained from preliminary test constructions conducted nationwide, high-quality embankments with minimal strength variation are achieved through the establishment of testing systems, mix design, construction management, and the development of mixing buckets.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Tokushima Prefecture! Super Rappu Elniido method.

[NETIS Registration] Contributing to the foundation of safety and security in nursing care facilities and similar establishments.

In Tokushima Prefecture, the Super Rappu Elniido method has been adopted for the reconstruction of welfare facilities. It ensures reliable bearing capacity even in soft ground at medium to deep layers, contributing to the reduction of ground subsidence risk. This method allows for visual and tactile confirmation of the support layer during construction, which enhances the certainty of reaching the support layer and enables stable expression of the designed bearing capacity. Furthermore, by uniformly mixing improved soil within the excavation hole and incorporating an adjusted moisture content ratio into the mixing plan, it is possible to create high-quality improved bodies with minimal variation. Additionally, even during sudden rain or groundwater inflow, water volume management based on flow values maintains quality stability. Due to these features, it is utilized as an effective ground improvement method for foundation work in welfare facilities, where both economic efficiency and construction quality are required. For detailed achievements, please see below.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Hiroshima Prefecture! Super Rappu Elniido method.

[NETIS Registration] Responding to a wide range of projects from high-rise condominiums to medical facilities.

In Hiroshima Prefecture, the Super Rappuru Erunido method has been widely adopted in construction projects by medical corporations and major general contractors. It can accommodate deep structural foundations and achieves an improved body with excellent construction precision and structural stability. It is utilized as a highly reliable ground improvement method in sites where safety and quality are required. This method involves direct excavation, which reduces processes such as excess digging and the installation and removal of formwork, thereby shortening the construction time per location. It simultaneously achieves a reduction in construction period and costs. Additionally, leveraging the achievements of preliminary test constructions conducted nationwide, we have established know-how in testing systems, mix planning, construction management, and mixing bucket development. This enables the construction of high-quality embankments with minimal strength variation. Due to these features, it is highly regarded in foundation work for medical and commercial facilities, where both economic efficiency and construction quality are required. For detailed achievements, please see below.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Hokkaido! Super Rappu Elneed method.

[NETIS Registration] Achieving shortened construction periods and low costs! Super Lapel Elneed method capable of handling groundwater and weak ground.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed through direct excavation, it reduces the processes of excess excavation, as well as the setting up and removal of formwork. Construction can be completed in a short time from excavation to site preparation for each location. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality site preparations with minimal variation in strength. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality site preparations ■ Minimal excess soil on site (disposal soil volume) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Kanagawa Prefecture! Super Rappu El Nido method.

[NETIS Registration] Achieving shortened construction periods and reduced costs! Super Lapel Elneed method capable of handling groundwater and weak ground.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Construction Method." Since it is constructed through direct excavation, it reduces the processes of over-excavation and the setting and removal of formwork. It allows for quick completion from excavation to site development at each location. Through numerous trial constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality development bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality development bodies ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Saitama Prefecture! Super Rappu Elniido method.

[NETIS Registration] Achieving shortened construction periods and reduced costs! Super Lapel Elneed method that can also accommodate groundwater and weak ground.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Erunido construction method." Since it is constructed using direct excavation, it reduces the processes of over-excavation and the setting and removal of formwork. It allows for quick completion from excavation to site preparation at each location. Through numerous test constructions in various ground conditions, we have established know-how in test systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality site preparations with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality site preparation ■ Minimal excess soil on site (remaining disposal soil volume) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Chiba Prefecture! Super Rappu Elniido method.

[NETIS Registration] Achieving shortened construction periods and reduced costs! Super Lapel Elneed method capable of handling groundwater and weak ground.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Method." Since it is constructed by direct excavation, it reduces the processes of over-excavation, setting up, and removing formwork. It allows for quick construction from excavation to completion at each site. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix design, construction management, and the development of mixing buckets, enabling us to create high-quality construction bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality construction bodies ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Tokyo! Super Rappu Elniido method.

[NETIS Registration] Achieving shortened construction periods and reduced costs! Super Lapel Elneed method capable of handling groundwater and weak ground.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Erunido Construction Method." Since it is constructed by direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. It allows for quick construction from excavation to completion at each site. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling the creation of high-quality construction bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality construction bodies ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Aomori Prefecture! Super Rappu Elniido method.

[NETIS Registration] Construction of sediment control dams approved!

We carried out ground improvement for a sediment control dam in public civil engineering using the Super Rappu Elniido method. Excavation and improvement were performed down to the bedrock of the supporting layer, and sloped cross-section shaping was also conducted. In mountainous sites, construction conditions are limited, such as the selection of construction machinery and materials. However, the Super Rappu Elniido method can be implemented with basically a general-purpose backhoe and a small amount of materials, making it possible to work in narrow areas. We also introduce various case studies on pages from other prefectures.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Iwate Prefecture! Super Ruple Elneed method.

[NETIS Registration] Construction OK even in gravel layers!

There are cases where layers composed of gravel are improved. The Super Rappu El Nido method uses a general-purpose backhoe for construction, allowing excavation even in solid ground that is difficult to dig, such as gravel layers mixed with cobbles. Additionally, in the case of gravel layers where the excavation hole cannot stand on its own, there is a concern about the collapse of the excavation hole. However, by changing the excavation method, the risk of collapse can be reduced. We also introduce various examples on pages from other prefectures.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Miyagi Prefecture! Super Rappu Elniido method.

[NETIS Registration] Construction is OK even under the cut beam!

In construction sites in urban areas, there are cases where construction is carried out for buildings such as apartments and hotels with a shallow foundation, and where the bottom of the foundation is deep. In such situations, support and deformation prevention beams are placed for temporary support after the initial excavation. The Super Rappu Elniido method can be executed using a general-purpose backhoe, allowing for construction even when support beams are present by adjusting the placement and height of the beams. Various examples are also introduced on pages from other prefectures.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Fukushima Prefecture! Super Ruple Elneed method.

[NETIS Registration] Construction is OK even with a large amount of groundwater flow!

In cases where the groundwater level in the ground is high, the excavation hole may soon be filled with groundwater after the excavation begins. The Super Rappu Elneed method changes the excavation technique according to the groundwater inflow situation, thereby preventing excessive water inflow and reducing the risk of collapse of the excavation hole. Additionally, the water management method of the Elneed method involves measuring flow values using the cylinder method to manage the water volume. This management method allows for appropriate responses to changes in the moisture content of the soil used for improvement and the inflow of groundwater. We also introduce various case studies on pages from other prefectures.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Yamagata Prefecture! Super Ruple Elneed method.

[NETIS Registration] Construction is OK even when the water level is high!

In cases where the groundwater level in the ground is high, the excavation hole may soon be filled with groundwater after the excavation begins. The Super Rappu Elneed method reduces the risk of excessive water inflow and the collapse of the excavation hole by changing the excavation technique according to the groundwater inflow conditions. Additionally, the water management method of the Elneed technique involves measuring the flow rate using the cylinder method to manage the water volume. This management method allows for appropriate responses to changes in the moisture content of the soil used for improvement and the inflow of groundwater. We also introduce various examples on pages from other prefectures.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Akita Prefecture! Super Rappu Elniido method.

[NETIS Registration] Suitable even for gravel layers!

There are cases where layers composed of gravel are improved. The Super Rappu El Nido method uses a general-purpose backhoe for construction, allowing excavation even in solid ground that is difficult to dig, such as gravel layers mixed with cobbles. Additionally, in the case of gravel layers where the excavation hole does not stand on its own, there is a concern about the collapse of the excavation hole, but by changing the excavation method, the risk of collapse can be reduced. We also introduce various examples on pages from other prefectures.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Tottori Prefecture! Super Rappu El Nido method.

[NETIS Registration] Achieving low costs! Utilizing the advantages of construction methods to create high-quality, environmentally friendly development bodies.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Erunido construction method." Since it is constructed by direct excavation, it reduces the processes of excess excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site preparation for each location. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality site preparations with minimal variation in strength. 【Features】 ■ Easy confirmation of the support layer ■ Shortened construction period and high-quality site preparation ■ Minimal excess soil on site (remaining disposal soil volume) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Shimane Prefecture! Super Rappu Elniido method.

[NETIS Registration] Achieving low costs! Utilizing the advantages of construction methods to create high-quality development bodies with consideration for the environment.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Erunido Method." Since it is constructed using direct excavation, it reduces the processes of over-excavation and the setting and removal of formwork. Construction can be completed in a short time from excavation to site preparation for each location. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix design, construction management, and the development of mixing buckets, enabling us to create high-quality site preparations with minimal variation in strength. 【Features】 ■ Easy confirmation of the supporting layer ■ Shortened construction period and high-quality site preparation ■ Minimal excess soil on site (disposal residual soil volume) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in Okayama Prefecture! Super Ruple Elneed method.

[NETIS Registration] Achieving low costs! Utilizing the advantages of construction methods to create high-quality development bodies with consideration for the environment.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Erunido Construction Method." Since it is constructed by direct excavation, it reduces the processes of excess excavation, as well as the setting up and removal of formwork. Construction can be completed in a short time from excavation to site preparation for each location. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality site preparations with minimal variation in strength. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality site preparations ■ Minimal excess soil on site (remaining disposal soil volume) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work in the Kanto region! Super Rappu Elniido method.

[NETIS Registration] Achieving shorter construction periods and lower costs! Super Lapel Elneed method that can also accommodate groundwater and weak ground.

We would like to introduce the excellent economic efficiency of the "Super Rappuru Elniido Method." Since it is constructed by direct excavation, it reduces the processes of excess excavation, setting up, and removing formwork. It allows for quick construction from excavation to completion at each site. Through numerous test constructions in various ground conditions, we have established know-how in testing systems, mix planning, construction management, and the development of mixing buckets, enabling us to create high-quality construction bodies with minimal strength variation. 【Features】 ■ Easy confirmation of support layers ■ Shortened construction period and high-quality construction bodies ■ Minimal excess soil on site (amount of disposal soil) ■ Agile response to various sites ■ Capable of handling sudden rain and groundwater *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
Prev 12 Next
  • なぜあの現場で事故は起きたのか? 最新 事故事例セミナー 無料 4.10(金)-5.15(金) 期間中いつでも視聴可能 年間200箇所の工場を巡回する安全のプロが解説!
    • Contact this company

      Contact Us Online
    • Before making an inquiry

      Download PDF

    Products

    • Search for Products

    Company

    • Search for Companies

    Special Features

    • Special Features

    Ranking

    • Overall Products Ranking
    • Overall Company Ranking

    support

    • site map
    IPROS
    • privacy policy Regarding external transmission of information
    • terms of service
    • About Us
    • Careers
    • Advertising
    COPYRIGHT © 2001-2026 IPROS CORPORATION ALL RIGHTS RESERVED.
    Please note that the English text on this page is automatically translated and may contain inaccuracies.