1~3 item / All 3 items
Displayed results
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationContact this company
Contact Us Online1~3 item / All 3 items
The "Double Sheet System" is a backfill-first steel formwork. It allows for the simultaneous construction of the base formwork and the retaining formwork, eliminating the need for formwork dismantling and significantly contributing to shortening construction time. Since processing is done in the factory, it offers excellent construction accuracy and smooth on-site execution. Additionally, by setting the steel formwork while excavating and immediately backfilling, there is no need for extra excavation at the base bottom and the underground beam bottom, thus eliminating the need for beam bottom formwork. 【Features】 ■ Shortened construction period ■ Reduced soil volume ■ Cost reduction ■ CO2 reduction *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe "New Separator Angle" eliminates separator welding, allowing for construction on-site to be done in half the time without the need for separator welding. This eliminates the need for sequential work, shortening construction periods and reducing labor costs. Since separator welding is not required, there is no waste or inconsistency in quality. Additionally, it has become compatible with three-part separators. We also sell separator hardware only. Please feel free to contact us. 【Sizes】 ■ Compatible Angle: L5×40×40, Screw Hole Size: 5/16 ■ Compatible Angle: L6×50×50, Screw Hole Size: 5/16, 3/8 *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe "Pile Spacer" is a construction material used to remove soil from the top of piles. The optional extension hanging rod can be connected to this product during the cutoff method, allowing for significant cost reduction. Additionally, the bolt-type connector secures this product using the tapped holes on the pile head, making it easy to install without the need for a welder. Please feel free to contact us if you have any inquiries. 【Dimension Lineup】 ■ Standard: PS300 Outer Diameter: φ155mm ■ Standard: PS350 Outer Diameter: φ195mm ■ Standard: PS400 Outer Diameter: φ240mm ■ Standard: PS450 Outer Diameter: φ270mm ■ Standard: PS500 Outer Diameter: φ325mm ■ Standard: PS600 Outer Diameter: φ375mm, etc. *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration