Excavation and backfill volumes have significantly decreased. The amount of soil transported to the disposal site will also decrease.
The "Double Sheet System" is a backfill-first steel formwork. It allows for the simultaneous construction of the base formwork and the retaining formwork, eliminating the need for formwork dismantling and significantly contributing to shortening construction time. Since processing is done in the factory, it offers excellent construction accuracy and smooth on-site execution. Additionally, by setting the steel formwork while excavating and immediately backfilling, there is no need for extra excavation at the base bottom and the underground beam bottom, thus eliminating the need for beam bottom formwork. 【Features】 ■ Shortened construction period ■ Reduced soil volume ■ Cost reduction ■ CO2 reduction *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company handles products such as the double sheet system (steel formwork), NEW separator angles, and pile spacers. We also offer a full range of miscellaneous ironwork, anchor sets, rebar frames, pile baskets, and pile head reinforcement welding. Please feel free to contact us if you have any inquiries.