iPROS Urban Planning
  • Search for products by classification category

    • Building Materials
      Building Materials
      36703items
    • Facilities
      Facilities
      57491items
    • Lighting and Interior
      Lighting and Interior
      17484items
    • Common materials
      Common materials
      37167items
    • Civil Engineering Materials
      Civil Engineering Materials
      10046items
    • Construction, work and methods
      Construction, work and methods
      28697items
    • Surveys, Measurements, and Services
      Surveys, Measurements, and Services
      29725items
    • IT/Software
      IT/Software
      33267items
    • others
      others
      81065items
    • Store and facility supplies
      Store and facility supplies
      4581items
    • Office and commercial supplies
      Office and commercial supplies
      11685items
    • Hospital and welfare facility supplies
      Hospital and welfare facility supplies
      1025items
    • Logistics Equipment
      Logistics Equipment
      7300items
    • Energy and Resources
      Energy and Resources
      12089items
  • Search for companies by industry

    • Information and Communications
      7309
    • others
      7204
    • Building materials, supplies and fixtures manufacturers
      6581
    • Service Industry
      4708
    • Trading company/Wholesale
      3030
    • Other construction industries
      2428
    • Electrical equipment construction business
      660
    • Interior Design
      520
    • Construction Consultant
      502
    • Facility Design Office
      491
    • retail
      361
    • Architectural design office
      357
    • General contractors and subcontractors
      343
    • Warehousing and transport related industries
      324
    • Electricity, Gas and Water Industry
      287
    • Interior construction business
      279
    • Medical and Welfare
      275
    • Building Management
      264
    • Educational and Research Institutions
      253
    • Renovation and home construction industry
      221
    • Housing manufacturers and construction companies
      211
    • Water supply and drainage construction business
      202
    • Transportation
      166
    • Real Estate Developers
      158
    • Fisheries, Agriculture and Forestry
      128
    • Structural Design Office
      65
    • Finance, securities and insurance
      41
    • self-employed
      31
    • Restaurants and accommodations
      30
    • Mining
      26
    • Public interest/special/independent administrative agency
      20
    • Police, Fire Department, Self-Defense Forces
      17
    • Store and building owners
      9
    • Government
      9
    • Individual
      9
    • Property Owner
      8
  • Special Features
  • Ranking

    • Overall Products Ranking
    • Overall Company Ranking
Search for Products
  • Search for products by classification category

  • Building Materials
  • Facilities
  • Lighting and Interior
  • Common materials
  • Civil Engineering Materials
  • Construction, work and methods
  • Surveys, Measurements, and Services
  • IT/Software
  • others
  • Store and facility supplies
  • Office and commercial supplies
  • Hospital and welfare facility supplies
  • Logistics Equipment
  • Energy and Resources
Search for Companies
  • Search for companies by industry

  • Information and Communications
  • others
  • Building materials, supplies and fixtures manufacturers
  • Service Industry
  • Trading company/Wholesale
  • Other construction industries
  • Electrical equipment construction business
  • Interior Design
  • Construction Consultant
  • Facility Design Office
  • retail
  • Architectural design office
  • General contractors and subcontractors
  • Warehousing and transport related industries
  • Electricity, Gas and Water Industry
  • Interior construction business
  • Medical and Welfare
  • Building Management
  • Educational and Research Institutions
  • Renovation and home construction industry
  • Housing manufacturers and construction companies
  • Water supply and drainage construction business
  • Transportation
  • Real Estate Developers
  • Fisheries, Agriculture and Forestry
  • Structural Design Office
  • Finance, securities and insurance
  • self-employed
  • Restaurants and accommodations
  • Mining
  • Public interest/special/independent administrative agency
  • Police, Fire Department, Self-Defense Forces
  • Store and building owners
  • Government
  • Individual
  • Property Owner
Special Features
Ranking
  • Overall Products Ranking
  • Overall Company Ranking
  • privacy policy
  • terms of service
  • About Us
  • Careers
  • Advertising
  1. Home
  2. Other construction industries
  3. ゴープラス
  4. Product/Service List
Other construction industries
  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration

ゴープラス

addressYamanashi/Kofu-shi/1023-9 Uemachi
phone055-241-5127
  • Official site
last updated:Oct 19, 2022
ゴープラスlogo
  • Contact this company

    Contact Us Online
  • Company information
  • Products/Services(5)
  • catalog(1)
  • news(0)

ゴープラス List of Products and Services

  • category

1~5 item / All 5 items

Displayed results

class="retina-image"

Low-profile casing conveyance down-the-hole hammer method LH-CDH

Low-altitude, under-bridge, under-railroad, under-road bridge, and under-power-line casing conveyance type down-the-hole hammer method!

We would like to introduce our "Low-Headroom Casing Continuous Down-the-Hole Hammer Method LH-CDH Method." By using a special bit and continuously installing protective steel pipes for the borehole walls, we can reliably excavate to the designed height even in collapsed layers with high groundwater levels. After excavation, the steel pipes are left in place, allowing for the extraction of the hammer bit, which ensures that core material installation and solidification with mortar can be carried out effectively. Please feel free to consult us when you need our services. 【Construction Examples (Partial)】 ■ LH-CDH Method - Height restriction: 4.55m (under highway bridge) - Steel material: H300 L=11.5m continuous pile construction - Construction machinery: RX2300 low-headroom construction machine HGS60 *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Low-altitude head-down-the-hole hammer method LH-DH method

Down-the-hole hammer method under low ceilings, under bridges for railways and roads, and under power lines!

We would like to introduce our "Low-Headroom Down-the-Hole Hammer Method LH-DH Method." Using a driving device to rotate the down-the-hole hammer and bit, the piston inside the hammer cylinder is moved back and forth by air supplied from a high-pressure compressor. This movement causes the bit tip to strike and break stones and rock formations, while the excavated soil is removed using a screw and air lift method. To prevent wear and seizure inside the cylinder due to piston movement, it is necessary to spray oil into the air using a line oiler. 【Construction Examples (Partial)】 ■ LH-DH Method ・Height restriction: 4.55m (under special high-voltage lines) ・Steel material: H250 L=7.5 to 9.5m joint pile construction ・Construction machinery: RX2300 low-headroom construction machine, special auger for low headroom AGD7000 *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Low-altitude double-R construction method LH-RR method

By using a low-head type pile driver and a low-head type special auger in this construction method, it is possible to perform construction with a low head!

The "Low Headroom Double R Method LH-RR Method" enables construction in high N-value layers such as soft rock and gravel with low vibration and low noise using small foundation machinery. Traditionally, ground that required large foundation machinery can now be constructed using a leaderless pile driving machine weighing between 20t and 40t, equipped with a high torque auger ranging from 70.7 to 98kNm, utilizing main body pressure input and a special auger head for hard ground. Additionally, the removal of obstacles and crushing methods underground can also be performed by changing attachments. 【Low Headroom Special Auger Performance (Partial)】 ■ Auger Type: AGD7000 ■ Weight (kg): 1,720 ■ Operating Pressure/Flow Rate: 27.4Mpa・220l/min ■ Base Machine Used: Hitachi Construction Machinery RX2300・SRX2700・RX3300 Low Headroom Dedicated Machines *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Low-altitude hard ground pile driving method LH method

Low-altitude, under beams, pile driving method under railway and road bridges, and under power lines!

We would like to introduce the "Low-Head Type Rigid Ground Pile Driving Method LH Method" proposed by Go Plus Co., Ltd. This method is particularly suitable for construction on rigid ground under height restrictions (H = 4.0 to 8.0). It demonstrates its effectiveness in many challenging sites, such as "installing steel sheet piles in the rock and boulder layer under a bridge pier foundation at a height of 5.0m" and "installing H-shaped steel into the bedrock under overhead lines at a height of 5.0m." 【Method Classification】 ■ LH-RR Method ■ LH-DH Method ■ LH-CDH Method ■ CHV Method (can be used in combination with LH methods) *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Basic machinery

It demonstrates its power in demanding work conditions.

Our company handles "foundation machinery" that demonstrates its power in demanding work conditions. We offer a variety of products, including the "RX2300," which makes it easy to perform pulling operations with auger screws and sheet piles, and the "CCH300T-2," which can be used for various applications as a power source for vibrators and augers. Please feel free to contact us if you have any requests. 【Product Lineup】 ■RX2300 ■SRX2700 ■RX3300 ■CCH300T-2 ■CCH500T, etc. *For more details, please download the PDF or contact us.

  • Foundation construction machinery
  • Crane and others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
Prev 1 Next
  • Contact this company

    Contact Us Online

Products

  • Search for Products

Company

  • Search for Companies

Special Features

  • Special Features

Ranking

  • Overall Products Ranking
  • Overall Company Ranking

support

  • site map
IPROS
  • privacy policy Regarding external transmission of information
  • terms of service
  • About Us
  • Careers
  • Advertising
IPROS Services
  • >IPROS GMS | Search site for the manufacturing industry
  • >IPROS | Search site for the B2B industry
COPYRIGHT © 2001-2026 IPROS CORPORATION ALL RIGHTS RESERVED.
Please note that the English text on this page is automatically translated and may contain inaccuracies.