General contractors and subcontractors
敬産興業

Contact this company
Contact Us Online
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationContact this company
Contact Us Online1~1 item / All 1 items
The "ECO-ACE Method" is a type of enlarged base pile method that allows for the entire excavation process, including the enlargement, to be carried out using the earth drill method. It can accommodate a maximum enlarged base diameter of 4.1m (construction diameter). It can be combined with the shaft excavation using three types of cast-in-place piles (earth drill, reverse, all casing). 【Features】 ■ Uses a Remo pump (mixing type slime removal pump) to extract slime ■ Improves the stable liquid to a sand content of less than 1% using a bentonite plant (sand separation device) equipped with a cyclone, ensuring reliable liquid replacement ■ Easy management of enlarged base excavation construction and reliable processing of the enlarged base *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration