iPROS Urban Planning
  • Search for products by classification category

    • Building Materials
      Building Materials
      35541items
    • Facilities
      Facilities
      56661items
    • Lighting and Interior
      Lighting and Interior
      17273items
    • Common materials
      Common materials
      37011items
    • Civil Engineering Materials
      Civil Engineering Materials
      9533items
    • Construction, work and methods
      Construction, work and methods
      27655items
    • Surveys, Measurements, and Services
      Surveys, Measurements, and Services
      30352items
    • IT/Software
      IT/Software
      31820items
    • others
      others
      84500items
    • Store and facility supplies
      Store and facility supplies
      4358items
    • Office and commercial supplies
      Office and commercial supplies
      11463items
    • Hospital and welfare facility supplies
      Hospital and welfare facility supplies
      952items
    • Logistics Equipment
      Logistics Equipment
      7378items
    • Energy and Resources
      Energy and Resources
      11606items
  • Search for companies by industry

    • Information and Communications
      7198
    • others
      6979
    • Building materials, supplies and fixtures manufacturers
      6683
    • Service Industry
      4607
    • Trading company/Wholesale
      2996
    • Other construction industries
      2456
    • Electrical equipment construction business
      642
    • Interior Design
      528
    • Facility Design Office
      492
    • Construction Consultant
      464
    • Architectural design office
      361
    • retail
      345
    • Warehousing and transport related industries
      321
    • Electricity, Gas and Water Industry
      290
    • General contractors and subcontractors
      288
    • Interior construction business
      274
    • Medical and Welfare
      272
    • Educational and Research Institutions
      258
    • Building Management
      253
    • Renovation and home construction industry
      224
    • Water supply and drainage construction business
      204
    • Housing manufacturers and construction companies
      187
    • Transportation
      160
    • Real Estate Developers
      155
    • Fisheries, Agriculture and Forestry
      124
    • Structural Design Office
      66
    • Finance, securities and insurance
      35
    • Restaurants and accommodations
      29
    • self-employed
      29
    • Mining
      26
    • Public interest/special/independent administrative agency
      18
    • Police, Fire Department, Self-Defense Forces
      18
    • Store and building owners
      9
    • Property Owner
      8
    • Government
      8
    • Individual
      8
  • Special Features
  • Ranking

    • Overall Products Ranking
    • Overall Company Ranking
Search for Products
  • Search for products by classification category

  • Building Materials
  • Facilities
  • Lighting and Interior
  • Common materials
  • Civil Engineering Materials
  • Construction, work and methods
  • Surveys, Measurements, and Services
  • IT/Software
  • others
  • Store and facility supplies
  • Office and commercial supplies
  • Hospital and welfare facility supplies
  • Logistics Equipment
  • Energy and Resources
Search for Companies
  • Search for companies by industry

  • Information and Communications
  • others
  • Building materials, supplies and fixtures manufacturers
  • Service Industry
  • Trading company/Wholesale
  • Other construction industries
  • Electrical equipment construction business
  • Interior Design
  • Facility Design Office
  • Construction Consultant
  • Architectural design office
  • retail
  • Warehousing and transport related industries
  • Electricity, Gas and Water Industry
  • General contractors and subcontractors
  • Interior construction business
  • Medical and Welfare
  • Educational and Research Institutions
  • Building Management
  • Renovation and home construction industry
  • Water supply and drainage construction business
  • Housing manufacturers and construction companies
  • Transportation
  • Real Estate Developers
  • Fisheries, Agriculture and Forestry
  • Structural Design Office
  • Finance, securities and insurance
  • Restaurants and accommodations
  • self-employed
  • Mining
  • Public interest/special/independent administrative agency
  • Police, Fire Department, Self-Defense Forces
  • Store and building owners
  • Property Owner
  • Government
  • Individual
Special Features
Ranking
  • Overall Products Ranking
  • Overall Company Ranking
  • privacy policy
  • terms of service
  • About Us
  • Careers
  • Advertising
  1. Home
  2. Facility Design Office
  3. エム・ティ・ケイ
  4. Product/Service List
Facility Design Office
  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration

エム・ティ・ケイ

addressFukushima/Koriyama-shi/Kurume 4-104
phone024-946-7550
  • Official site
last updated:Jan 14, 2022
エム・ティ・ケイlogo
  • Contact this company

    Contact Us Online
  • Company information
  • Products/Services(199)
  • catalog(19)
  • news(0)

エム・ティ・ケイ List of Products and Services

  • category

46~90 item / All 199 items

Displayed results

class="retina-image"

[Construction Example] PTC Pokara - Renovation Project in Iizaka Town, Fukushima Prefecture

We will introduce examples of construction for Japanese-style rooms with sunken kotatsu.

This time, we introduced Pokara into the Japanese-style room with a sunken kotatsu, as well as the dining room, kitchen, and washroom. In the Japanese-style room, it was installed under the feet of the kotatsu and around the tatami mats. In the dining room, kitchen, and washroom, part of the existing floor was removed and Pokara sheets were laid down. *For more details, please download the PDF or feel free to contact us.*

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] New Construction Project in Shinchi Town, Fukushima Prefecture by PTC Pokara

Introducing a comfortable space for around 800 yen per month.

This time, we installed four sheets of 2250 in the master bedroom. It seems that you chose Pokara with the intention of making the bedroom a comfortable space. Furthermore, we were able to keep the initial installation costs low, and the monthly running costs can be kept in the 800 yen range (based on 8 hours on weekdays and 12 hours on weekends). The installation was completed in about 1 to 2 hours. This is a unique achievement of the PTC electric floor heating Pokara. *For more details, please download the PDF or feel free to contact us.

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] PTC Pokara - New Construction Project in Yonezawa City, Yamagata Prefecture

The most common orders from our company PTC are for the construction of living rooms, dining rooms, and kitchens.

This year's snow is piling up more than usual! With that said, we conducted PTC installation in Yonezawa City, Yamagata Prefecture. The most common orders we receive for PTC installations are for living rooms, dining rooms, and kitchens. I analyzed and hypothesized why this LDK (Living-Dining-Kitchen) configuration is the most popular. - The homeowners are in their 40s and are part of the child-rearing generation. - Since both parents work, no one is home during the day on weekdays. - The children spend more time relaxing in the living room than in their own rooms. - On weekends, the entire family gathers in the living room! (As children grow up, they tend to retreat to their own rooms. It's sad ← Actually, the floor heating in the living room is effective against this! Floor heating that keeps children in the living room even as they grow up! It's great! *For more details, please download the PDF or feel free to contact us.

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] PTC Pokara - New Construction Project in Ukyo Ward, Kyoto City, Kyoto Prefecture

In the new construction, 18 floor heating sheets were installed in the living room, dining room, and kitchen.

Each space will be laid out based on the flooring joint markings, and holes of 60mm will be drilled. The installation will be done according to the layout and secured in place. Once the wiring is connected underneath the floor, the installation work will be completed. *For more details, please download the PDF or feel free to contact us.*

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] PTC Pokara - New Construction Project in Date City, Fukushima Prefecture

Electric floor heating has been installed throughout all areas except for the entrance hallway.

The kitchen was efficiently laid out, excluding the space for the sink counter. The wiring for the second floor was dropped and connected to the ceiling area of the first floor. *For more details, please download the PDF or feel free to contact us.

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] PTC Pokara - New Construction Project in Inabe District, Mie Prefecture

It was the construction of part of the living room space and the kitchen.

Every 303 millimeters (one shaku), the sheets will be arranged and holes for wiring will be drilled. The sheets will be lined up according to the arrangement. The sheets will be secured with masking tape to prevent movement. The wiring of the sheets will be connected under the floor and gathered with the primary power supply to the wall where the controller will be installed. If there are no issues found during insulation resistance testing, the installation work will be completed. *For more details, please download the PDF or feel free to contact us.*

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] PTC Pokara - New Construction Project in Koriyama City, Fukushima Prefecture

It was the floor heating installation work for the laundry room, washroom, toilet, and kitchen.

The operational test (temperature rise test) showed that the floor temperature steadily increased from 14 degrees to 22 degrees in about 15 to 30 minutes after the start of operation. *For more details, please download the PDF or feel free to contact us.*

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] PTC Pokara - LDK Renovation Project in Kasugai City, Aichi Prefecture

We have adopted POKARA due to the renovation work of the LDK.

It was a three-system setup with two controllers. *For more details, please download the PDF or feel free to contact us.*

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] PTC Pokara - Western-style Room Renovation Project in Iwaki City, Fukushima Prefecture

We installed 13 sheets of 4500 millimeter wallpaper in a Western-style room with a view of the garden.

It's wonderful to enjoy a very beautiful garden from a warm room with a gentle breeze. *For more details, please download the PDF or feel free to contact us.*

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] PTC Pokara - Renovation Work in Fukushima City, Fukushima Prefecture

As part of the renovation work this time, we installed a carpet in the living dining space.

The controller is integrated with the hot water remote control, intercom, etc. *For more details, please download the PDF or feel free to contact us.

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] PTC Pokara - New Construction Project in Koriyama City, Fukushima Prefecture

Underfloor heating has been installed in the living room, dining room, and kitchen.

The controller can switch on and off in three systems: one controller for two channels and one controller for one channel. It's complete. You can only see the controller, but it heats up properly. *For more details, please download the PDF or feel free to contact us.

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] PTC Pokara - Renovation Work in Aizuwakamatsu City, Fukushima Prefecture

A tatami mat was laid in the living room and the raised Japanese-style room with a sunken hearth.

One of the great things about Poka is its flexibility to adapt to the shape of spaces such as raised tatami rooms and sunken kotatsu. *For more details, please download the PDF or feel free to contact us.*

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] PTC Pokara - Renovation Work in Yamagata City, Yamagata Prefecture

As part of the partial renovation work, we installed eight pieces of vinyl sheet, each measuring 1950 millimeters in length, in a section of the Western-style room.

We peeled back part of the floor to carry out wiring work underneath. We will install a box at the controller installation location and organize the wiring. Once the wall is completed and the controller is installed, we will be finished. Introducing underfloor heating partially, as in this case, is optimal in terms of both cost and construction. *For more details, please download the PDF or feel free to contact us.

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] PTC Pokara - Renovation Work in Kunimi Town, Fukushima Prefecture (Underfloor Installation)

This is a case study of construction from under the floor.

A sheet for underfloor use (power type) will be applied between the joists. The sheet's cable will be plugged into the connector of the dedicated cable for connection. The connection part will be wrapped with self-fusing tape for insulation and waterproofing. This is an important point: insulation material is required underneath this. The insulation material should be installed to closely adhere to the sheet. *Please be careful, as without insulation material, heat will be lost from under the floor, and the floor will not warm up. *For more details, please download the PDF or feel free to contact us.

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] PTC Pokara - Office in Koriyama City, Fukushima Prefecture (Above-Floor Wiring)

We have laid down a track due to the office expansion construction.

From below, a concrete slab, insulation material, and battens were installed. A base was constructed with 12mm plywood, and a floor wiring type sheet was laid between the battens. A groove was made in the floor base to run the wiring and make connections. The connection points will be waterproofed as a moisture prevention measure. A wiring route was created up to the wall near the controller, passing through the wall to connect to the controller. Once the wall is finished and the controller is attached, the work is complete. *For more details, please download the PDF or feel free to contact us.*

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] PTC Pokara - Renovation Work in Setagaya, Tokyo

This time, we installed flooring in the Western-style room, living room, and dining room.

We installed Zetrone (a rigid foam material with three times the insulation performance compared to plywood) on the concrete slab and laid down sheets. We routed the wiring from the wall at the controller installation location to the underfloor and connected it to each sheet. *For more details, please download the PDF or feel free to contact us.

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] PTC Pokara - Renovation Work in Kita-ku, Tokyo

In a partial renovation, 10 sheets of 1200mm floor heating mats were installed in the living and dining areas.

Partial renovations are also our specialty. *For more details, please download the PDF or feel free to contact us.*

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] PTC Pokara, Nerima Ward, Tokyo (LDK Renovation Work)

We installed underfloor heating in the living room, dining room, and kitchen as part of the renovation work on a detached house in Nerima Ward, Tokyo.

Since there is almost no space under the floor, I managed to complete the wiring work by removing the base plywood and utilizing the spare wires. *For more details, please download the PDF or feel free to contact us.*

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] PTC Pokara - New Construction Project in Fukushima City, Fukushima Prefecture

We laid out 10 sheets of 2850 millimeters in the living room.

We will process the wall to create a recess and install controllers and intercoms on the niche wall. This results in a sleek finish as they do not protrude from the wall. *For more details, please download the PDF or feel free to contact us.

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] PTC Pokara - Detached House Renovation Project in Yokosuka City, Kanagawa Prefecture

We laid 9 sheets of 1800 millimeters each in the living room and dining room.

Connect the wiring and connection cable for the underfloor heating sheet under the floor, and wrap the connector part with self-fusing butyl for insulation. Connect the primary power supply of 200 volts to the controller and the secondary wiring of the heating sheet, and it will be complete once mounted on the wall. *For details, please download the PDF or feel free to contact us.

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] PTC Pokara - Apartment Renovation Project in Arakawa Ward, Tokyo

This is an example of a re-roofing project.

We will cut grooves for the wiring route into the existing floor and lay sheets to run the wires through. It is a simple construction to overlay and attach new flooring material on top of that. *For more details, please download the PDF or feel free to contact us.

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] PTC Pokara - New Construction Project in Hadano City, Kanagawa Prefecture

Underfloor heating has been installed in the living room, dining room, and kitchen, including the hallway.

This specification divides the area into two: the living room and the dining kitchen. The wiring for the sheets is connected under the floor. The wiring dropped from the controller is connected to the sheet wiring by system. The wiring has been organized to avoid touching the ground. *For more details, please download the PDF or feel free to contact us.

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] PTC Pokara - Reconstruction Work in Kuwabara Town, Fukushima Prefecture (Above-Floor Wiring)

During the renovation work in the kitchen area, we installed 10 sheets of 600mm flooring along the sink with floor wiring.

The floor heating remote control will be installed on the wall by the service entrance, together with the kitchen switches, outlets, and remote controls. The interior work and various installation works are also completed. *For more details, please download the PDF or feel free to contact us.*

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] PTC Pokara - New Construction Project in Moriya City, Ibaraki Prefecture

It is a new construction project with two Western-style rooms and one living dining room.

The wiring under the floor is also neatly connected. Now we just have to wait for the walls to be built. *For more details, please download the PDF or feel free to contact us.

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] PTC Pokara - Renovation Work in Kobe City, Hyogo Prefecture

It is a double-layer flooring installation on the floor.

The installation was done with a double-layer application over the currently laid floor. We will check the connection points for the new installation and cut grooves for the wiring route of the sheets. The sheets will be arranged according to the layout, and the sheets will be connected to the chase wire (dedicated cable) at the groove section for wiring. The chase wire will be routed to the controller installation position. This completes the installation work. *For more details, please download the PDF or feel free to contact us.

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] PTC Pokara - Renovation Project in Funabiki Town, Tamura County, Fukushima Prefecture

I will explain the construction process with photos.

First, the flooring heating work begins with the carpenter marking the blue cross line. The burrs on the subfloor are removed with a trowel. Any exposed screws are also checked with the trowel and tightened securely. Using the initial markings as a reference, we layout the sheet wiring at intervals of 303 millimeters (one shaku pitch) and drill holes with a diameter of 60 mm to drop the wiring under the floor. After thoroughly cleaning the subfloor, we lay out the sheets and drop the wiring underneath. We continue to lay them out. Once we confirm that there are no debris trapped under the sheets and secure them, the installation work is complete. After finishing the work above the floor, we connect the wiring underneath and run the wires to the controller installation area, measuring the insulation resistance and combined resistance. If there are no issues, the installation work is finished. *For more details, please download the PDF or feel free to contact us.*

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] PTC Pokara - Renovation Work for a Detached House in Suginami Ward, Tokyo

We installed underfloor heating in the living and dining areas on the first and second floors during the renovation work.

The work involved cutting the underlayment and creating wiring routes for the floor wiring installation. *For more details, please download the PDF or feel free to contact us.*

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] PTC Pokara - New Construction Project in Funahiki Town, Tamura County, Fukushima Prefecture

Underfloor heating has been installed in the living room, dining room, and kitchen.

In the dining area and kitchen, there is one 2-channel controller, and in the living room, there is one 1-channel controller, allowing for independent control in three areas. The controller has been installed on the wall next to the kitchen. *For more details, please download the PDF or feel free to contact us.

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] PTC Pokara - New Construction Project in Fukushima City, Fukushima Prefecture

The work involved 10 pieces in total: 7 pieces of 2100 mm for the living room and dining room, and 3 pieces of 1650 mm, all for one channel and one system.

The floor heating controller has been consolidated on the side wall of the kitchen, along with the water heater remote control and others. *For more details, please download the PDF or feel free to contact us.*

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] PTC Pokara - New Construction Project in Fukushima City, Fukushima Prefecture

We installed 12 sheets of 3600 mm and 4 sheets of 5100 mm in a wider Western-style room than we expected.

This time, since the total current of the sheet is 33.6 amperes, it has been divided into three circuits, and a relay box has been linked to the channel controller to allow for collective on/off control. The controller is mounted on the wall at the entrance of the room, so the wiring for the primary side power supply of the sheet has been passed through in advance. This time, since the wall is covered with solid boards instead of cross-laid boards, the installation of openings is more challenging than usual. *For details, please download the PDF or feel free to contact us.

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] PTC Pokara - Apartment Renovation Project in Minato Ward, Tokyo

We have introduced underfloor heating throughout the living space in the apartment renovation project in Minato-ku, Tokyo.

Renovation work on the apartment is quite challenging, as it involves securing wiring routes and workspaces. Controllers are installed near the lighting switches in each room and are divided into specific areas. *For more details, please download the PDF or feel free to contact us.*

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] PTC Pokara - New Construction Project in Nihonmatsu City, Fukushima Prefecture

The installation work consisted of seven pieces of 1950 mm in the dining room and seven pieces of 1500 mm in the bedroom.

We will drill a hole in the base under the floor to run the wiring to the controller installation location. We will create an opening in the wall for the controller installation. Once the interior work is completed, we will install the controller and finish the job. We will turn on the primary power and conduct a trial operation. The temperature before the trial operation is approximately 10 degrees. After about 15 minutes of starting the trial operation, it reaches 18.6 degrees (the red area). *For more details, please download the PDF or feel free to contact us.

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] PTC Pokara - New Construction Project in Tomioka Town, Futaba District, Fukushima Prefecture (Above-Floor Wiring)

We have installed floor heating throughout almost the entire first floor, including the corridor and entrance.

A panel-type floor combining base plywood and insulation material has Zetron 4mm applied, and under it, a floor heating sheet has been installed. The base plywood and Zetron are cut to 80mm width to secure the wiring route and connection space for the sheet. Connections are made within the groove for the wiring route and sealed with wide waterproof tape. The wiring is routed to the installation box on the wall around the kitchen. The controller installation position is consolidated on the wall around the kitchen along with the lighting switch and hot water remote control. The controller will be installed after the interior work is completed. A 9mm plywood is laid under the marble-patterned carpet tile, with the floor heating sheet beneath it. *For more details, please download the PDF or feel free to contact us.*

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] PTC Pokara - Renovation Work in Daigo Town, Kuji District, Ibaraki Prefecture

Due to flood damage repairs, we have laid flooring in the living room, dining room, and kitchen as part of the renovation work on the floors and walls.

One controller for channel 1 in the living room, and one controller for channel 2 in the dining room and kitchen was used for operation. *For more details, please download the PDF or feel free to contact us.

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] PTC Pokara - New Construction Project in Yamagata City, Yamagata Prefecture

This time, we introduced a pocket door to the living room and dining room.

The living room is one step lower than the dining room, so we installed the wiring above the floor since it cannot be run under the floor. The dining room has the wiring dropped down to connect. We will wire up to the controller installation box and wait for the interior work to be completed. Once the interior wallpapering is finished, we will install the controller and that will be the end of the work. *For more details, please download the PDF or feel free to contact us.*

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] PTC Pokara - Apartment Renovation Project in Nagano City, Nagano Prefecture

This is a case study of construction work in a condominium where underfloor wiring could not be done.

This time, due to the inability to install underfloor wiring and the issue of strength preventing the cutting of grooves for above-floor wiring in the renovation work of the apartment, we partially removed the substrate, drilled a 60mm hole, and passed the wiring through for connection. We installed controllers for 2 channels and 1 channel on the wall, and that concluded the work. *For more details, please download the PDF or feel free to contact us.

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] PTC Pokara - New Construction Project in Fukushima City, Fukushima Prefecture

This time, we installed 10 sheets of length 2850 in the living room.

The installation location for the controller will be a decorative wall near the kitchen, where it will be consolidated with the intercom and the hot water heater remote control. Once the wallpapering is completed and the controller is installed, the job will be finished. By creating a recess in the wall for the installation, the space will look neat and tidy. *For more details, please download the PDF or feel free to contact us.*

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] PTC Pokara, Tamura County, Fukushima Prefecture (Case where access under the floor is not possible)

This time, the work was done without being able to enter the crawl space or create grooves for the wiring route.

I connected the connector while hooking the wiring through the hole for the 60-pipe wiring drop. I applied tape to the connector part on the floor and dropped it under the floor. The living room is at the highest point, overlooking the dining and kitchen areas one step below. This is how it looks from the living room. I am looking forward to the finished result. *For more details, please download the PDF or feel free to contact us.*

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

When should you start using floor heating? Here are some guidelines on when to begin using it!

If you know this, you might be able to use it more efficiently than you do now.

"When should I start using floor heating?" "I want to know the guideline for when to start using heating." There may be people who are thinking like this. Also, some might be curious whether it's better to leave it on once they start using it. So this time, we will introduce when to start using floor heating and other related topics. When should heating be started? Is it better to leave floor heating on once it is started? Time it takes for floor heating to warm up after being activated. You can find more details in this column.

  • Floor heating system

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Pokara Onshui - Whole building floor heating in Yonezawa City, Yamagata Prefecture!

It has been adopted for the entire floor heating system of the single-story house.

It's amazing snow here! I forgot to take a picture. After doing a little research, I found out that this year's cumulative snowfall is 615 centimeters, and the average temperature in January is minus 0.8 degrees! It seems that there is indeed more snow than usual this year. Yes. This time, we conducted the installation of pokara onsui in Yonezawa City, Yamagata Prefecture. It's a single-story house with floor heating throughout. Now, please enjoy the tour while looking at the installation photos. How is it, everyone? Just imagining life in the new home makes my mouth water! With this, the cold winter in Yonezawa will be super comfortable!! Please feel free to contact our company for your needs! We will carry out the work with all our heart! *For more details, please download the PDF or feel free to contact us.

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] PTC Pokara - New Construction Project in Kuwari Town, Date County, Fukushima Prefecture

This time, it was the floor heating installation work for the living dining kitchen.

The kitchen is arranged so that even after standing for long periods, the toes and the entire foot warm up. The wiring is routed under the floor to the controller. A double-gang mounting box is fixed to the pillar with screws, and once the wall interior is completed, an opening is made to install the controller. The controller is consolidated with the intercom and lighting switches on the walls around the kitchen. *For more details, please download the PDF or feel free to contact us.*

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] PTC Pokara - New Construction Project in Tsukuba City, Ibaraki Prefecture

This time, it was installed in the first-floor living dining kitchen and the second-floor bedroom.

You can also check the installation status of each section in the photos. *For more details, please download the PDF or feel free to contact us.*

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] PTC Pokara - Minamisoma City, Fukushima Prefecture (New Construction of Inkyobun)

This time, with the establishment of the retirement building, we have introduced a lot of "pocara" in almost all areas, including the living room, kitchen, changing room, bedroom, and study.

Controllers were installed for each space, allowing for individual access and exit. *For details, please download the PDF or feel free to contact us.*

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] PTC Pokara - Renovation Work in Fukushima City, Fukushima Prefecture (Above-Floor Wiring)

This time, since we couldn't go under the floor, we created a 60mm wide groove in the floor base to run the wiring.

Behind the area where the sheet is laid out, a fireplace is also prepared, making it perfect for both cold weather measures and atmosphere. The controller is also installed, and it's complete. Now, all that's left is to wait for the winter general. *For more details, please download the PDF or feel free to contact us.*

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] PTC Pokara - Renovation (Apartment) in Setagaya, Tokyo

We installed flooring in the living dining area during the apartment renovation work.

We laid Zetrone, which has excellent insulation properties, on top of the concrete slab, and then installed the Pokara sheet on top of that. Zetrone is excellent in both insulation and electrical insulation, making it safe even on concrete. *For more details, please download the PDF or feel free to contact us.*

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
Prev 12345 Next
  • イプロスがリアル展示会を主催します! AI/DX 営業・マーケティング展 出展社募集中 リード数・商談数が止まらない!新しいリアル展示会を提供 会期 2026年3月24日(火)~25日(水) 会場 東京ビッグサイト東4ホール 出展概要資料を進呈!
    • Contact this company

      Contact Us Online

    Products

    • Search for Products

    Company

    • Search for Companies

    Special Features

    • Special Features

    Ranking

    • Overall Products Ranking
    • Overall Company Ranking

    support

    • site map
    IPROS
    • privacy policy Regarding external transmission of information
    • terms of service
    • About Us
    • Careers
    • Advertising
    COPYRIGHT © 2001-2025 IPROS CORPORATION ALL RIGHTS RESERVED.
    Please note that the English text on this page is automatically translated and may contain inaccuracies.