Other construction industries
東洋テクノ
Contact this company
Contact Us Online
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationContact this company
Contact Us Online1~1 item / All 1 items
The "newACE method" is an earth drill type of cast-in-place concrete pile with an enlarged base. By achieving a reduction in pile volume compared to conventional methods, it allows for a decrease in the amount of concrete and excavation volume. Additionally, by facilitating construction management, it has become possible to carry out construction reliably. The construction process after the enlarged base excavation is the same as that of traditional cast-in-place pile methods. 【Features】 ■ Reduction of concrete and excavation volume ■ Leveling of the periphery of the enlarged base ■ Reliable treatment of the hole bottom ■ Applicable to concrete design strength standards up to Fc=60N/mm2 ■ Easy management of the enlarged volume *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration