iPROS Urban Planning
  • Search for products by classification category

    • Building Materials
      Building Materials
      35536items
    • Facilities
      Facilities
      56658items
    • Lighting and Interior
      Lighting and Interior
      17273items
    • Common materials
      Common materials
      37011items
    • Civil Engineering Materials
      Civil Engineering Materials
      9535items
    • Construction, work and methods
      Construction, work and methods
      27653items
    • Surveys, Measurements, and Services
      Surveys, Measurements, and Services
      30352items
    • IT/Software
      IT/Software
      31890items
    • others
      others
      84581items
    • Store and facility supplies
      Store and facility supplies
      4358items
    • Office and commercial supplies
      Office and commercial supplies
      11463items
    • Hospital and welfare facility supplies
      Hospital and welfare facility supplies
      952items
    • Logistics Equipment
      Logistics Equipment
      7378items
    • Energy and Resources
      Energy and Resources
      11606items
  • Search for companies by industry

    • Information and Communications
      7198
    • others
      6981
    • Building materials, supplies and fixtures manufacturers
      6683
    • Service Industry
      4607
    • Trading company/Wholesale
      2996
    • Other construction industries
      2455
    • Electrical equipment construction business
      642
    • Interior Design
      528
    • Facility Design Office
      492
    • Construction Consultant
      464
    • Architectural design office
      361
    • retail
      345
    • Warehousing and transport related industries
      321
    • Electricity, Gas and Water Industry
      290
    • General contractors and subcontractors
      288
    • Interior construction business
      274
    • Medical and Welfare
      272
    • Educational and Research Institutions
      258
    • Building Management
      253
    • Renovation and home construction industry
      224
    • Water supply and drainage construction business
      204
    • Housing manufacturers and construction companies
      187
    • Transportation
      160
    • Real Estate Developers
      155
    • Fisheries, Agriculture and Forestry
      124
    • Structural Design Office
      66
    • Finance, securities and insurance
      35
    • Restaurants and accommodations
      29
    • self-employed
      29
    • Mining
      26
    • Public interest/special/independent administrative agency
      18
    • Police, Fire Department, Self-Defense Forces
      18
    • Store and building owners
      9
    • Property Owner
      8
    • Government
      8
    • Individual
      8
  • Special Features
  • Ranking

    • Overall Products Ranking
    • Overall Company Ranking
Search for Products
  • Search for products by classification category

  • Building Materials
  • Facilities
  • Lighting and Interior
  • Common materials
  • Civil Engineering Materials
  • Construction, work and methods
  • Surveys, Measurements, and Services
  • IT/Software
  • others
  • Store and facility supplies
  • Office and commercial supplies
  • Hospital and welfare facility supplies
  • Logistics Equipment
  • Energy and Resources
Search for Companies
  • Search for companies by industry

  • Information and Communications
  • others
  • Building materials, supplies and fixtures manufacturers
  • Service Industry
  • Trading company/Wholesale
  • Other construction industries
  • Electrical equipment construction business
  • Interior Design
  • Facility Design Office
  • Construction Consultant
  • Architectural design office
  • retail
  • Warehousing and transport related industries
  • Electricity, Gas and Water Industry
  • General contractors and subcontractors
  • Interior construction business
  • Medical and Welfare
  • Educational and Research Institutions
  • Building Management
  • Renovation and home construction industry
  • Water supply and drainage construction business
  • Housing manufacturers and construction companies
  • Transportation
  • Real Estate Developers
  • Fisheries, Agriculture and Forestry
  • Structural Design Office
  • Finance, securities and insurance
  • Restaurants and accommodations
  • self-employed
  • Mining
  • Public interest/special/independent administrative agency
  • Police, Fire Department, Self-Defense Forces
  • Store and building owners
  • Property Owner
  • Government
  • Individual
Special Features
Ranking
  • Overall Products Ranking
  • Overall Company Ranking
  • privacy policy
  • terms of service
  • About Us
  • Careers
  • Advertising
  1. Home
  2. Other construction industries
  3. 大勇フリーズ
  4. Product/Service List
Other construction industries
  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration

大勇フリーズ

addressSaitama/Kawaguchi-shi/Kiso-ro 7-1
phone048-290-5611
  • Official site
last updated:Jun 11, 2018
大勇フリーズlogo
  • Contact this company

    Contact Us Online
  • Before making an inquiry

    Download PDF
  • Company information
  • Products/Services(47)
  • catalog(41)
  • news(1)

大勇フリーズ List of Products and Services

  • category

1~45 item / All 47 items

Displayed results

class="retina-image"

Introduction of the "Continuous Water Freezing Method" for Piping Construction! *Announcement of the Opening of the Kyushu Sales Office

[Kyushu Area Expansion] It is now possible to carry out piping branch and valve replacement work, as well as expansion work, with minimal water drainage! Piping work can be done without shutting off water supply to the entire building.

The "freezing method (for buildings)" is a technique that uses liquid air (nitrogen) to freeze the water inside pipes, allowing for the replacement of pipe branches and valves, as well as expansion work, with minimal water drainage. The frozen section acts as a stop valve, enabling plumbing work to be carried out without shutting off the water supply to the entire building. 【Features】 ■ Minimal water drainage - Allows for replacement even with integrated valves - Reduces construction time ■ Foam extinguishing is also compatible with freezing! - Numerous construction achievements using foam extinguishing agents - Reduces both chemical and processing costs ■ Water pressure resistance up to 1.4 MPa Due to an increase in inquiries from across the country, we established a Kyushu sales office in the spring of 2022. <Main achievements in Kyushu (partial list)> - Hotel New Otani - Comfort Hotel - NHK Fukuoka Broadcasting Station - Asahi Beer Hakata Brewery - Lala Place Atago - Nippon Steel Oita Steelworks, among many others Of course, we can respond anywhere in the country. *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method
  • Piping Equipment
  • Drainage and water removal

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Introduction to "Frozen Method" for Plumbing Work in Firefighting Equipment Renewal!

Firefighting equipment can be replaced with minimal water drainage! More people are utilizing the "freeze method" during the replacement of the deluge valves due to the revised inspection standards for foam firefighting equipment.

The "freezing method (for buildings)" is a technique that uses liquid air (nitrogen) to freeze the water in pipes, allowing for the replacement of pipe branches and valves, as well as expansion work, with minimal water drainage. The frozen section acts as a stop valve, enabling plumbing work to be carried out without shutting off the water supply to the entire building. Recently, due to the revision of inspection standards for foam fire extinguishing systems, more companies are utilizing this method when replacing open valves. It can also reduce construction time and the cost of chemical disposal, so if you are interested, please feel free to consult with us. 【Features】 ■ Minimal water drainage - Possible to replace even with integrated valves - Reduced construction time ■ Foam extinguishing is also okay with freezing! - Numerous construction achievements using foam extinguishing agents - Reduced chemical and disposal costs ■ Water pressure resistance up to 1.4 MPa *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method
  • Piping Equipment
  • Drainage and water removal

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping Construction "Continuous Water Freezing Method" [Daiyuu News] 2022 New Year Edition

Consultations for construction are increasing in Fukuoka Prefecture! New achievements in Kitakyushu City and Nogata City. Introduction of the new fiscal year issue.

We would like to introduce the "Daiyuu Newspaper 2022 New Fiscal Year Edition (April-May)" published by Daiyuu Freeze. This document includes topics such as "200mm freezing construction at the Hikino water purification plant in Kitakyushu" and "closing of two receiving pipes using the DSP method in Nogata." Please take a moment to read it. [Contents] ■ 200mm freezing construction at the Hikino water purification plant in Kitakyushu ■ Closing of two receiving pipes using the DSP method in Nogata ■ Opening of the Kyushu Sales Office in March 2022 *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping Construction "Continuous Water Freezing Method" [Daiyuu News] February-March 2022 Issue

About 30 employees from the Kanuma City Waterworks Department and local plumbing union members are focusing on the technology of Daiyu Freeze! Introduction of the spring issue at the end of the fiscal year.

We would like to introduce the "Daiyuu Newspaper February-March 2022" published by Daiyuu Freeze. This document includes announcements such as "Demonstration held at the Kanuma City Waterworks Department in Tochigi Prefecture!" and "Notice of price revision starting from the 2022 fiscal year." Please take a moment to read it. [Contents] ■ Demonstration held at the Kanuma City Waterworks Department in Tochigi Prefecture! ■ Notice of price revision starting from the 2022 fiscal year ■ We accept demonstration requests *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping Construction "Continuous Water Freezing Method" [Daiyū News] December 2021 - January Issue

Attention to the freezing construction method is gathering interest from other cities, with approximately 600 construction achievements in Kawasaki City annually! Introduction of the year-end and New Year issue.

We would like to introduce the "Daiyuu Newspaper December 2021 - January Issue" published by Daiyuu Freeze. This document includes articles such as "Yokohama City Waterworks Bureau Inspects! Attention on Freezing Method in Kawasaki City!" and "Notice of Price Revision Starting from Fiscal Year 2022." Please take a moment to read it. [Contents] ■ Yokohama City Waterworks Bureau Inspects! Attention on Freezing Method in Kawasaki City! ■ Notice of Price Revision Starting from Fiscal Year 2022 ■ Demonstrations Available *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping Construction "Constant Water Freezing Method" [Daiyuu News] October 2021 Issue

Over a hundred air valve replacements every year! Announcement of price revisions starting from the fiscal year 2022, etc.

We would like to introduce the "Daiyuu Newspaper October 2021" published by Daiyuu Freeze. This document includes information on "frozen and DSP construction methods in Ishikawa Prefecture" and "notification of price revisions starting from the 2022 fiscal year." Please take a moment to read it. [Contents] ■ This year, air valve replacements begin in Hokuriku Frozen and DSP construction methods in Ishikawa Prefecture ■ *Notification of price revisions starting from the 2022 fiscal year ■ Demonstrations available *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping Construction "Continuous Water Freezing Method" [Daiyū News] August 2021 Issue

The trend of increasing freeze construction achievements in the northern Kanto region! Includes images of liquid nitrogen injection.

We would like to introduce the "Daiyuu Newspaper August 2021" published by Daiyuu Freeze. This document includes information on "the implementation of the freezing method for F-type T-pipes in Takasaki City, Gunma Prefecture" and "the freezing method for the repair and replacement of fire hydrants and air valves." Please take a moment to read it. [Contents] ■ Implementation of the freezing method for F-type T-pipes in Takasaki City, Gunma Prefecture ■ Freezing method for the repair and replacement of fire hydrants and air valves *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Daiyuu Freeze's freezing method

Leave the renovation work of aging fire hydrants and air valves to Daiyu Freeze's freezing method!

We would like to introduce Daiyuu Freeze's "Freezing Method." Excavation dimensions can be minimized, contributing to cost reduction. The main pipe can be updated without stopping it, and the repair valve can be replaced as well. Our company has an annual track record of approximately 400 construction sites nationwide. Please feel free to contact us for estimates or inquiries regarding construction. 【Features】 ■ Excavation dimensions can be minimized ■ Contributes to cost reduction ■ Repair valve can be replaced ■ Annual track record of approximately 400 construction sites nationwide ■ Can be updated without stopping the main pipe (consultation required for main pipe diameter of Φ300 or more) *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Special Construction Method
  • maintenance

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Would you like to experience Daiyuu Freeze's "Freezing Method and Continuous Water Method" firsthand?

Notice of "Construction Method Demonstration"! We have been conducting this for many waterworks departments and contractors.

At Daiyu Freeze Co., Ltd., we offer demonstrations of various non-stop water construction methods, including the freezing method. We will address any questions or concerns you may have, such as "What kind of method is it?", "Is it safe?", and "What are the benefits?". For information on the required time, implementation locations, and actual construction methods, please feel free to contact us. 【Main municipalities where we operate】 ■ Yokohama City ■ Kawasaki City ■ Kashiwa City ■ Saitama City ■ Kawaguchi City ■ Kasukabe City ■ Maebashi City, etc. (Titles omitted) *For more details, please refer to the PDF materials or feel free to contact us.

  • Renovation and repair methods
  • Special Construction Method
  • maintenance

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping Construction "Constant Water Freezing Method" [Daiyū News] April 2021 Issue

Construction of the 400A freezing method in Kasukabe City, Saitama Prefecture! Includes excavation holes, freezing locations, connection points, and more.

We would like to introduce the "Daiyuu Newspaper April 2021 Special Edition" published by Daiyuu Freeze. This document includes information on "Successful freezing completed with many achievements even with large diameters" and "350A freezing construction in Ohtawara City, Tochigi Prefecture." Please take a moment to read it. [Contents] ■ Successful freezing completed with many achievements even with large diameters ■ 350A freezing construction in Ohtawara City, Tochigi Prefecture *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping Construction "Continuous Water Freezing Method" [Daiyuu News] January 2021 Supplement Issue

Emergency night construction of DCV300A in Musashino City, Tokyo! After cutting, the freezing maintenance status and new piping conditions are also posted.

We would like to introduce the "Daiyuu Newspaper January 2021 Special Edition" published by Daiyuu Freeze. This document includes information on "achieving a certain level of evaluation for emergency response capabilities" and "200A fusion construction in Kokubunji City, Tokyo." Please take a moment to read it. [Contents] ■ Achieving a certain level of evaluation for emergency response capabilities ■ 200A fusion construction in Kokubunji City, Tokyo *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping Construction "Continuous Water Freezing Method (Building)" [Daiyu News] December 2020 Issue

We held a technology transfer meeting! We are also publishing photos of the ongoing frozen construction method.

We would like to introduce the "Daiyuu Newspaper December 2020" published by Daiyuu Freeze. This document includes information on the Maebashi City <Freezing Method> Technology Inheritance Meeting, employee introductions, and a visit to the construction site of the new "Shikishima Purification Plant Water Tower" by the Maebashi City Waterworks Bureau. We accept construction requests from all over the country. We are available on holidays and at night, so please feel free to contact us when needed. [Contents] ■ Maebashi City <Freezing Method> Technology Inheritance Meeting ■ Employee Introductions ■ Visit to the construction site of the new "Shikishima Purification Plant Water Tower" by the Maebashi City Waterworks Bureau! *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping construction "Freeze construction method (building)" revolutionary thawing method for non-stop water freeze construction.

A groundbreaking non-flame thawing method has been developed that allows for plumbing branch and valve replacements and expansion work with minimal water drainage using a continuous water freezing method!

The "Non-Water Freezing Method" is a technique that uses liquid air (nitrogen) to freeze water inside pipes, allowing for the replacement of pipe branches and valves, as well as expansion work, with minimal water drainage. The frozen section acts as a stop valve, enabling plumbing work to be carried out without shutting off water supply to the entire building. After using the freezing method, it is essential to perform thawing work on the frozen areas, but a new thawing method called "DOWT" has been developed, which allows for thawing without the use of fire and in a short time! 【Features】 ■ The frozen section can temporarily serve as a substitute for a valve, leaving nothing remaining on the pipe. ■ Reduces the time required for water outage work. ■ Contributes to the longevity of pipes. ■ Can be thawed in the same time or less than using fire. * For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method
  • Piping Equipment
  • Drainage and water removal

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping work and water pipe repair "Freezing method: Continuous water freezing method" New warranty system

A construction method that allows for pipe branching, valve replacement, and expansion work with minimal water drainage! We have newly started a warranty system for the "freezing method"!

The "freezing method (for buildings)" is a technique that uses liquid air (nitrogen) to freeze the water inside pipes, allowing for branch pipe work, valve replacement, and expansion work with minimal water drainage. The frozen section acts as a stop valve, enabling plumbing work to be carried out without shutting off the water supply to the entire building. To ensure that you can use the "freezing method" with even greater peace of mind, we have introduced a new "guarantee system." There are no cumbersome procedures or additional costs; it will apply simply by placing your order as usual. *For more details, please refer to the PDF document or feel free to contact us.*

  • Special Construction Method
  • Piping Equipment
  • Drainage and water removal

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Frozen construction method for water supply and building/mansion piping renovations! Overwhelming reduction in construction time.

Published in the global scientific journal "Science Advances." Numerous achievements in national government offices and the private sector! Case study materials are also available!

The "freezing method (for buildings)" involves using liquid air (nitrogen) to freeze the water inside pipes, allowing for the replacement or addition of pipe branches and valves with minimal water drainage. The frozen section acts as a stop valve, enabling plumbing work to be carried out without shutting off the water supply to the entire building. A paper on the continuous water freezing method has been published in Science Advances, a globally recognized scientific journal. (We received assistance from Professor Yoshiyasu Muto of Keio University, Faculty of Environmental Information.) ■ The frozen section can temporarily serve as a substitute for a valve, leaving nothing behind in the pipes. ■ It can shorten the time required for water outage work. *For more details, please contact us or download the PDF.

  • Special Construction Method
  • Piping Equipment
  • Drainage and water removal

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping construction "Freezing method (building)" continuous water freezing method 'DSP method'

It is possible to carry out the "closure work on the T-shaped pipe for two receivers" without shutting off the main pipe!

The "DSP Method" is a technique used for branching pipes in T-shaped pipes, split T-shaped pipes, and welded piping, where it is difficult to apply freezing methods. When using freezing methods for branching sections, there are conditions and limitations, but with the "DSP Method," valve replacement and shut-off work can be done safely and without worry. 【Features】 ■ Allows construction related to branching sections of piping that are difficult with freezing methods. ■ Enables smooth construction related to branching sections from large-diameter pipes, which was previously challenging. *For more details, please refer to the PDF document or feel free to contact us.

  • Piping Equipment
  • Drainage and water removal
  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping construction "Freezing method (building)" continuous water freezing method 'DCV method'

When freezing methods cannot be used! Mechanically stop water at any location!

The "DCV method" is a construction technique that involves mechanically stopping water by installing a saddle at any location on existing piping, in order to minimize the range of muddy water and water outages. Since VP pipes and ACP pipes may be damaged by freezing methods, the "DCV method" is adopted as an alternative. This method can stop water flow, so if customers request to carry out work while in a leak state, we will accommodate this request using this method. 【Features】 - Compact and lightweight design reduces the burden on piping during work and after burial. - Combinations with methods such as "freezing method" and "DCV method" are possible according to the application. - If water stoppage is needed after construction, it can be re-stopped by excavating to the flange area. - This method does not accommodate hot water piping. *For more details, please refer to the PDF materials or feel free to contact us.

  • Piping Equipment
  • Special Construction Method
  • Drainage and water removal

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping construction "Freezing method (building)" continuous water freezing method 'DOWS method'

The basic principle is to combine it with other construction methods! The effectiveness of the combined construction methods increases, leading to a reduction in construction time.

The "DOWS method" is a technique used to assist "freezing methods" and "DSP methods" by temporarily stopping the flow of water (temporary water stopping). This method is not used alone; it is fundamentally combined with other methods. By adopting the "DOWS method," it is possible to avoid complete water stoppage, enhance the effectiveness of the combined methods, and shorten construction time. 【Features】 ■ Freezing is possible without operating existing valves ■ No concerns about damage, leaks, or discolored water due to valve operation ■ When freezing methods are applied at both ends, the area of water stoppage can be minimized ■ Installed at the section of pipe removal, leaving no saddle after construction ■ If the valve does not work and does not freeze with the "freezing method," it is also possible to apply the "DOWS method" later *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Piping Equipment
  • Drainage and water removal

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping construction "Freezing method (building)" continuous water freezing method 'Freezing method (building)'

A construction method that allows for the replacement and expansion of piping branches and valves with minimal water drainage!

The "freezing method (for buildings)" is a technique that uses liquid air (nitrogen) to freeze the water inside pipes, allowing for branch pipe and valve replacement work, as well as expansion work, with minimal water drainage. The frozen section acts as a stop valve, enabling plumbing work to be carried out without shutting off the water supply to the entire building. 【Features】 ■ The frozen section can temporarily serve as a substitute for a valve, leaving nothing on the piping. ■ It reduces the time required for water outage work. *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Piping Equipment
  • Drainage and water removal

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Introduction to the Freezing Method (Buried Related)

We respond to government offices nationwide! We will meet your needs with our unwavering and abundant track record and experience!

The "Freezing Method (Buried Related)" is a technique suitable for temporary water stoppage for replacement or rerouting of pipes. The frozen section can be temporarily used as a substitute for a valve, leaving nothing remaining in the piping. Additionally, it can shorten the time required for water outages. 【Features】 ■ Compatible with GX pipes ■ Supports DIP up to Φ500 ■ Enables reduction of water outage time and measures against red water *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping Construction "Constant Water Freezing Method (Building)" [Daiyuu News] July 2017 Issue

Support available on holidays and at night! Successful freezing experiment on HPPE pipes at Daiyu Freeze Facility in Kawaguchi City.

We would like to introduce the "Daiyū Newspaper July 2017" published by Daiyū Freeze. This document includes information about many members of the Polyethylene Pipe System Association for Water Distribution who observed freezing experiments, as well as employee introductions. We accept construction requests from all over the country. We are also available on holidays and at night, so please feel free to contact us when needed. [Contents] ■ Many members of the Polyethylene Pipe System Association for Water Distribution observed freezing experiments ■ Employee introductions *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping Construction "Continuous Water Freezing Method (Building)" Daiyū News May 2017 Issue Private Sector

Daiyuu Freeze utilized its extensive experience to carry out freezing work at Shinjuku Mitsui Building 450A!

We would like to introduce the "Daiyuu Newspaper May 2017 (Private)" published by Daiyuu Freeze. This document includes high praise for the safety and quality improvements from the Renewal Division of Shin Nippon Air Conditioning Co., Ltd., as well as information about the continuous water freezing method being featured in "Science Advances." We accept construction requests from all over the country. We also respond on holidays and at night, so please feel free to contact us when needed. [Contents] ■ High praise for safety and quality improvements from the Renewal Division of Shin Nippon Air Conditioning Co., Ltd. ■ Employee introduction ■ Continuous water freezing method featured in "Science Advances" *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping Construction "Continuous Water Freezing Method (Building)" [Daiyuu News] May 2017 Issue

Daiyū Freeze conducts demonstration work to gain safety and trust, receiving high praise!

We would like to introduce the "Daiyuu Newspaper May 2017" published by Daiyuu Freeze. This document includes a demonstration construction conducted by the Kasukabe City Water Department, employee introductions, and the announcement that the new construction method name has been decided as "EXIV." We accept construction requests from all over the country. We also respond on holidays and at night, so please feel free to contact us when needed. [Contents] ■ Demonstration construction conducted by the Kasukabe City Water Department ■ Employee introductions ■ Double freeze construction method patented! The new construction method name has been decided as "EXIV." *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping Construction "Continuous Water Freezing Method (Building)" [Daiyū News] March 2017 Issue

From now on, we will also consider large-diameter freezing construction in Toyonaka City! Please contact us if you need our services.

We would like to introduce the "Daiyuu Newspaper March 2017" published by Daiyuu Freeze. This document includes information about the simultaneous construction of two locations with a diameter of 300mm at the Nobatake Water Supply Station in Toyonaka City, as well as employee introductions and details about obtaining ISO 9001 certification for our quality management system. We accept construction requests from all over the country. We are available on holidays and at night, so please feel free to contact us when needed. [Contents] ■ Simultaneous construction of two locations with a diameter of 300mm at the Nobatake Water Supply Station in Toyonaka City ■ Employee introductions ■ Obtaining ISO 9001 certification for our quality management system *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping Construction "Continuous Water Freezing Method (Building)" [Daiyū News] June 2016 Issue

I won the "Entrepreneur Excellence Award" at the Kawasaki Entrepreneur Audition!

We would like to introduce the "Daiyuu Newspaper June 2016" published by Daiyuu Freeze. This document covers the initiation of device development aimed at reducing freezing time, employee introductions, and the acquisition of ISO 9001 certification for the quality management system. We accept construction requests from all over the country. We are also available on holidays and at night, so please feel free to contact us when needed. [Contents] ■ Initiation of device development for reducing freezing time ■ Employee introductions ■ Acquisition of ISO 9001 certification for the quality management system *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping Construction "Continuous Water Freezing Method (Building)" [Daiyuu News] September 2015 Issue

Aiming for greater safety and work efficiency! The release of a new defrosting method has been decided.

We would like to introduce the "Daiyuu Newspaper September 2015" published by Daiyuu Freeze. This document includes the introduction of new thawing equipment for on-site implementation, employee introductions, and information about obtaining ISO 9001 certification for our quality management system. We accept construction requests from all over the country. We also respond on holidays and at night, so please feel free to contact us when needed. [Contents] ■ Introduction of new thawing equipment for on-site implementation ■ Employee introductions ■ Obtaining ISO 9001 certification for quality management system *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping Work "Continuous Water Freezing Method (Building)" [Daiyū News] April 2015 Issue

"Frozen construction method" expands overseas! Leave large-diameter simultaneous freezing to our company, which has a wealth of experience.

We would like to introduce "Daiyuu Newspaper April 2015" published by Daiyuu Freeze. This document includes information about the successful commencement of construction in Shanghai, China, employee introductions, and simultaneous freezing at 14 locations using SGP200A. We accept construction requests from all over the country. We also respond on holidays and at night, so please feel free to contact us when needed. [Contents] ■ Successful construction in Shanghai, China ■ Employee introductions ■ Simultaneous freezing at 14 locations using SGP200A *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping Construction "Constant Water Freezing Method (Building)" [Daiyuu News] First Issue

Attention to the construction consulting industry "frozen construction method"! Please contact us when you need our services.

We would like to introduce the "Daiyū Newspaper First Issue" published by Daiyū Freeze. This document includes updates on the achievements of the "largest diameter," employee introductions, and information about the "DOWS method," which has expanded the possibilities of continuous water supply. We accept construction requests from all over the country. We also respond on holidays and at night, so please feel free to contact us when needed. [Contents] ■ Updates on the achievements of the "largest diameter" ■ Employee introductions ■ Information about the "DOWS method," which has expanded the possibilities of continuous water supply *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping Construction "Continuous Water Freezing Method (Building)" [Daiyuu News] October 2020 Issue

Leave leak repairs to Daiyū Freeze! Numerous installations using freezing and Daiyū's original methods in various municipalities.

We would like to introduce the "Daiyuu Newspaper October 2020" published by Daiyuu Freeze. This document includes support for leak repairs in Tochigi City, as well as information on using freezing methods, concerns about whether leaks or secondary shut-off valves will work, and details about the 124th Kawasaki Entrepreneur Audition. Please feel free to contact us if you have any inquiries. 【Contents】 ■ Support for leak repairs in Tochigi City ■ Interested in using freezing methods but unsure if leaks or secondary shut-off valves will work... ■ 124th Kawasaki Entrepreneur Audition Business Idea Seed Market ■ The birth of a revolutionary thawing method that does not use fire, DOWT *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping Work "Continuous Water Freezing Method (Building)" [Daiyuu News] August 2020 Issue

Yokohama City Waterworks Bureau Distribution Division! A freeze construction method briefing was held at Nakamura Water Plaza.

We would like to introduce the "Daiyū Newspaper August 2020" published by Daiyū Freeze. This document includes approximately 50 participants from the Northern and Southern Water Supply Management Division, examples of questions and answers from the day, and information about the freezing of fire hydrants and site visits in Maebashi City. Please feel free to contact us if you have any inquiries. [Contents] ■ Approximately 50 participants from the Northern and Southern Water Supply Management Division ■ Example of questions and answers from the day ■ Freezing of fire hydrants and site visits in Maebashi City ■ The birth of a groundbreaking defrosting method that does not use fire, DOWT *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping Work "Continuous Water Freezing Method (Building)" [Daiyuu News] June 2020 Issue

Tokyo Metropolitan Waterworks Bureau DCV φ300 construction! Night work due to pipe replacement within the jurisdiction of the Central Branch.

We would like to introduce the "Daiyuu Newspaper June 2020" published by Daiyuu Freeze. This document discusses the increasing trend of temporary water stop methods in Tokyo, the advantages of the DCV method, and information about on-site demonstrations in municipalities across the country. We can provide explanations using our original demonstration kits for various methods. If you have any requests, we offer this service for free, so please feel free to consult with us. [Contents] ■ Increasing trend of temporary water stop methods in Tokyo ■ Advantages of the DCV method ■ On-site demonstrations available in municipalities nationwide ■ Birth of a revolutionary thawing method that does not use fire: DOWT *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping Construction "Continuous Water Freezing Method (Building)" [Daiyu News] April 2020 Issue

In order to respond to the increasing requests, we will strengthen our workforce! A new era of Daiyuu Freeze is about to begin.

We would like to introduce "Daiyuu Newspaper April 2020" published by Daiyuu Freeze. This document covers the new beginning of Daiyuu Freeze, the successful exchange of over 200 air valves, and on-site demonstrations in municipalities across the country. We can explain our original various construction methods using dedicated demo kits. If you have any requests, we are happy to accommodate them for free, so please feel free to consult with us. [Contents] ■ The new beginning of Daiyuu Freeze ■ Successful exchange of over 200 air valves ■ On-site demonstrations available in municipalities nationwide ■ The birth of a revolutionary defrosting method that does not use fire: DOWT *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping Construction "Continuous Water Freezing Method (Building)" [Daiyuu News] February 2020 Issue

Many achievements in large-diameter pipe freezing construction! In the past, there have been successful projects with 500A in Kitakyushu City and Soka City.

We would like to introduce "Daiyuu Newspaper February 2020" published by Daiyuu Freeze. This document includes the introduction of a preliminary survey using flow meters, employee introductions, and the birth of a groundbreaking defrosting method that does not use fire. We accept construction requests from all over the country. We also respond on holidays and at night, so please feel free to contact us when needed. [Contents] ■ Introduction of a preliminary survey using flow meters ■ Employee introductions ■ The birth of a groundbreaking defrosting method that does not use fire DOWT *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping Construction "Continuous Water Freezing Method (Building)" [Daiyuu News] December 2019 Issue

Many air valve replacements have been successfully completed in the Hokuriku region! We are diligently working on freezing and DSP across a wide area of Ishikawa Prefecture.

We would like to introduce the "Daiyuu Newspaper December 2019" published by Daiyuu Freeze. This document includes information such as the replacement of over 200 air valves, the construction area in Ishikawa Prefecture, and employee introductions. We accept construction requests from all over the country. We also respond on holidays and at night, so please feel free to contact us when needed. [Contents] ■ Replacement of over 200 air valves ■ Construction area in Ishikawa Prefecture ■ Employee introductions ■ Birth of a revolutionary thawing method that does not use fire - DOWT *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping Construction "Continuous Water Freezing Method (Building)" [Daiyu News] October 2019 Issue

Responding to needs from all over the country! We carried out DIP300 construction at two locations in Kitakyushu City.

We would like to introduce "Daiyuu Newspaper October 2019" published by Daiyuu Freeze. This document features our engineers who are active throughout Japan, as well as piping and construction status diagrams, and employee introductions. We accept construction requests from all over the country. We also respond on holidays and at night, so please feel free to contact us when needed. [Contents] ■ Our engineers are active throughout Japan ■ Piping and construction status diagrams ■ Employee introductions *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping Construction "Continuous Water Freezing Method (Building)" [Daiyuu News] September 2019 Issue

Despite the rising material costs due to a shortage of skilled labor, our company has decided to maintain the construction prices!

We would like to introduce "Daiyuu Newspaper September 2019" published by Daiyuu Freeze. This document includes information on the decision to keep construction prices unchanged despite rising material costs, the launch of the freeze method guarantee service, and employee introductions. We accept construction requests from all over the country. We also respond on holidays and at night, so please contact us when needed. [Contents] ■ Decision to keep construction prices unchanged despite rising material costs ■ Launch of freeze method guarantee service ■ Employee introductions ■ Non-flame thawing work DOWT *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Plumbing Work "Continuous Water Freezing Method (Building)" Newsletter September 2020

Successful simultaneous multiple freezing at 'important institutions in Japan'! You can also rely on us for continuous, multiple simultaneous, and remote construction.

We would like to introduce the "Newsletter September 2020" issued by Daiyu Freeze Co., Ltd. In this newsletter, we feature our success in simultaneous multiple freezing at "important institutions in Japan," continuous work for seven days at the Tokyo Yaesu underground parking lot, and the freezing methods used at the gateway to the northern sky. Please take a moment to read it. [Contents] ■ Success in simultaneous multiple freezing at "important institutions in Japan" ■ Continuous work for seven days at the Tokyo Yaesu underground parking lot ■ Freezing methods are making a significant impact at the gateway to the northern sky *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Piping Equipment
  • Drainage and water removal

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Plumbing Work "Continuous Water Freezing Method (Building)" Newsletter May 2020

We are publishing our infection prevention measures and a request for your cooperation regarding the submission of documents in advance.

We would like to introduce the "Newsletter May 2020" issued by Daiyu Freeze Co., Ltd. This newsletter includes information about our infection prevention measures and a request for cooperation regarding the submission of documents in advance from our customers. Our company is committed to infection prevention measures against COVID-19 and will continue to accept construction work as usual. We encourage you to read it. [Contents] ■ Use of thermography for temperature checks before departure ■ Request for cooperation from customers regarding the submission of documents in advance *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Piping Equipment
  • Safety and consumables

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Plumbing Work "Constant Water Freezing Method (Building)" Newsletter March 2020

Even in sites with a large number of locations, we can respond! Please consult us first for any sudden construction needs at the end of the fiscal year.

In the March 2020 issue of the Daiyuu Freeze Newsletter, we introduce the construction work at a certain brewery and a long-established hotel. Recently, we undertook freezing work on φ300 steel pipes at a certain brewery in Kyoto. The fluid inside the pipes is generally referred to as "antifreeze," but it is possible to perform freeze stop work. Additionally, during a large-scale renovation of a long-established inn in Oita Prefecture, we assisted with freezing work on approximately 30 piping sections with diameters ranging from φ100 to φ200. For more details, please check the PDF download below. We encourage you to read it. [Contents] ■ Construction work at a certain brewery and long-established hotel ■ Additional acquisition of construction industry ministerial approval ■ Ongoing warranty service *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Piping Equipment
  • Drainage and water removal

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Plumbing Work "Constant Water Freezing Method (Building)" Newsletter January 2020

Introduction to our company's special training on full harnesses and the fact that all vehicles are equipped with studless tires!

We would like to introduce the "Newsletter January 2020" issued by Daiyu Freeze Co., Ltd. The Labor Safety and Health Act enforcement order has been revised, and "safety belts" have been renamed "fall arrest equipment," making the use of full harnesses mandatory. This newsletter includes information about our participation in special training for full harnesses and the fact that all vehicles are equipped with studless tires. Please take a moment to read it. [Contents] ■ Completed special training for full harnesses ■ All vehicles equipped with studless tires ■ Guarantee service ongoing *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Piping Equipment
  • Drainage and water removal

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Plumbing Work "Continuous Water Freezing Method (Building)" Newsletter November 2019

Introducing new construction achievements with water temperature around 35℃ and 300A! We will continue to accept requests without breaks during the year-end and New Year holidays.

We would like to introduce the "Newsletter November 2019" issued by Daiyu Freeze Co., Ltd. This newsletter features new construction achievements with a water temperature of approximately 35℃300A, the new membership as a supporting member of the Japan Air Service Association, and an increase in personnel with 25 new graduates receiving job offers. Please take a moment to read it. [Contents] ■ New construction achievements with a water temperature of approximately 35℃300A ■ New membership as a supporting member of the Japan Air Service Association ■ Increase in personnel with 25 new graduates receiving job offers *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Piping Equipment
  • Drainage and water removal

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Plumbing Construction "Continuous Water Freezing Method (Building)" Newsletter September Issue of Reiwa

Despite the rising material costs due to tax increases, our company will maintain prices! Introducing our warranty system service for frozen construction methods.

In the September issue of the Daiyuu Freeze Newsletter, we introduce the warranty system services related to the freezing method. Amidst the chronic shortage of skilled workers and aging in the domestic workforce, as well as the rising costs of various materials, our company is committed to reducing the burden on our customers by maintaining construction prices through corporate efforts. We have established a system to accommodate last-minute orders and will respond to our customers' needs. For more details, please check the PDF download below. We encourage you to read it. [Contents] ■ Planned consumption tax increase in October 2019 ■ Launch of warranty system services for the freezing method *For more information, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Piping Equipment
  • Drainage and water removal

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pipeline construction "Continuous water freezing method (building)" Daiyuu Freeze newsletter

Frozen work on Φ300 steel pipes was carried out at a certain beer factory in Kyoto! Additionally, frozen work on pipes with diameters of Φ100 to 200 was conducted at about 30 locations in a long-established inn in Oita Prefecture!

The "freezing method (for buildings)" is a technique that uses liquid air (nitrogen) to freeze the water in pipes, allowing for branch work, valve replacement, and expansion work with minimal water drainage. The frozen section acts as a stop valve, enabling plumbing work to be carried out without shutting off water supply to the entire building. In the April 2020 issue of the Daiyu Freeze Newsletter, we introduced our construction achievements at a certain beer factory in Kyoto and a long-established inn in Oita Prefecture. Additionally, we have recently obtained the "Minister of Construction License." We appreciate your continued support! *For more details, please download the PDF or contact us.

  • Special Construction Method
  • Piping Equipment
  • Drainage and water removal

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping Work [Construction Example] DSP Method for Capping the Base of a Double T-Pipe

Enabling the construction of the DSP method in combination with the freezing method! An example of sealing the base of a double T-pipe.

As a professional in renewal construction, Daiyu Freeze continues to protect the city's lifelines by conducting buried water supply pipe work. Here, we introduce a case of the DSP method for sealing the base of a dual-receiving T-pipe. 【Construction Example】 ■ DSP method for sealing the base of a dual-receiving T-pipe 【Construction Explanation】 ■ The branch side of the dual-receiving T-pipe was no longer needed, so it was removed using the DSP method and sealed at the base. ■ Even if there is a curved pipe attached to the branch side of the dual-receiving T-pipe, the combination with the freezing method made it possible to implement the DSP method. *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method
  • Piping Equipment
  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping Work [Construction Example] DSP Method for Capping the Base of a Split T-Pipe

The main line side will be completed without water interruption, only on the branch side! We will introduce examples of the DSP method.

As a professional in renewal construction, Daiyu Freeze continues to protect the lifelines of the city and is engaged in the DSP method. Here, we introduce a case of the DSP method where a plug is placed at the base of a split T-pipe. 【Construction Example】 ■ DSP method for placing a plug at the base of a split T-pipe 【Construction Description】 ■ The DSP method can be used when a previously installed split T-pipe is no longer needed and a plug needs to be placed at the base. ■ The main pipe side can be completed without water interruption, and the work can be finished solely on the branch side. *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Piping Equipment
  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
Prev 12 Next
  • イプロスがリアル展示会を主催します! AI/DX 営業・マーケティング展 出展社募集中 リード数・商談数が止まらない!新しいリアル展示会を提供 会期 2026年3月24日(火)~25日(水) 会場 東京ビッグサイト東4ホール 出展概要資料を進呈!
    • Contact this company

      Contact Us Online
    • Before making an inquiry

      Download PDF

    Products

    • Search for Products

    Company

    • Search for Companies

    Special Features

    • Special Features

    Ranking

    • Overall Products Ranking
    • Overall Company Ranking

    support

    • site map
    IPROS
    • privacy policy Regarding external transmission of information
    • terms of service
    • About Us
    • Careers
    • Advertising
    COPYRIGHT © 2001-2025 IPROS CORPORATION ALL RIGHTS RESERVED.
    Please note that the English text on this page is automatically translated and may contain inaccuracies.