1~7 item / All 7 items
Displayed results
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationContact this company
Contact Us Online1~7 item / All 7 items
The "Column-type Transformer and Streetlight Combined Utility Pole" is a composite pole that integrates lighting and power equipment. It achieves cost performance by integrating equipment and facilities. It is possible to eliminate utility poles (column-type equipment combined poles) even in areas with narrow sidewalks. 【Features】 ■ Composite pole that integrates lighting and power equipment ■ Achieves cost performance by integrating equipment and facilities ■ Possible to eliminate utility poles (column-type equipment combined poles) even in areas with narrow sidewalks *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce examples of the construction of the "Compact Ms Pile Foundation." Our company has carried out the installation of "streetlights (security lights)" at the Misato Town Hall and the installation of "roadside signposts" at the Aoba Ward Office in Sendai City. Please leave the Compact Ms Pile Foundation to us. 【Examples】 ■ Misato Town Hall: Streetlights (security lights) ■ Aoba Ward Office, Sendai City: Roadside signposts *For more details, please refer to the PDF materials or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe "Compact Ms Pile Foundation" can be constructed using a pile driving machine, resulting in a favorable working environment. Compared to conventional methods, the area of restoration is minimal. The narrow restoration area allows for a reduction in industrial waste. Additionally, the small pile diameter reduces the impact on buried objects. 【Features】 ■ Construction is possible with a pile driving machine, ensuring a good working environment ■ If there are no buried objects, construction can be carried out from the ground height ■ Compared to conventional methods, the area of restoration is minimal ■ Shorter working time allows for a reduction in construction period ■ Construction can be performed in remote locations due to the use of a pile driving machine *For more details, please refer to the PDF materials or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce examples of the "Multi-Purpose Foundation" construction. Maruhan Corporation is engaged in the construction of "road sign poles," as well as "surveillance camera poles" and "variable speed limit sign poles." Please leave the multi-purpose foundation to us. 【Examples (excerpt)】 ■ NEXCO East Japan (Watari Town): Road sign pole ■ Miyagi Prefectural Road Public Corporation: Illuminated road sign pole ■ UR Urban Development Corporation (Sendai City Hall): Road sign pole ■ Akita River National Highway Office: Road sign pole ■ Miyagi Prefectural Road Public Corporation: Surveillance camera pole *For more details, please refer to the PDF materials or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce examples of the construction of "steel pipe pile foundations for lighting, signal poles, and sign poles." Our company has carried out the installation of "tapered poles" for the Sendai River National Highway Office and the Miyagi Prefectural Road Public Corporation, as well as the installation of "multipurpose poles" for the Hachinohe City Hall. For anything related to steel pipe pile foundations for lighting, signal poles, and sign poles, please leave it to us. 【Examples (excerpt)】 ■ Sendai River National Highway Office: Tapered Pole ■ UR Urban Development Corporation (Sendai City Hall): Multipurpose Pole, Tapered Pole ■ Sakata River National Highway Office: Tapered Pole ■ Miyagi Prefectural Road Public Corporation: Tapered Pole ■ Natori City Land Readjustment Project: Design Pole and others *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe "Steel Pipe Pile Foundation for Lighting, Signal Poles, and Sign Posts" eliminates the need for concrete pouring on-site, allowing for a reduction in construction time. It produces lower noise and vibration compared to conventional methods. Pile lengths can be set according to conditions, from sidewalk lighting poles to sign posts. Additionally, it can be installed in narrow spaces or areas with congested underground utilities. 【Features】 - Reduces construction time as concrete pouring on-site is unnecessary. - Pile lengths can be set according to the N value of the site. - The installation of pile foundations and lighting poles can be carried out in a continuous flow. - Lower noise and vibration compared to conventional methods. - Can be installed in remote locations due to the use of a pole erection vehicle. *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe "MA Foundation Body" can be installed from the ground line, and it is a construction method that requires almost no soil disposal. Since there is no concrete pouring on site, it is easy to shorten the construction period, and installation in narrow spaces is possible. Additionally, the design standards are calculated in accordance with the "Guidelines for Road Bridges by the Japan Road Association and its Commentary." 【Features】 ■ Installation of pile lengths tailored to the site's N value is possible ■ Construction can be carried out in a continuous flow from foundation to pole erection ■ Low noise and low vibration method compared to conventional foundation pile methods ■ Use of general-purpose machinery (pole erection vehicles) eliminates the need for vehicle transportation *For more details, please feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration