Flanged integrated steel pipe piles that can be constructed in a series of processes including foundation and column construction.
The "MA Foundation Body" can be installed from the ground line, and it is a construction method that requires almost no soil disposal. Since there is no concrete pouring on site, it is easy to shorten the construction period, and installation in narrow spaces is possible. Additionally, the design standards are calculated in accordance with the "Guidelines for Road Bridges by the Japan Road Association and its Commentary." 【Features】 ■ Installation of pile lengths tailored to the site's N value is possible ■ Construction can be carried out in a continuous flow from foundation to pole erection ■ Low noise and low vibration method compared to conventional foundation pile methods ■ Use of general-purpose machinery (pole erection vehicles) eliminates the need for vehicle transportation *For more details, please feel free to contact us.
Inquire About This Product
basic information
【Self-Construction Possible Pile Diameter】 ■ The pile sizes range from φ165.2 to φ355.6. * Depending on the performance of the construction vehicle, it is possible to construct up to φ457.2, so please consult us. ■ Generally, φ165.2 is used for sidewalk lighting poles and security lights, while φ190.7 to φ216.3 is used for lighting poles and pedestrian-only poles, etc. ■ Sizes of φ267.4 and above are used for multipurpose poles (signal co-installation poles) and type F sign poles. * For more details, please feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please feel free to contact us.
Company information
Maruhan Corporation, based on the experience cultivated over many years, is engaged in the design of lighting poles associated with urban planning and development projects necessary for reconstruction. Additionally, we have developed the "MA foundation pile" to solve issues such as "buried utilities being congested and preventing the installation of lighting foundations" when carrying out road improvements. We will continue to strive to develop upgraded construction methods based on your feedback and requests, and we appreciate your continued support.