オリエンタル白石 本社

Contact this company
Contact Us OnlineBefore making an inquiry
Download PDF
オリエンタル白石 Company Profile
A technology that exists only here! A future overflowing! Our technology for your future!
Oriental Shiraishi Co., Ltd. is a company primarily engaged in the construction and manufacturing sales of prestressed concrete, as well as the construction of pneumatic caissons and repair and reinforcement construction. We contribute to the development of social infrastructure by utilizing special technologies in a setting that looks towards the great nature, the earth, and the future of cities.
Business Activities
■ Construction and manufacturing sales of prestressed concrete ■ Construction work of pneumatic caissons ■ Repair and reinforcement construction work ■ Design and construction of seismic reinforcement building work ■ Sales of construction materials ■ Solar power generation business and its management, operation, as well as electricity supply and sales
Recommended information
SP clamp method: Replacement method for PC composite girders with precast PC slabs.
Replace the PC composite girder's floor slab with a precast PC floor slab. Quick construction! The reliability of ensuring durability performance will improve!
The "SP Clamp Method" is a construction technique for replacing the deck of a simple PC composite girder bridge using precast PC deck slabs while maintaining the load-bearing capacity of the existing structure. By cutting the existing main girder stirrups and crimping a fixed steel pipe to their ends, the functionality of the stirrups is preserved. Additionally, by extending the stirrups through steel pipe crimping at the cutout sections of the PC deck slab, it is possible to maintain the necessary load-bearing performance against the lateral movement of the main girder web. 【Features】 ■ Enables rapid replacement of the PC composite girder deck without compromising the specified load-bearing performance of the existing main girder, utilizing precast PC deck slabs. ■ The use of wire sawing methods during the removal of the deck from the top of the main girder allows for a reduction in construction time. ■ This method is based on the premise of removing the upper edge rebar of the deck, including the hook section of the main girder stirrups, which are at high risk of corrosion due to the application of anti-freezing agents on the road surface. ■ The reliability of ensuring durability performance is improved. *For more details, please refer to the PDF document or feel free to contact us.
Products/Services (27)
catalog(30)
Survey responses are required to view e-book details. Click to view the e-book.
news(2)
Detailed information
| Company name | オリエンタル白石 本社 |
|---|---|
| number of employees | 724 |
| Contact address | postalcode 135-0061 Tokyo/ Koto-ku/ 5-6-52 Toyosu, NBF Toyosu Canal Front 5FView on map TEL:03-6220-0633 FAX:03-6220-0634 |
| Business Locations | Click here for the list |
| Industry | General contractors and subcontractors |
オリエンタル白石 Building Image

