iPROS Urban Planning
  • Search for products by classification category

    • Building Materials
      Building Materials
      35537items
    • Facilities
      Facilities
      56659items
    • Lighting and Interior
      Lighting and Interior
      17273items
    • Common materials
      Common materials
      37011items
    • Civil Engineering Materials
      Civil Engineering Materials
      9535items
    • Construction, work and methods
      Construction, work and methods
      27653items
    • Surveys, Measurements, and Services
      Surveys, Measurements, and Services
      30352items
    • IT/Software
      IT/Software
      31867items
    • others
      others
      84580items
    • Store and facility supplies
      Store and facility supplies
      4358items
    • Office and commercial supplies
      Office and commercial supplies
      11463items
    • Hospital and welfare facility supplies
      Hospital and welfare facility supplies
      952items
    • Logistics Equipment
      Logistics Equipment
      7378items
    • Energy and Resources
      Energy and Resources
      11606items
  • Search for companies by industry

    • Information and Communications
      7198
    • others
      6981
    • Building materials, supplies and fixtures manufacturers
      6683
    • Service Industry
      4607
    • Trading company/Wholesale
      2996
    • Other construction industries
      2455
    • Electrical equipment construction business
      642
    • Interior Design
      528
    • Facility Design Office
      492
    • Construction Consultant
      464
    • Architectural design office
      361
    • retail
      345
    • Warehousing and transport related industries
      321
    • Electricity, Gas and Water Industry
      290
    • General contractors and subcontractors
      288
    • Interior construction business
      274
    • Medical and Welfare
      272
    • Educational and Research Institutions
      258
    • Building Management
      253
    • Renovation and home construction industry
      224
    • Water supply and drainage construction business
      204
    • Housing manufacturers and construction companies
      187
    • Transportation
      160
    • Real Estate Developers
      155
    • Fisheries, Agriculture and Forestry
      124
    • Structural Design Office
      66
    • Finance, securities and insurance
      35
    • Restaurants and accommodations
      29
    • self-employed
      29
    • Mining
      26
    • Public interest/special/independent administrative agency
      18
    • Police, Fire Department, Self-Defense Forces
      18
    • Store and building owners
      9
    • Property Owner
      8
    • Government
      8
    • Individual
      8
  • Special Features
  • Ranking

    • Overall Products Ranking
    • Overall Company Ranking
Search for Products
  • Search for products by classification category

  • Building Materials
  • Facilities
  • Lighting and Interior
  • Common materials
  • Civil Engineering Materials
  • Construction, work and methods
  • Surveys, Measurements, and Services
  • IT/Software
  • others
  • Store and facility supplies
  • Office and commercial supplies
  • Hospital and welfare facility supplies
  • Logistics Equipment
  • Energy and Resources
Search for Companies
  • Search for companies by industry

  • Information and Communications
  • others
  • Building materials, supplies and fixtures manufacturers
  • Service Industry
  • Trading company/Wholesale
  • Other construction industries
  • Electrical equipment construction business
  • Interior Design
  • Facility Design Office
  • Construction Consultant
  • Architectural design office
  • retail
  • Warehousing and transport related industries
  • Electricity, Gas and Water Industry
  • General contractors and subcontractors
  • Interior construction business
  • Medical and Welfare
  • Educational and Research Institutions
  • Building Management
  • Renovation and home construction industry
  • Water supply and drainage construction business
  • Housing manufacturers and construction companies
  • Transportation
  • Real Estate Developers
  • Fisheries, Agriculture and Forestry
  • Structural Design Office
  • Finance, securities and insurance
  • Restaurants and accommodations
  • self-employed
  • Mining
  • Public interest/special/independent administrative agency
  • Police, Fire Department, Self-Defense Forces
  • Store and building owners
  • Property Owner
  • Government
  • Individual
Special Features
Ranking
  • Overall Products Ranking
  • Overall Company Ranking
  • privacy policy
  • terms of service
  • About Us
  • Careers
  • Advertising
  1. Home
  2. Construction Consultant
  3. イーズ 本社
  4. Product/Service List
Construction Consultant
  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration

イーズ 本社

addressTokyo/Minato-ku/3-3-13 Shinbashi, Tsao Hibiya 3F
phone03-6811-2344
  • Official site
last updated:Jan 12, 2021
イーズlogo
  • Contact this company

    Contact Us Online
  • Company information
  • Products/Services(22)
  • catalog(5)
  • news(16)

イーズ List of Products and Services

  • category

1~22 item / All 22 items

Displayed results

class="retina-image"

Spot bazooka with elephant option for heatstroke measures during deban work.

Refreshing blast of air makes work inside the container comfortable! Cool air can be supplied from various angles.

The "Elephant Option" is an option duct that can supply cool air from various angles and locations. We respond to the demand for improving harsh cargo handling operations. Since it can supply cool air from a high position, it allows for a spacious area inside the container and does not hinder cargo handling operations. 【Features】 ■ Perfectly fits the height of ISO standard containers (internal dimensions 2385mm) ■ Two connection points can accommodate 360 degrees ■ Can blow air from the outside of the building 【Exhibition Announcement】 [Nagoya] 3rd Smart Logistics EXPO Date: October 25 [Wednesday] - 27 [Friday], 2023 Venue: Port Messe Nagoya Booth Location: 23-44 *For more details, please refer to the PDF document or feel free to contact us.

  • Duct related equipment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Guppy Bazooka Large Fan Type

The maximum airflow is 157m³/min! Equivalent airflow to a twin with a single connection.

We offer the "Guppy Bazooka Large Fan Type," which features the highest airflow level in Bazooka history and maximum class capabilities. This product achieves airflow equivalent to nearly two BZ singles with just one unit. Additionally, we also have the "Guppy Bazooka LX Integrated Set," which provides airflow equivalent to a twin with a single connection. Please feel free to contact us if you are interested. 【Features】 ■ Available for lease ■ Rated at 7 horsepower (maximum 9.5 horsepower) ■ Achieves airflow equivalent to nearly two BZ singles with one unit ■ Integrated "Guppy Bazooka LX Integrated Set" also available *For more details, please refer to the PDF document or feel free to contact us.

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Case Study] Shimotsuma City Gymnasium, Ibaraki Prefecture

Introducing the case of installing spot bazookas in all rooms of two gymnasiums in Shimotsuma City, Ibaraki Prefecture.

We would like to introduce the case of the introduction of our product, the "Spot Bazooka," at the municipal comprehensive gymnasium and the municipal Chiyokawa gymnasium in Shimotsuma City, Ibaraki Prefecture. This product was successfully implemented due to its significantly lower installation costs compared to conventional air conditioning systems, the ability to install it in a short period, and the opportunity to utilize subsidies related to virus countermeasures. After the installation was completed, during the first summer, we received joyful feedback from users saying it was "cool." 【Case Overview】 ■Challenges - No air conditioning systems installed for many years - Enormous installation costs ■Results - Joyful feedback from users saying it was "cool" *For more details, please refer to the PDF materials or feel free to contact us.

  • Air conditioning equipment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Heat Stroke Prevention Case Study] Meiji Jingu Gaien Tennis Club

Highly rated by our members! We have introduced an air conditioning unit that excels not only in cooling but also in dehumidifying.

This is an introduction to the case of implementing the "Spot Bazooka" at the Meiji Jingu Gaien Tennis Club. Due to the steel frame membrane roof structure, it was difficult to add air conditioning units, and despite various efforts, the indoor temperature reached nearly 40°C on extremely hot days, leading to ongoing struggles with safety management and labor management. After introducing our product, we have achieved the expected cooling effect, and we have received high praise from our members. In fact, on September 23 at 1:00 PM, the outdoor temperature was 32.2°C while the indoor temperature was 24.8°C, showing a drop of about 7°C compared to the outside air. [Implementation Overview] ■ Location: Indoor court of Meiji Jingu Gaien Tennis Club - Area: 4,531 m² - Ceiling height: 10.6 m ■ Product implemented: Gup Pi Bazooka Single Type, 10 units (rated 4 horsepower, maximum 7 horsepower) *For more details, please refer to the PDF document or feel free to contact us.

  • Cooling system

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Heat Stroke Prevention Case Study] Matsue Elementary School, Kasamatsu Town, Hatorigun, Gifu Prefecture

Introducing a case study on the implementation of "Spot Bazooka" due to its short installation period and cost-effectiveness!

This is an introduction to the case of introducing "Spot Bazooka" at Matsue Elementary School in Kasamatsu Town, Hatorigun, Gifu Prefecture. The gymnasiums of two elementary schools in the town still lack air conditioning, and in light of the incidents of heatstroke among children occurring nationwide, we have been considering measures to prevent heatstroke in the gymnasiums. With the added challenge of summer classes during the COVID-19 pandemic, we decided to implement a solution as soon as possible. As a result, we arrived at the "Spot Bazooka," which was suitable in terms of overwhelming airflow, safety, installation space, and cost. After confirming the installation site and conducting a demonstration, we were able to verify its effectiveness, leading to its adoption by both schools. Since the introduction, it has been used not only by the school but also for community sports activities through school openings, and we have received feedback that activities have become more comfortable. [Overview] ■ Installation Location: Matsue Elementary School, Kasamatsu Town, Hatorigun, Gifu Prefecture ■ Number of Units Installed: 6 units of Spot Bazooka Single Type ■ Installation Date: May 2020 *For more details, please refer to the PDF document or feel free to contact us.

  • Air conditioning
  • Air conditioning equipment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Heatstroke Prevention Measures Case Study] Vaccination Concentration Site

A pleasant space with cool air flowing! A case study introducing the integrated "Spot Bazooka" that requires almost no construction.

This is an introduction to the case of introducing "Spot Bazooka" at the concentrated vaccination site in Ayagawa Town, Kagawa Prefecture. The gymnasium was suddenly designated as a vaccination site, but since air conditioning was not installed, measures against heatstroke and high temperatures were necessary during vaccinations in the summer. Therefore, eight integrated "Spot Bazooka" units, which require almost no construction, were introduced. They were delivered in June during the rainy season, and during the trial operation, a refreshing cool breeze with reduced humidity was emitted, which seemed to satisfy the town mayor and the townspeople. 【Overview】 ■ Installation location: Concentrated vaccination site in Ayagawa Town, Kagawa Prefecture ■ Installed product: Eight integrated "Spot Bazooka" units *For more details, please refer to the PDF document or feel free to contact us.

  • Air conditioning
  • Air conditioning equipment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[For Heatstroke Prevention!] High Airflow Spot Air Conditioner 'Spot Bazooka EX'

Equipped with a heat exchanger equivalent to a maximum of 8.5 horsepower for a work environment with extreme heat around 40℃. It sends in cold air at an intake temperature of -16℃ and effectively dehumidifies. Leasing options are also available.

The "Spot Bazooka EX" is a spot air conditioner that delivers highly directional cold air, efficiently cooling the targeted area. With its powerful cooling capability, it can blow out air at an intake temperature of -16°C and is capable of dehumidifying at a rate of 9.04L/h. (Note 1) It is suitable for improving the environment in high-temperature workplaces such as kitchens, welding sites, and glass workshops. Additionally, it requires minimal maintenance due to the absence of filters, and the openings can be washed with water. It can be installed in various locations as it does not require installation and can be used with a three-phase 200V power supply. 【Features】 ■ Cooling for large facilities with high ceilings such as logistics warehouses and gymnasiums, partially open workspaces, and event venues ■ Available in two types: integrated outdoor unit and separate unit ■ Usable for heating purposes as well ■ Easy to install without the need for construction *For more details about the product, please refer to the catalog available for "PDF Download." You can also view case studies of series products.

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Heat Stroke Prevention Case Study] Kasamatsu Town Matsue Elementary School

Introduced as a measure against heatstroke in summer! A case where the decision to implement was made due to the short installation period and cost-effectiveness.

We would like to introduce the case of Matsue Elementary School in Kasamatsu Town, which implemented measures against heatstroke for classes and club activities. There are three elementary schools and one junior high school in the town, and air conditioning facilities in classrooms were established early on. However, two of the elementary schools did not have air conditioning in their gymnasiums. As a solution, we arrived at the 'Spot Bazooka,' which was suitable in terms of overwhelming airflow, safety, installation space, and cost. After confirming the installation site and conducting a demonstration, we verified its effectiveness and implemented it in both schools. As a result, it has been used not only by the schools but also for community sports activities through school openings, and we have received feedback that activities can now be conducted comfortably. [Implementation Overview] ■ Location: Matsue Elementary School, Kasamatsu Town, Hatori District, Gifu Prefecture ■ Number of units installed: 6 single-type Spot Bazookas ■ Implementation period: May 2020 *For more details, please refer to the PDF document or feel free to contact us.

  • Air conditioning
  • Air conditioning equipment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Heat Stroke Prevention Case Study] Chikushi Jogakuen University

For gymnasiums where regular air conditioning installation is not possible, "Spot Bazooka" is the solution! Introduction of case studies.

Here is an introduction to the case of Chikushi Jogakuen University, which implemented measures against heatstroke for classes and club activities. Due to the aging of the gymnasium, the university had previously been unable to install conventional air conditioning. However, with the installation of "Spot Bazooka," students can now participate in physical education classes and club activities without worrying about heatstroke, creating a comfortable environment. Additionally, a safety net has been installed as a precaution, ensuring safe use by preventing fingers from getting caught. The drainage of condensate water is managed with a tank. 【Overview of Implementation】 ■ Location: Chikushi Jogakuen University, Fukuoka Prefecture ■ Number of Units Installed: 4 integrated units ■ Installation Date: July 2020 *For more details, please refer to the PDF document or feel free to contact us.

  • Air conditioning
  • Air conditioning equipment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Heat Stroke Prevention Case Study] Hyogo Prefecture, Pharmaceutical Manufacturing Plant

Decision to add more units! A case that received great acclaim for having such a large airflow spot air conditioner.

At a pharmaceutical manufacturing plant in Hyogo Prefecture, during the summer before the introduction of the "Spot Bazooka," the temperature inside the semi-open factory exceeded 35 degrees Celsius, making work very difficult. Therefore, this product was introduced. Since liquids are handled, the humidity inside the factory was also high, creating a harsh environment with a high risk of heatstroke. However, after the introduction, workers were able to feel dry, cool air in the work area, and it has received very positive feedback from the employees. [Introduction Overview] ■ Location: Pharmaceutical manufacturing plant in Hyogo Prefecture ■ Number of Spot Bazookas installed - Single type: 11 units - Twin type: 2 units - Integrated type: 1 unit ■ Introduction period: 2017 *For more details, please refer to the PDF document or feel free to contact us.

  • Air conditioning
  • Air conditioning equipment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Heat Stroke Prevention Case Study] Sumitomo Heavy Industries Modern, Ltd.

We will introduce a case where the high-altitude work site, which had a harsh environment due to extreme heat, was resolved using a spot bazooka!

At Sumitomo Heavy Industries Modern Co., Ltd., a factory that manufactures large machines of various sizes and shapes, the indoor environment is air-conditioned, but the building's height is very tall. During the summer, when assembling large machines, the temperature in high-altitude work areas is high, necessitating improvements in the working environment. Upon learning that EASE offers a rental of demo units for the "Spot Bazooka Integration Set," we consulted with them. We connected a duct to change the blowing direction of the demo unit and confirmed its effectiveness. When we directed the airflow at an upward angle to the high-altitude work area, we confirmed that cold air reached the area, leading us to decide to implement it. [Implementation Overview] ■ Client: Sumitomo Heavy Industries Modern Co., Ltd. (Futtsu City, Chiba Prefecture) ■ Products Introduced: Four "Spot Bazooka Integration Sets" (350φ reducer + flexible duct) *For more details, please refer to the PDF document or feel free to contact us.

  • Air conditioning
  • Air conditioning equipment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Heat Stroke Prevention Case Study] Saitama Prefectural Disaster Prevention Aviation Center

After implementation, it has received great acclaim for enabling comfortable and agile activities! Here is an introduction to a case where it was introduced as a heatstroke prevention measure during the intense training of team members.

This is an introduction to a case study implemented at the Saitama Prefectural Disaster Prevention Aviation Center. The Saitama Prefectural Disaster Prevention Aviation Team conducts aerial firefighting, fire suppression activities from helicopters, and rescue and emergency activities. This time, a "Spot Bazooka" was introduced as a heatstroke prevention measure during the team members' intense training. Until now, training inside the helicopter hangar was conducted in a very harsh environment due to the lack of air conditioning, but after the introduction, it has received great acclaim from the team members for allowing them to operate comfortably and efficiently. [Overview] ■ Issues - Training inside the helicopter hangar was conducted in a very harsh environment due to the lack of air conditioning. ■ Effects - After the introduction, it has received great acclaim from the team members for allowing them to operate comfortably and efficiently. *For more details, please refer to the PDF document or feel free to contact us.

  • Air conditioning

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Heat Stroke Prevention Case Study] Home Logistics Co., Ltd.

Since there are no vinyl ducts, it won't interfere with the work! Introduction of a case where approximately 117 units were installed in 7 locations.

The warehouse of Home Logistics Co., Ltd. has a floor height of just under 10 meters, and cooling the entire building would incur tremendous costs. However, if left unattended, the environment can exceed 35°C in the peak summer, posing a constant risk of heatstroke. Therefore, we introduced the air conditioner 'Guppy Bazooka,' which is used in agricultural greenhouses. It delivers powerful cool air up to 50 meters away with its large airflow and static pressure (the force that pushes air). We started by trying one unit, and it indeed delivered cool air up to 50 meters away. Next, we purchased four more units, and the workers rated it as "excellent." As a result, approximately 117 units were installed in seven distribution centers (logistics warehouses) across various regions of Home Logistics. [Implementation Overview] ■ Challenges - Cooling the entire warehouse would incur tremendous costs. - The environment can exceed 35°C in the peak summer if left unattended. ■ Effects - Powerful cool air reaches up to 50 meters away with large airflow and static pressure (the force that pushes air). - There are no vinyl ducts, so it does not interfere with work. *For more details, please refer to the PDF document or feel free to contact us.

  • Air conditioning

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Heat Stroke Prevention Case Study] Bunkyo Gakuin University Girls' Junior and Senior High School

It was found that it can be implemented at a cost of less than one-fifth of the conventional equipment costs, and the decision to implement it was made!

Among the three gymnasiums in total, the main gymnasium of the academic building, which did not have air conditioning installed, had previously considered the introduction of air conditioning equipment. However, due to the excessively high costs, the introduction plan had been put on hold. Upon learning about our products, they decided to reconsider the installation. In the case of the "Spot Bazooka," it was found that it could be installed for less than one-fifth of the cost of conventional equipment, leading to the decision to proceed with the installation. As a result, during the summer before installation, the temperature inside the gymnasium exceeded 30 degrees Celsius, making classes and club activities difficult due to the heat. However, after installation, the environment became very cool and comfortable. Additionally, since this gymnasium is located underground, the humidity was relatively high. The installation not only lowered the temperature but also reduced humidity, which seems to enhance the feeling of coolness. [Case Overview] ■ Installed Equipment: Gupii Bazooka Single Type, 4 units ■ Capacity: Maximum 7 horsepower (28 horsepower for 4 units) ■ External Dimensions and Weight - Indoor Unit: Height 920 x Width 950 x Depth 330 mm, 52 kg - Outdoor Unit: Height 1350 x Width 950 x Depth 330 mm, 90 kg *For more details, please refer to the PDF document or feel free to contact us.

  • Air conditioning

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Heat Stroke Prevention Case Study] Koshigaya Chemical Industry Co., Ltd.

The indoor unit uses a casing equivalent to the outdoor unit, allowing for outdoor installation! Introduction of case studies for the Spot Bazooka.

Koshigaya Kasei Kogyo Co., Ltd. faced challenges with heatstroke prevention for employees every year, as temperatures in the factory exceeded 35 degrees Celsius during the summer. However, they found the powerful spot air conditioner "Spot Bazooka" on their website. In mid-July 2018, they borrowed a demo unit for one week and tested it in the extreme heat of the factory. The cool, dry air reached far and was very well received by the employees, leading to the decision to implement it. By attaching a flexible duct of the same size as the indoor unit's blower, duct resistance was reduced, allowing a large volume of cool air to be supplied throughout the factory, and the direction of the airflow could be easily adjusted. [Implementation Overview] ■ Challenges - Temperatures in the factory exceeded 35 degrees Celsius during the summer, causing annual concerns about employee heatstroke prevention. ■ Effects - The cool, dry air reached far and was very well received by the employees. *For more details, please refer to the PDF document or feel free to contact us.

  • Air conditioning

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Heat Stroke Prevention Case Study] 19 Public Elementary and Junior High School Gymnasiums in Nakano Ward, Tokyo

Evaluation that 'it was good to be able to install it quickly!' Introduction of cases where it has been implemented mainly in elementary and junior high schools.

In Nakano Ward, we have introduced spot coolers, focusing on elementary and junior high schools that are planned for renovation in the future. Due to budget constraints, we have implemented a limit of three units per school, but the schools that have actually used them have expressed their satisfaction, saying "it's very cool." Since this is a lease introduction, the period from planning to installation for the spot coolers is short (possible within a year), and the representatives from Nakano Ward have also evaluated it positively, stating "it was good that we could install it quickly." Additionally, the indoor and outdoor units are compact, making relocation easy. In Nakano Ward, they plan to relocate the units before the start of renovation work on the elementary and junior high schools to make effective use of the leased equipment. 【Introduction Overview】 ■ Nakano Ward Saginomiya Elementary School Gymnasium Indoor Unit ■ Nakano Ward Saginomiya Elementary School Gymnasium Outdoor Unit ■ Nakano Ward Eighth Junior High School Gymnasium Indoor Unit ■ Nakano Ward Eighth Junior High School Gymnasium Outdoor Unit *For more details, please refer to the PDF document or feel free to contact us.

  • Air conditioning

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Heat Stroke Prevention Case Study] Shinkokugyo Co., Ltd.

Cooling only the workspace! Introduction of a case study that significantly reduced air conditioning installation costs.

Shinchu Kogyo has been considering measures against heatstroke at their automobile maintenance facility for some time. During their consideration of air conditioning systems due to the relocation of their headquarters, they learned about the existence of the Spot Bazooka at an exhibition. They found that the Spot Bazooka blows cool air only to the work area (where needed), significantly reducing initial costs compared to installing a conventional air conditioner. Furthermore, due to the nature of the maintenance facility, dust is stirred up. The Spot Bazooka's environmental resistance, allowing it to be used outdoors while being easy to maintain, was a decisive factor in its adoption. [After Implementation] - Initial costs significantly reduced - Environmental resistance for outdoor use - Easy maintenance - The cooling air reached over 10 meters even in the semi-open maintenance facility where outside air enters, allowing workers to perform maintenance comfortably - Work efficiency also improved *For more details, please refer to the PDF document or feel free to contact us.

  • Air conditioning

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Heat Stroke Prevention Case Study] Vehicle Maintenance Facility

The key point is that the air conditioning's cooling airflow reaches far with a large volume of air! Introduction of case studies from vehicle maintenance facilities.

This is an introduction to a case study implemented at a vehicle maintenance facility. The work inside the vehicle maintenance facility was conducted without air conditioning, but due to the increasingly severe heat during summer years, we were considering measures against heatstroke. As a solution, we installed one integrated spot bazooka in the vehicle maintenance lane, which is the main work flow, and two additional integrated spot bazookas on the opposite side. We considered various products, but after experiencing the actual machine at an exhibition, we decided on the spot bazooka from Ease. The deciding factor was its high air volume, which allowed the air conditioning's cooling breeze to reach far away. After installation, the dehumidified dry air reached us, drying our sweat and creating a comfortable environment. [Implementation Overview] ■ Installation Location: Koto Ward, Tokyo, Vehicle Maintenance Facility ■ Number of Units Installed: 7 Integrated Spot Bazookas ■ Installation Date: July 2020 *For more details, please refer to the PDF document or feel free to contact us.

  • Air conditioning

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Heat Stroke Prevention Case Study] Hanwa Co., Ltd.

Introducing a case study of the Spot Bazooka, which can blow cool air about 20 meters even inside semi-open buildings!

At the factory of Sanko Kōzai Co., Ltd., we have been working on heat countermeasures through the installation of fans, provision of cooling vests, and taking breaks during work when the WBGT warning temperature is reached. However, with the aim of further improving the workplace environment and ensuring the safety of our workers, we have decided to implement more advanced measures across all sites. We are introducing our highly efficient air conditioning units at our locations nationwide. In selecting the air conditioning units, the 'Spot Bazooka,' which can blow cool air approximately 20 meters even in semi-open buildings, emerged as a strong candidate. This decision was made based on performance verification through demo units and confirmation of implementation results in the market. [Implementation Overview] ■ A total of 99 Spot Bazookas have been installed at 20 locations nationwide (18 sales offices, including group companies, and 2 factories) as of the end of 2020. * Breakdown: 15 integrated units, 84 separate units (single type) * For more details, please refer to the PDF document or feel free to contact us.

  • Air conditioning

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

House cultivation heat recovery dehumidification ventilation system "Doctor Dry"

Ventilation and dehumidification for autumn, winter, and spring! A dehumidifying ventilation system that eliminates humidity and condensation in the house.

"Doctor Dry" is a heat recovery ventilation system for greenhouse cultivation that contributes to dehumidification at night and promotes photosynthesis during the day. It adopts an energy-saving method that allows for dehumidification while ventilating. It exhausts humid air and supplies dry air, while also preventing heat from escaping indoors. By resolving high humidity and condensation in the greenhouse, it reduces mold and diseases, keeping your valuable crops healthy and improving their quality. 【Features】 ■ Prevents diseases caused by high humidity ■ Maintains stable temperatures inside the greenhouse ■ Can be used to promote photosynthesis ■ Easy to install ■ Vertical outdoor installation type *For more details, please refer to the PDF document or feel free to contact us.

  • Air conditioning equipment
  • Ventilation system
  • Ventilation and smoke exhaust equipment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Greenhouse cultivation heat pump air conditioning "Guppy Bazooka"

A thoughtfully designed compact model for farmers! Selectable based on the scale of the house and the crops.

The "Guppy Bazooka" is a heat pump air conditioning system for greenhouse cultivation that allows duct connection and does not require a circulation fan. We offer a high-end model specifically designed for greenhouse cultivation, the "Twin Type," and a "Single Type" that fits perfectly in small greenhouses. It comes standard with a multifunction wired remote control and utilizes the outdoor unit's body, making it resistant to water and direct sunlight, and highly durable. 【Features】 ■ Filterless ■ Washable ■ Excellent weather resistance ■ Duct connection possible ■ No circulation fan required *For more details, please refer to the PDF materials or feel free to contact us.

  • Air conditioning equipment
  • Heating and cooling equipment and facilities
  • Heat exchanger

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

High Airflow Spot Air Conditioner "Spot Bazooka"

Powerful spot air conditioners to solve heatstroke measures in large-scale work sites!

The "Spot Bazooka" is a high-capacity spot air conditioner that delivers a refreshing, large volume of cold air over long distances, even as sweat dries. With its directional airflow, it reaches the intended target, and maintenance is easy since there is no filter. We offer two types: an integrated model and a separate indoor and outdoor unit. 【Features】 ■ Large cold air reaches far (measured at 50m) ■ No filter, making maintenance easy ■ Ideal for spot cooling in large facilities with high ceilings or semi-open spaces ■ Leasing options available ■ Separate placement of indoor and outdoor units is also possible *For more details, please download the PDF or feel free to contact us.

  • Air conditioning

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
Prev 1 Next
  • イプロスがリアル展示会を主催します! AI/DX 営業・マーケティング展 出展社募集中 リード数・商談数が止まらない!新しいリアル展示会を提供 会期 2026年3月24日(火)~25日(水) 会場 東京ビッグサイト東4ホール 出展概要資料を進呈!
    • Contact this company

      Contact Us Online

    Products

    • Search for Products

    Company

    • Search for Companies

    Special Features

    • Special Features

    Ranking

    • Overall Products Ranking
    • Overall Company Ranking

    support

    • site map
    IPROS
    • privacy policy Regarding external transmission of information
    • terms of service
    • About Us
    • Careers
    • Advertising
    COPYRIGHT © 2001-2025 IPROS CORPORATION ALL RIGHTS RESERVED.
    Please note that the English text on this page is automatically translated and may contain inaccuracies.