スパイダー工法協会

Contact this company
Contact Us Online
スパイダー工法協会 Company Profile
With a motto of higher safety, superior workability, and more reliable quality, the Spider Method will continue to grow.
The Spider Method Association proposes a new form of temporary bridge construction called the "Spider Method." In conventional methods, when constructing or dismantling a temporary bridge, it was necessary to install scaffolding on the supporting piles, which required an enormous amount of effort. Additionally, the risk of falling accidents was very high, making the work unsafe. With the Spider Method, there are no restrictions on the movement of the gondola, allowing workers to move safely in any direction—up, down, left, or right—using a remote control, regardless of the presence of a press or other equipment. Furthermore, the installation and removal of the Spider gondola can be done easily. Thus, due to its high workability and safety, it also enables a reduction in construction time and costs.

Business Activities
Proposal for the construction method of temporary piers "Spider Method"
Products/Services (1)
catalog(1)
Survey responses are required to view e-book details. Click to view the e-book.
Detailed information
Company name | スパイダー工法協会 |
---|---|
Contact address | postalcode 550-0004 Osaka/ Nishi-ku, Osaka-shi/ 1-14-15 UjibontchoView on map TEL:0120-932-798 FAX:0120-747-353 |
Industry | General contractors and subcontractors |
