iPROS Urban Planning
  • Search for products by classification category

    • Building Materials
      Building Materials
      35536items
    • Facilities
      Facilities
      56658items
    • Lighting and Interior
      Lighting and Interior
      17273items
    • Common materials
      Common materials
      37010items
    • Civil Engineering Materials
      Civil Engineering Materials
      9535items
    • Construction, work and methods
      Construction, work and methods
      27653items
    • Surveys, Measurements, and Services
      Surveys, Measurements, and Services
      30352items
    • IT/Software
      IT/Software
      31890items
    • others
      others
      84581items
    • Store and facility supplies
      Store and facility supplies
      4358items
    • Office and commercial supplies
      Office and commercial supplies
      11463items
    • Hospital and welfare facility supplies
      Hospital and welfare facility supplies
      952items
    • Logistics Equipment
      Logistics Equipment
      7378items
    • Energy and Resources
      Energy and Resources
      11606items
  • Search for companies by industry

    • Information and Communications
      7198
    • others
      6981
    • Building materials, supplies and fixtures manufacturers
      6683
    • Service Industry
      4607
    • Trading company/Wholesale
      2996
    • Other construction industries
      2455
    • Electrical equipment construction business
      642
    • Interior Design
      528
    • Facility Design Office
      492
    • Construction Consultant
      464
    • Architectural design office
      361
    • retail
      345
    • Warehousing and transport related industries
      321
    • Electricity, Gas and Water Industry
      290
    • General contractors and subcontractors
      288
    • Interior construction business
      274
    • Medical and Welfare
      272
    • Educational and Research Institutions
      258
    • Building Management
      253
    • Renovation and home construction industry
      224
    • Water supply and drainage construction business
      204
    • Housing manufacturers and construction companies
      187
    • Transportation
      160
    • Real Estate Developers
      155
    • Fisheries, Agriculture and Forestry
      124
    • Structural Design Office
      66
    • Finance, securities and insurance
      35
    • Restaurants and accommodations
      29
    • self-employed
      29
    • Mining
      26
    • Public interest/special/independent administrative agency
      18
    • Police, Fire Department, Self-Defense Forces
      18
    • Store and building owners
      9
    • Property Owner
      8
    • Government
      8
    • Individual
      8
  • Special Features
  • Ranking

    • Overall Products Ranking
    • Overall Company Ranking
Search for Products
  • Search for products by classification category

  • Building Materials
  • Facilities
  • Lighting and Interior
  • Common materials
  • Civil Engineering Materials
  • Construction, work and methods
  • Surveys, Measurements, and Services
  • IT/Software
  • others
  • Store and facility supplies
  • Office and commercial supplies
  • Hospital and welfare facility supplies
  • Logistics Equipment
  • Energy and Resources
Search for Companies
  • Search for companies by industry

  • Information and Communications
  • others
  • Building materials, supplies and fixtures manufacturers
  • Service Industry
  • Trading company/Wholesale
  • Other construction industries
  • Electrical equipment construction business
  • Interior Design
  • Facility Design Office
  • Construction Consultant
  • Architectural design office
  • retail
  • Warehousing and transport related industries
  • Electricity, Gas and Water Industry
  • General contractors and subcontractors
  • Interior construction business
  • Medical and Welfare
  • Educational and Research Institutions
  • Building Management
  • Renovation and home construction industry
  • Water supply and drainage construction business
  • Housing manufacturers and construction companies
  • Transportation
  • Real Estate Developers
  • Fisheries, Agriculture and Forestry
  • Structural Design Office
  • Finance, securities and insurance
  • Restaurants and accommodations
  • self-employed
  • Mining
  • Public interest/special/independent administrative agency
  • Police, Fire Department, Self-Defense Forces
  • Store and building owners
  • Property Owner
  • Government
  • Individual
Special Features
Ranking
  • Overall Products Ranking
  • Overall Company Ranking
  • privacy policy
  • terms of service
  • About Us
  • Careers
  • Advertising
  1. Home
  2. Other construction industries
  3. タニガキ建工 紀の川営業所
  4. Product/Service List
Other construction industries
  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration

タニガキ建工 紀の川営業所

addressWakayama/Kinokawa-shi/433 Kishimiya, Kishigawa Town
phone0736-64-8989
  • Official site
last updated:Oct 25, 2022
タニガキ建工logo
  • Contact this company

    Contact Us Online
  • Company information
  • Products/Services(10)
  • catalog(12)
  • news(1)

タニガキ建工 List of Products and Services

  • category

1~10 item / All 10 items

Displayed results

class="retina-image"

"Spider Drilling Method" Crane Type

No need for temporary scaffolding! Even when multiple projects overlap, significantly reduce construction days and costs! *Case study introduction*

The "Spider Drilling Method" uses extremely small and lightweight drilling machines, allowing for the construction of rebar insertion work while reducing temporary construction. Since a crane type does not require temporary scaffolding, it can be removed immediately after rebar insertion. It is effective when multiple types of work overlap, such as reverse construction. Additionally, it demonstrates its strength when there are restrictions on traffic regulation or usage time at the base of slopes. It shortens the lead time between different types of work, significantly reducing construction costs and days. 【Features】 - No temporary scaffolding required. Minimal temporary construction is acceptable. - Effective when multiple construction works are congested. - Suitable for slope work and measures against landslides on steep slopes. *For more details, please refer to the materials. Feel free to contact us with any inquiries.

  • Civil Engineering Method
  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

"Spider Drilling Method" Crane Type *Construction Case Introduction!

No need for temporary scaffolding! Even when multiple projects overlap, significantly reduce construction days and costs. *We will be exhibiting at the construction materials fair!

The "Spider Drilling Method" uses extremely small and lightweight drilling machines, allowing for the construction of rebar insertion work while reducing temporary construction. Since a crane type does not require temporary scaffolding, it can be removed immediately after rebar insertion. It is effective when multiple types of work overlap, such as reverse construction. Additionally, it demonstrates its strength when there are restrictions on traffic regulations or usage time at the base of slopes. It can significantly reduce lead time between different types of work, as well as construction costs and duration. 【Features】 ■ No temporary scaffolding required. Minimal temporary construction is sufficient. ■ Effective when multiple construction works are congested. ■ Suitable for slope work and measures against landslides in steep areas. *For more details, please refer to the materials. Feel free to contact us with any inquiries.

  • Civil Engineering Method
  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction Case: Mast Drilling System

Excellent workability and shortened construction period! Case study of road construction using air rotary method.

This document presents a case study of the "Mast Drilling System" by Tanigaki Construction Co., Ltd., which is engaged in consulting services, landslide countermeasures, and slope disaster prevention projects. The construction ordered for a large-diameter boring machine was carried out using the air rotary method. As a result, we were able to reduce scaffolding work by 680 cubic meters and shorten the construction period by 51 days. By not using muddy water, we completed the project without generating industrial waste. After completion, the main contractor received additional points for their construction performance due to the active use of the new method developed in the prefecture. Due to the positive feedback, we were selected for continued work in the following year. 【Overview】 ■ Project Name: Heisei 24 Fiscal Year Wide Area No. 1-22 Nishi-Hata Road Construction in the Left Bank Area of the Kinokawa River ■ Client: Wakayama Prefecture Ito Promotion Bureau Construction Department ■ Construction Location: Nishi-Hata, Hashimoto City, Wakayama Prefecture ■ Construction Period: August 13, 2013 – February 14, 2014 ■ Construction Details: Steel pipe piles φ508.0mm Excavation length 18.5m – 22.0m, 24 pieces *For more details, please refer to the catalog or feel free to contact us.

  • Special Construction Method
  • Systems Architecture
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Remicon Blow System

Effective with a small amount of application in narrow spaces or during disasters! Compact and high-performance mortar spray.

The "Remicon Blow System" is a compact and high-performance mortar spraying system that is effective for small-scale applications in narrow or emergency situations. Instead of mixing mortar on-site, it is produced at a ready-mixed concrete plant and delivered using mixer trucks. This allows for a reduction in the space required for material placement while increasing the flexibility of placement, and it enables easy and reliable quality control of mortar production. 【Features】 ■ Factory-produced sprayed mortar ■ Stable quality of mortar ■ Suppression of noise, dust, and wastewater generation ■ Minimal equipment usage, reducing occupied area ■ Ability to use high-strength mortar *For more details, please refer to the catalog or feel free to contact us.

  • Mortar and plaster materials
  • Plastering and painting work
  • Cement mortar coating

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Mast drilling system * Introducing construction examples

Environmentally friendly large-diameter boring method effective for steel pipe pile construction and temporary work in narrow spaces.

The "Mast Drilling System" is a large-diameter boring method consisting of a rotary drilling machine (mast drilling machine) installed on an auxiliary mast and a crane (mast drilling crane) that suspends the drilling tools. By supporting the load of the crane with the auxiliary mast, the system reduces the crane's load, enabling either miniaturization of the crane or expansion of the working radius. A significant feature is the ability to freely attach and detach the crane and auxiliary mast. The construction method involves selecting the appropriate system from three drilling methods (air rotary method, down-the-hole hammer method, mud rotary method) based on site conditions. It addresses various challenges faced in conventional large-diameter boring projects, such as the desire to minimize the working space and reduce environmental impacts like noise, vibration, and dust. 【Features】 ■ The crane and auxiliary mast can be freely attached and detached ■ No noise or vibration is produced ■ No industrial waste is generated ■ Dust generation is minimized ■ The working space is small *For more details, please refer to the catalog or feel free to contact us.

  • Systems Architecture
  • Civil Engineering Method
  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Spider Drilling Method, No Scaffolding Type

Recommended for steep slopes and high-altitude work! Scaffold-free spider drilling method.

The "Spider Drilling Method - No Scaffolding Type" is a recommended method for performing rebar insertion work under special conditions where market unit prices cannot be applied. It is particularly effective for long slopes where temporary scaffolding would become large, and for work at extremely high altitudes. It is ideal for sites where temporary scaffolding cannot be installed due to obstacles at the bottom of the slope, such as slope protection on steep terrain. Additionally, it can reduce construction costs and construction days with minimal temporary work. 【Features】 ■ Optimal for long slopes and high-altitude work ■ Ideal when scaffolding cannot be installed due to obstacles at the bottom of the slope ■ Reduces the required construction space ■ Minimizes construction costs and days with minimal temporary work *For more details, please refer to the catalog or feel free to contact us.

  • Civil Engineering Method
  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Spider Drilling Method

Reduce the construction period and costs for rebar insertion work! We can accommodate double pipe drilling without the need for scaffolding.

The "Spider Drilling Method" is recommended for carrying out rebar insertion work under special conditions where market prices cannot be applied. Considering the site conditions, the optimal work type is selected from three options: "scaffold type," "no scaffold type," and "crane type." Additionally, depending on the conditions of the ground being worked on, either "single pipe drilling" or "double pipe drilling" methods can be chosen, allowing for adaptation to unstable ground conditions. 【Features】 ■ Choose from scaffold type, no scaffold type, and crane type ■ Optimal for special conditions ■ Can reduce construction space ■ Reduces construction costs and duration with minimal temporary works ■ Shortens the construction period and costs for rebar insertion work *For more details, please refer to the catalog or feel free to contact us.

  • Civil Engineering Method
  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Safety Climber Method

Introduction of construction methods for safely excavating dangerous heights and steep slopes, as well as shaping embankments.

The "Safety Climber Method" is a construction technique that uses a drilling machine called "Kenfighter" to excavate and shape high places and steep slopes. The machine maintains balance by suspending wires and is operated remotely via wireless control, ensuring the safety of the workers during operation. Using a remote-controlled unmanned drilling machine, the operator can safely control it from a distance. Additionally, since it is suspended by wires, there is no risk of falling hazards even if the ground beneath it collapses. 【Features】 ■ Safe remote operation from a distance ■ Safe and speedy demolition of sprayed mortar ■ No need for access roads or heavy machinery scaffolding ■ Unique wire installation method allows for free movement up, down, left, and right ■ Safe even if the ground beneath it collapses due to being suspended by wires *For more details, please refer to the catalog or feel free to contact us.

  • Civil Engineering Method
  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Non-protruding rock bolt head anchoring component [flat cap]

If you are going to carry out rebar insertion work, pay attention to the head!

Until now, rock bolts required a 10 cm anchorage length above the ground surface, and this part was covered with a protective cap, causing a significant protrusion above the ground. However, the new rock bolts will eliminate this protrusion by flattening the head anchorage material. Additionally, the protective caps that have been used until now were filled with anti-corrosion oil, posing a risk of oil leakage. The flat cap does not use anti-corrosion oil, making it safe to use even near rivers and dams. 【Advantages (Features)】 ■ The landscape of the reinforced slope looks neat ■ It does not break even when hit by falling rocks ■ It does not obstruct the passage of pedestrians or vehicles ■ There is no concern about oil leakage ■ Cost-effective *For more details, please download the catalog below.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Mast Drilling System Air Rotary Method Construction Case Studies

Introduction of construction examples of the environmentally friendly large-diameter drilling method "Mast Drilling System."

We would like to introduce examples of the environmentally friendly large-diameter drilling method, the "Mast Drilling System." The "Mast Drilling System" features characteristics such as "no industrial waste generation," "no noise or vibration," and "no dust generation." The "Mast Drilling System" was registered in 2008 in Wakayama Prefecture as "Kensanpin." 【Case Examples】 ○ Construction Location: Kishu Town, Wakayama Prefecture → There are challenges such as the inability to use mud water for drilling within the river. ○ Construction Location: Nogami Town, Wakayama Prefecture → There are challenges such as the need to reduce the impact of noise and vibration due to proximity to residential areas. For more details, please contact us or download the catalog.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
Prev 1 Next
  • イプロスがリアル展示会を主催します! AI/DX 営業・マーケティング展 出展社募集中 リード数・商談数が止まらない!新しいリアル展示会を提供 会期 2026年3月24日(火)~25日(水) 会場 東京ビッグサイト東4ホール 出展概要資料を進呈!
    • Contact this company

      Contact Us Online

    Products

    • Search for Products

    Company

    • Search for Companies

    Special Features

    • Special Features

    Ranking

    • Overall Products Ranking
    • Overall Company Ranking

    support

    • site map
    IPROS
    • privacy policy Regarding external transmission of information
    • terms of service
    • About Us
    • Careers
    • Advertising
    COPYRIGHT © 2001-2025 IPROS CORPORATION ALL RIGHTS RESERVED.
    Please note that the English text on this page is automatically translated and may contain inaccuracies.