1~35 item / All 35 items
Displayed results
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationContact this company
Contact Us Online1~35 item / All 35 items
We would like to introduce a case study of the self-parking facility, Yuuken Park. This self-parking lot is designed to fit a non-rectangular site shape. Surveillance cameras and lightning rods have been installed on the outdoor light poles of the rooftop level. Guidance to the elevators ensures pedestrian safety and convenience through stairs and crosswalks. 【Overview】 ■ Completion Date: August 31, 2015 ■ Location: Daito City, Osaka Prefecture ■ Type: 5-story, 6-tier continuous sloping floor type ■ Purpose: For amusement stores ■ Construction Area: 10,170.34 m² ■ Capacity: 408 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a store-attached parking lot that adopts a flat type with a gentle sloping ramp. The ramp has a gentle incline of 12%. The floor is finished with a brush-drawn texture, and the internal steel framework is color-coded according to the levels to match the car stops. 【Overview】 ■ Completion Date: November 30, 2015 ■ Location: Nagoya City, Aichi Prefecture ■ Type: 6 levels, 7 sections, store-attached (individually certified) ■ Purpose: For amusement stores ■ Construction Area: 24,648.89 m² ■ Capacity: 870 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This self-driving multi-story parking lot allows access from the first and second floors. The stairs are equipped with anti-slip measures, and the intermediate and rooftop floors are spacious. Additionally, LED lighting has been adopted for the outdoor lights. 【Overview】 ■ Completion Date: March 31, 2016 ■ Location: Sapporo City, Hokkaido ■ Type: 4-story, 5-tier continuous sloped floor (heavy snow specification) ■ Purpose: For amusement stores ■ Construction Area: 10,218.06 m² ■ Capacity: 459 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This parking lot utilizes the elevation differences of the site, resulting in the entrance and exit to the parking structure being located on the second floor. To ensure pedestrian safety, a crosswalk has been established in front of the entrance to the elevator tower. Additionally, the colors of the columns and the car stops are used to differentiate the floors. 【Overview】 ■ Completion Date: October 31, 2016 ■ Location: Kobe City, Hyogo Prefecture ■ Type: 4-story, 5-tier continuous sloping floor type ■ Purpose: For amusement stores ■ Construction Area: 13,187.08 m² ■ Capacity: 613 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a low-gradient continuous sloping type that utilizes the terrain along the national highway bypass. The exterior walls feature a calm two-tone color, and the stairwell is adorned with aluminum louvers. A staircase leading to the elevator shaft has been installed in the middle section of the rooftop. Additionally, lighting has been installed on the roof of the stairwell. 【Overview】 ■ Completion Date: April 25, 2017 ■ Location: Kurashiki City, Okayama Prefecture ■ Type: 3-story, 4-level continuous sloping type ■ Purpose: For amusement store use ■ Construction Area: 7,175.20 m² ■ Capacity: 352 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationHere are the construction examples of the self-driving multi-story parking lot, Yuuken Park. By using perforated folded plates for the exterior walls, the parking lot has become highly open. The side facing the apartment building has been finished in a chic brown color panel. 【Overview】 ■ Completion Date: March 26, 2015 ■ Location: Tsukuba City, Ibaraki Prefecture ■ Type: 4-story, 5-tier continuous sloped floor ■ Purpose: For residential use ■ Construction Area: 7,390.24 m² ■ Capacity: 332 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. It is finished with a chic color fence that matches the exterior of the apartment building. The doors leading to the external stairs of the elevator shafts on each floor display the floor number. The stairs are treated with non-slip surfaces. Additionally, for safety, an intrusion prevention fence is installed under the structural floor of the first floor. 【Overview】 ■ Completion Date: May 29, 2015 ■ Location: Kasuya District, Fukuoka Prefecture ■ Type: 4-story, 5-tier continuous sloped parking system ■ Purpose: For residential apartments ■ Construction Area: 4,667.58 m² ■ Capacity: 258 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a parking lot exclusively for residents, surrounded by a residential building and a commercial building. To avoid steps on the first floor of the parking lot, a pedestrian ramp was installed. For the lighting on the rooftop level, fixtures that are not visible from the outside were selected and installed at the back of the parking spaces. Additionally, some colors of the urethane-coated waterproofing on the rooftop floor have been changed for design purposes. 【Overview】 ■ Completion Date: March 10, 2017 ■ Location: Fukuoka City, Fukuoka Prefecture ■ Type: 5-story, 6-tier continuous sloping type ■ Purpose: For residential use ■ Construction Area: 6,979.50 m² ■ Capacity: 293 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a flat-type parking lot that incorporates efficient vertical parking. A canopy has been added to the outer perimeter for pedestrian access. The layout of the parking spaces maximizes the use of the site, and a roof has been provided for the stairs and the passage to the main building. 【Overview】 ■ Completion date: March 22, 2019 ■ Location: Kitakyushu City, Fukuoka Prefecture ■ Type: 1-layer, 2-level flat type ■ Use: For residential buildings ■ Construction area: 1,072.01 m² ■ Capacity: 105 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This parking lot for residential buildings features an exterior wall painted in a gradient of brown tones. An elevator shaft has been installed closer to the apartment building, and equipment such as the distribution board has been placed in the dead space under the stairs. To consider the neighbors, openings have been minimized to reduce light disturbance. 【Overview】 ■ Completion Date: March 31, 2020 ■ Location: Sendai City, Miyagi Prefecture ■ Type: 2-layer, 3-tier continuous sloping floor ■ Purpose: For residential buildings ■ Construction Area: 2,244.67 m² ■ Capacity: 143 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a store-attached parking lot designed with aluminum louvers and decorative panels on the exterior, allowing for glimpses of greenery. The ramp features a central line and pole cones for safety considerations. Planters utilizing fall prevention fences have been planted with greenery. The interior of the parking lot is neat and has few obstructions. 【Overview】 ■ Completion Date: March 26, 2017 ■ Location: Yokohama City, Kanagawa Prefecture ■ Type: 5-story, 6-level store-attached (individually certified) ■ Purpose: Customer attraction ■ Construction Area: 3,618.76 m² ■ Capacity: 85 vehicles *For more details, please refer to the PDF materials or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This parking lot is connected to commercial and public facilities via a pedestrian deck. The entrance to the elevator tower from the parking lot is installed every half floor. The section facing the adjacent square employs a wire-based wall greening method. 【Overview】 ■ Completion Date: April 28, 2017 ■ Location: Aichi Prefecture ■ Type: 4-layer, 5-step skip-connected structure ■ Purpose: For attracting customers ■ Construction Area: 6,198.05 m² ■ Capacity: 273 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This parking lot features two ramps for both ascending and descending, allowing for one-way traffic. The exterior walls are made of metallic brown steel plates. Fire hatches are installed on all floors except for the first and the rooftop. Additionally, the north and west sides of the parking lot are covered with soundproof walls to consider the neighboring area. 【Overview】 ■ Completion Date: September 15, 2017 ■ Location: Chofu City, Tokyo ■ Type: 5 stories, 6 levels, individually certified ■ Purpose: For attracting customers ■ Construction Area: 5,773.00 m² ■ Capacity: 204 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. To ensure that cherry blossoms can be seen from the parking lot in spring, part of the exterior wall was constructed with louvers. The exterior wall is finished with colored steel plates and louvers, and extruded cement boards were installed around the columns. Lines, parking stops, entrances and exits of the elevator shaft, and stair doors are color-coded on each floor. 【Overview】 ■ Completion date: March 15, 2019 ■ Location: Koka City, Shiga Prefecture ■ Type: 4-story, 5-level flat type ■ Purpose: For attracting customers ■ Construction area: 6,386.84 m² ■ Capacity: 256 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. It is a self-driving multi-story parking lot with stores on the 1st and 2nd floors. The construction area is 9,189.01 m², with a capacity of 253 vehicles. It features a continuous inclined floor system, making maximum use of the site. 【Overview】 ■ Completion date: October 31, 2019 ■ Location: Sumida Ward, Tokyo ■ Type: 5 stories, 6 levels with stores (individually certified) ■ Purpose: For attracting customers and hourly rental ■ Construction area: 9,189.01 m² ■ Capacity: 253 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. We maximized the number of vehicles accommodated within the limited site. In addition to height, weight, and speed restrictions, we installed operational awareness signage at the parking lot entrance. Due to height restrictions, the exterior walls on the rooftop were designed with lattice railings. Furthermore, considering the neighboring area, the stairs were finished with concrete instead of checker plates. 【Overview】 ■ Completion Date: January 31, 2016 ■ Location: Mito City, Ibaraki Prefecture ■ Type: 3-layer, 4-tier flat type ■ Use: Employee and business use ■ Construction Area: 2,160.25 m² ■ Capacity: 85 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a two-layer, three-tier employee parking lot with a linear ramp. The ramp has a straight structure that allows for direct access to the rooftop level. Since it is an employee parking lot, the parking spaces are arranged in a single line, and LED lighting illuminates the pedestrian walkway, along with a privacy screen installed on the straight staircase. 【Overview】 ■ Completion Date: October 25, 2017 ■ Location: Nishinomiya City, Hyogo Prefecture ■ Type: Two-layer, three-tier flat type ■ Purpose: Employee and business use ■ Construction Area: 1,979.89 m² ■ Capacity: 108 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. A eaves gutter was installed on the roof, and a snow protection net was set up to prevent wind and snow from the west side. Since it is a snow accumulation area, the parking area is covered by a roof. The stairs are also equipped with a snow prevention roof and snow protection net, and the first floor is operated as a time-limited parking area. The entrances and exits of the parking lot are provided on the east and north sides. 【Overview】 ■ Completion date: May 1, 2018 ■ Location: Sapporo City, Hokkaido ■ Type: One-layer, two-tier roof (heavy snow specification) ■ Use: Employee and business use ■ Construction area: 928.26 m² ■ Capacity: 38 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. To serve as a shared garage for the adjacent Store No. 2, we installed a cross-entrance pathway and considered security measures for access to the upper floors, including shutters and external staircase doors. For stock purposes, the parking stops are made of square pipes without area restrictions, and a traffic light has also been installed in front of the ramp. 【Overview】 ■ Completion Date: September 20, 2018 ■ Location: Uji City, Kyoto Prefecture ■ Type: 3-layer, 4-tier flat type ■ Use: Employee and business use ■ Construction Area: 2,269.00 m² ■ Capacity: 107 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. The first floor serves as a maintenance area and office, while the second floor is a parking lot with individually certified stores. The parking capacity is 98 vehicles, and the construction area is 4,575.08 m². We secured parking spaces to fit the site. 【Overview】 ■ Completion date: July 8, 2019 ■ Location: Fukuoka City, Fukuoka Prefecture ■ Type: 6-story, 7-level parking lot with stores (individually certified) ■ Use: Employee and business use ■ Construction area: 4,575.08 m² ■ Parking capacity: 98 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a individually certified parking lot that maximally utilizes the irregular land shape. A center line has been applied to the slope. The entrance to the rooftop level and the elevator tower features sliding doors. Due to the irregular shape of the site, the two parking structures are connected. 【Overview】 ■ Completion Date: July 21, 2016 ■ Location: Osaka City, Osaka Prefecture ■ Type: 4-story, 5-tier continuous sloping floor (individually certified) ■ Purpose: Hourly rental ■ Construction Area: 4,799.20 m² ■ Capacity: 206 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationHere is an introduction to the construction case of the self-driving multi-story parking lot, Yuuken Park. It is a parking lot that excels in convenience with a spacious environment and high-spec facilities. There is a direct connection corridor to the station (barrier-free) with entrances and exits designed to maximize width. A vehicle number recognition system and pre-payment machines have been installed (with a left-side ticket machine for foreign cars), and some parking spaces accommodate long and wide spans. 【Overview】 ■ Completion date: October 31, 2016 ■ Location: Narita City, Chiba Prefecture ■ Type: 5-story, 6-tier continuous sloped floor (individually certified) ■ Use: Hourly rental ■ Construction area: 10,314.16 m² ■ Capacity: 445 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationHere is an introduction to the construction case of the self-driving multi-story parking lot, Yuuken Park. To alleviate congestion, the parking lot has two lanes at the entrance. The stairwell is enclosed with metallic silver louvers, and the sidewalk facing the street has been landscaped. The continuous sloped floor design efficiently arranges the parking spaces. [Overview] ■ Completion Date: May 31, 2018 ■ Location: Hamamatsu City, Shizuoka Prefecture ■ Type: 4 levels, 5 tiers continuous sloped floor ■ Purpose: Hourly rental ■ Construction Area: 7,149.50 m² ■ Capacity: 344 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-parking multi-story parking lot, Yuuken Park. It is a self-parking multi-story parking lot with stores on the 1st and 2nd floors. The entrance and exit of the 3rd-floor parking lot feature gate-type parking equipment. It utilizes a continuous sloping floor design to maximize the use of the site. 【Overview】 ■ Completion Date: October 31, 2019 ■ Location: Sumida Ward, Tokyo ■ Type: 5 levels, 6 tiers with stores (individually certified) ■ Purpose: For attracting customers and hourly rentals ■ Construction Area: 9,189.01 m² ■ Capacity: 253 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a time-limited parking lot with ample space for families with children. The entrance and exit of the parking lot are adorned with louvers, featuring a gently sloping continuous tilted floor. Additionally, the fifth floor, designed for families with children, has a bright elevator hall decorated with illustrations for toddlers. The width of the parking spaces is 1.5 times that of standard spaces. 【Overview】 ■ Completion Date: May 30, 2020 ■ Location: Hamamatsu City, Shizuoka Prefecture ■ Type: 5-story, 6-tier continuous tilted floor ■ Purpose: Time-limited use ■ Construction Area: 6,265.02 m² ■ Capacity: 262 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. The rooftop level is usually available for parking, but this property has a roof specification. To promote energy efficiency, solar panels and green wall landscaping have been installed, along with an automatic watering system for the planters in case the moisture levels are insufficient. Additionally, a buzzer to signal vehicle departures and a vehicle control system that can detect the number of parked cars have been implemented. [Overview] ■ Completion date: November 30, 2012 ■ Location: Morioka City, Iwate Prefecture ■ Type: 4-layer, 5-tier flat type ■ Purpose: Public use (public works) ■ Construction area: 3,454.75 m² ■ Capacity: 152 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This multi-story parking lot was developed to accommodate the concentrated influx of vehicles from health check-up visitors, and it is designed for hourly rental use. To ensure pedestrian safety, a barrier gate has been installed next to the payment machine at the entrance on the first floor. The parking lot features a skip design that makes it easy for anyone to park, and part of the exterior wall has been greened. Additionally, LED lighting has been adopted for the exterior lights on the rooftop to conserve energy. 【Overview】 ■ Completion Date: December 25, 2014 ■ Location: Kakogawa City, Hyogo Prefecture ■ Type: 4-layer, 5-step skip type ■ Use: Public (public works) ■ Construction Area: 3,404.06 m² ■ Capacity: 100 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a conventional construction method parking facility that includes a "Citizen Activity Plaza" and conference rooms on the first floor. Since it exceeds 100 meters in length, there are stairs leading to the elevator located in the central part of each floor. Additionally, due to the conventional construction method, fireproof coverings and fixed fire extinguishing equipment, which are not required for certified methods, have been installed. [Overview] ■ Completion Date: October 31, 2015 ■ Location: Odawara City, Kanagawa Prefecture ■ Type: 5-story, 6-tier continuous sloped floor type (1st floor facility) ■ Purpose: Public use (public works) ■ Construction Area: 12,255.36 m² ■ Capacity: 368 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. Utilizing the natural slope of the site, we created a water drainage slope in the longitudinal direction. On the backside, we also secured a flat parking area. The long parking lot follows the shape of the site and includes a ball net to protect against balls from the adjacent Maruyama Baseball Stadium. 【Overview】 ■ Completion date: March 24, 2016 ■ Location: Sapporo City, Hokkaido ■ Type: 2-layer, 3-tier flat type (heavy snow specification) ■ Use: Public (public works) ■ Construction area: 4,136.74 m² ■ Capacity: 191 vehicles *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. This is a 5-story, 6-level continuous sloped parking facility for public facility users. The entrance to the elevator building for parking users is located near the south exit of Tagajo Station. The second floor is equipped with a restroom for the disabled, and there is also a turning space for one car. 【Overview】 ■ Completion date: March 31, 2016 ■ Location: Tagajo City, Miyagi Prefecture ■ Type: 5-story, 6-level continuous sloped ■ Purpose: For public facility users ■ Construction area: 7,982.61 m² ■ Capacity: 351 vehicles *For more details, please refer to the PDF materials or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThis is a basic type of automated parking system. It moves to the upper floors by climbing a slope of 17% or less. 【Features】 ○ Concrete floor, steel floor ○ Maximum capacity of approximately 350 vehicles ○ Maximum total floor area of 4,000m2 ○ The steel floor is the only certified one in the industry. ○ It is also suitable for heavy snowfall areas. ● For other functions and details, please download the catalog.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThis is a self-parking multi-story parking lot that protects cars from rain and snow while enhancing customer convenience. 【Features】 ○ Maximum capacity: 1 layer 2 tiers approximately 350 cars / 2 layers 3 tiers approximately 500 cars ○ Maximum total floor area: 1 layer 2 tiers 8,000m2 / 2 layers 3 tiers 12,000m2 ○ Protects cars from rain and snow. ○ Suitable for heavy snowfall areas. (The heavy snowfall model is the only certified one in the industry.) ○ The 2-layer 3-tier roofed model is certified as a fire-resistant building. ● For other functions and details, please download the catalog.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationA building that integrates a store and a parking lot becomes the "optimal store with parking" only when the layouts of both the store and the parking lot are taken into consideration. Our company will provide the best proposal from the options below based on your requests. 【Features】 ○ This is a revolutionary construction method that does not require fireproof coating, fire shutters, or foam extinguishing systems, allowing for construction at a reliably low cost. ○ It is a general minister-certified product that incorporates elements of fire-resistant design. Like certified parking lots, it can be constructed on any land. ○ If it does not meet the criteria for fire-resistant design or certification, we will plan it as a general building. We will propose an efficient building considering the layout of the store and the parking lot. ● For other functions and details, please download the catalog.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationBy using fire-resistant design that eliminates the need for fireproof coverings, fire shutters, and foam extinguishing equipment, we can provide low-cost parking lots that obtain individual certification. Individual certified parking lots can be constructed up to 6 layers and 7 tiers. If it does not meet the standards for general certified parking lots (e.g., 6 layers and 7 tiers parking lots, 2.5t compatible parking lots), we recommend individual certified parking lots. 【Features】 ○ Due to legal relaxations, equipment can be reduced, resulting in lower costs. ○ The shape can be freely designed. ● For other functions and details, please download the catalog.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationIt is a 2-level, 3-tier parking lot. There are three types: flat type (the basic type among self-parking lots, where you move to the upper floor by climbing a slope of 17% or less), flat step type (a type where you go up one floor at a time), and continuous sloped floor type (a type that spirals upward with a gradient of 4% or less. Since the vehicle path also serves as the slope, the area per vehicle is minimized). 【Features】 ○ Types: Flat type, flat step type, continuous sloped floor type ○ Floor: Concrete floor, steel floor ○ Maximum capacity: Approximately 500 vehicles ○ Maximum total floor area: 8,000 m² ● For other functions and details, please download the catalog.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration