Designated Investigation Agency | Comprehensive Measures to Prevent Delays During Factory Reconstruction | Geotech
Prevent delays in construction and demolition during factory rebuilding! We provide comprehensive support from usage history investigation to soil gas analysis and accurate determination of contamination areas.
In projects involving the demolition or reconstruction of buildings due to factory shutdowns, halting excavation plans due to soil contamination poses a critical risk that can lead to enormous penalties and delays in construction schedules. This comprehensive investigation package is a technical service designed to perfectly visualize underground contamination conditions before construction begins, ensuring that the building schedule is not affected. First, in Phase 1, a thorough usage history investigation will be conducted to trace past manufacturing line layouts and equipment updates, precisely pinpointing areas of contamination concern. In the subsequent Phase 2 field investigation, high-precision soil gas analysis will be conducted swiftly as a countermeasure against specified hazardous substances, along with surface soil sampling to scientifically identify the contamination status. If contamination is confirmed, detailed drilling in the depth direction will be carried out to accurately determine the extent of the contamination, supporting the development of a reliable and efficient soil removal and purification plan. With trusted evidence as a designated investigation agency, we will safeguard the construction schedule and thoroughly optimize project costs during reconstruction.
- Company:ジオテック
- Price:100,000 yen-500,000 yen