Comprehensive Soil Investigation Procedure to Prevent Leakage from Aging Equipment for the Manufacturing Industry | Geotech
Soil contamination survey
Management of chemical substance leakage into the ground due to aging factory infrastructure and disasters through phased sampling.
In the management of factory sites in the manufacturing industry, it is essential to address the risks of aging equipment and chemical leaks into the ground due to disaster risks. Difficult-to-detect underground infiltration can lead to severe soil and groundwater contamination, resulting in enormous cleanup costs. Our comprehensive soil investigation serves as a practical guide to early detection of risks and prevention of environmental liabilities. Through Phase 1, which identifies potential risks based on equipment layout and repair history, and Phases 2 and 3, which involve gradually collecting field data, we implement "stepwise sampling" at high-risk locations. This approach helps to suppress unnecessary high analysis costs while achieving compliance governance and cost optimization without halting operations. 【Usage Scenarios】 - Risk assessment of hazardous substance leaks from aging pipes and pits - Understanding underground infiltration risks due to disasters such as earthquakes - Early detection of soil and groundwater contamination on factory sites - Investigations in accordance with the Ministry of the Environment's voluntary investigation guidelines 【Benefits of Implementation】 - Prevention of environmental liability expansion - Reduction of cleanup costs - Minimization of operational impact during investigations - Optimization of investigation costs
Inquire About This Product
basic information
【Features】 - Cost optimization through phased sampling from Phase 1 to 3 - Generation of risk maps based on past equipment layouts and repair histories (Phase 1) - Surface sampling focused on the areas directly beneath pits and outdoor piping joints (Phase 2 and 3) - Compliance assessment through official analysis registered under the measurement certification business - Preparation of measurement reports based on quantitative evidence 【Our Strengths】 Geotech provides "total ground services," offering a one-stop solution for all tasks related to "ground," including ground surveys, ground reinforcement design/construction, settlement correction work for existing buildings, and soil contamination investigations. With extensive experience and reliable technology, we create the future of cities from the ground up.
Price information
-
Price range
P3
Delivery Time
P4
Applications/Examples of results
This survey method is utilized for investigating the aging deterioration of infrastructure in factories engaged in chemical manufacturing, metal plating, electronic components, and automobile maintenance, as well as for self-safety checks after disasters and for environmental risk prevention inventory in environmental management systems (ISO 14001). It is suitable for practical scenarios where potential underground infiltration risks are screened in advance in confined indoor spaces, such as gaps in equipment piping and within chemical storage warehouses, without halting production activities or truck operations on the factory premises, thereby managing safety with objective data. It addresses preventive maintenance applications to prevent the spread of contamination, minimize purification costs, and protect the company's social credibility and asset value.
catalog(3)
Download All Catalogs
Company information
-


![[For Financial Institutions] Soil Contamination Survey | Real Estate Risk Assessment | Geotech](https://image.www.ipros.com/public/product/image/321794/IPROS7013683363568527590.png?w=280&h=280)




![Dry Wave Retractable Indoor Clothes Drying Rack [Good Design Award Winner]](https://image.www.ipros.com/public/product/image/600/2000331235/IPROS31366560678415915313.jpeg?w=280&h=280)

![[Proposal] Bird Damage Prevention (Wire Type) Altima Bird Prevention Wire](https://image.www.ipros.com/public/product/image/2032865/IPROS2629637137718331190.jpg?w=280&h=280)