[Case Study of Biomass Boiler Introduction] Heat Supply to Foot Bath and Kitchen Hot Water at Roadside Station
Hot water supply for foot baths and kitchen hot water is being provided! Case study of biomass boiler installation.
We would like to introduce a case where a biomass boiler was installed at the Michi-no-Eki Miyoshi Village Hinanosato. To prioritize heat supply to the foot bath, supply control to the kitchen hot water is implemented while monitoring the temperature status of the thermal storage tank. When the temperature set by the sensor installed in the thermal storage tank falls below the set point, the pump stops. [Case Overview] ■ Main Equipment Supplied - KWB biomass boiler 28.6kW - Thermal storage tank 3,000L - Inverter pump - Flow control valve *For more details, please refer to the PDF document or feel free to contact us.
- Company:WBエナジー
- Price:Other