WALL construction method Product List and Ranking from 31 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Dec 10, 2025~Jan 06, 2026
This ranking is based on the number of page views on our site.

WALL construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Dec 10, 2025~Jan 06, 2026
This ranking is based on the number of page views on our site.

  1. アグロジャパン Gifu//Other construction industries
  2. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  3. 山一ピーエスコンクリート Hokkaido//Building materials, supplies and fixtures manufacturers
  4. 4 ケアンズ・イノベーション Tokyo//Housing manufacturers and construction companies
  5. 5 日本カイザー Tokyo//Other construction industries

WALL construction method Product ranking

Last Updated: Aggregation Period:Dec 10, 2025~Jan 06, 2026
This ranking is based on the number of page views on our site.

  1. EPS Lightweight Embankment Method - Quilless Wall Method 山一ピーエスコンクリート
  2. RBP wall construction method Taiyo Kisokogyo Co.,Ltd.
  3. External Reinforced Wall Construction Method "e-Power Wall" ケアンズ・イノベーション
  4. 4 Specialized spray material for guest soil and thick layer substrate: "Harden RS" アグロジャパン
  5. 4 Mini wall construction method Taiyo Kisokogyo Co.,Ltd.

WALL construction method Product List

31~45 item / All 50 items

Displayed results

Wide Wall Method (Roadway Widening Method)

Road widening method completed simultaneously with block stacking.

This technology allows for an approximately 2-meter widening by being constructed in the same manner as conventional large block retaining walls, and it enables a lower wall height compared to traditional methods when widening roads in steep terrain. Additionally, it reduces the amount of excavation needed, making it environmentally friendly and promising cost reductions. Received the 11th National Land Technology Development Award in FY 2009 [Regional Contribution Technology Award].

  • Dam construction
  • Retaining wall

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Total Cost Reduction Method "Sun K Clear Method"

Labor-saving, effort-saving, shortened construction period, and easy installation! Ideal for improving the work environment on-site.

The total cost reduction method "Sun K Clear Method" allows for the installation of precast products by adjusting the height with a jack and then floating the main body above the foundation using pre-installed "Raku Pita (height-fixing bolts)." Concrete is then filled into the gap, integrating the retaining wall with the base. This method enables the construction of a robust retaining wall while improving the working environment on-site, reducing installation time, and achieving labor and effort savings, resulting in a total cost reduction. 【Features】 ○ Easy installation ○ Safe construction ○ Complete integration ○ Reduced installation time, labor, and effort ○ Improved installation accuracy For more details, please contact us or download the catalog.

  • Airport facilities
  • River construction
  • Retaining wall

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Sediment control dam wall construction method (dam wall)

It is possible to construct a dam that matches the natural landscape by applying stone planting and decorative elements to the front of the sediment control dam block.

We would like to introduce our "Sabo Dam Wall Method (Dam Wall)." All 15 types of vertical-type Sabo dam blocks, ranging from 0.5 to 0.7 (in 0.05 increments), are self-supporting, which ensures high stability during construction and makes the work easier. Additionally, even when the slopes of the front and back of the dam differ (for example, a front slope of 2 and a back slope of 5), the design ensures that the vertical height of one layer of Sabo dam blocks is consistently 1.5 meters, allowing for a concrete placement height of 1.5 meters for the embankment. 【Features】 ■ Self-supporting precast blocks ■ Custom-designed for each slope ■ Does not compromise aesthetics ■ Excellent cost-effectiveness *For more details, please refer to the PDF materials or feel free to contact us.

  • Retaining wall

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Specialized spray material for guest soil and thick layer substrate: "Harden RS"

A non-cement-based neutral hardening agent that is resistant to freezing and frost heave, suitable for cold regions and shaded slopes!

"Harden" is an environmentally friendly soil solidification material that effectively utilizes recycled resources from industrial by-products. It is non-cement-based, ensuring that improved soil does not become industrial waste and can be reused for backfilling and embankments, contributing to reduced environmental impact and promoting a circular recycling approach. "Harden RS" is specifically designed for sprayed soil and thick layer base applications, enhancing germination and growth. It creates adhesion with the underlying soil, preventing runoff due to rainfall. 【Features】 ■ Resistant to freezing and frost heave, suitable for cold regions and shaded slopes ■ Creates adhesion with the underlying soil, preventing runoff due to rainfall ■ Improves germination and growth ■ The standard application for thick layer base spraying is 1 kg per batch (160L of base agent) ■ The standard for sprayed soil application is 20 kg (1 bag) per 1m³ *For more details, please refer to the PDF document or feel free to contact us.

  • Other construction services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Case study of the environmentally friendly soil solidification material "Harden M" (2)

Introducing a case study of ground improvement work in the construction yard within the riverbed for river gate construction!

We would like to introduce a case study of the soil solidification material "Harden M," which effectively utilizes recycled resources to reduce environmental impact. During the construction with a crawler-type pile driver, the supporting ground was improved. After the pile driving work was completed, the ground was re-excavated and reused on-site. 【Case Study】 ■ Project Name: Gifu Prefecture Ogaki Civil Engineering Office Mud River Sluice Gate Main Construction ■ Delivery Date: From July 2008 ■ Location: Within Juroku Town, Ogaki City, Gifu Prefecture ■ Soil Improvement Material Used: Harden M, 885 tons ■ Land Condition: Deposited mud, soft soil, N value 2-3 *For more details, please refer to the PDF document or feel free to contact us.

  • Other civil engineering services
  • Civil Engineering Method
  • Soil improvement material

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Case study of the environmentally friendly soil solidification material "Harden M" (3)

Currently, a biotope has been created, and it is also famous as a place for fireflies! Here is an introduction to the construction case of the rainwater retention pond.

We would like to introduce a case study of the soil solidification material "Harden M," which effectively utilizes recycled resources to reduce environmental impact. The construction site is now a biotope and has become famous as a habitat for fireflies. 【Case Study】 ■ Project Name: Kariya City Hall, Shiroike Renovation Project ■ Delivery Date: November 2005 ■ Location: Higashizakai-cho, Kariya City, Aichi Prefecture ■ Soil Improvement Material Used: Harden M, 775 tons ■ Condition of the Land: Sediment from a reservoir *For more details, please refer to the PDF document or feel free to contact us.

  • Other civil engineering services
  • Civil Engineering Method
  • Soil improvement material

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Sediment control dam wall construction method (dam wall)

It is a block for erosion control dams that excels in construction.

The patterns on the block surface are designed to harmonize with nature, offering a rich variety. Acquired Construction Technology Certification No. 1102 from the Public Interest Incorporated Foundation, Sediment Disaster Prevention and Landslide Technology Center (STC).

  • Tunnel construction
  • Waste treatment facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Free Mat Steel Method

Rehabilitation of Yoshino trees and the use of recycled materials for vegetated shore protection! A method for enhancing waterfronts.

The "Free Mat Steel Method" is a new revetment construction method that offers high workability, aesthetics, and safety. The panels that serve as the framework are slide-type, allowing for flexible setting of dimensions and panel positions, making it easy to construct curved and angled sections. The traditional method known for its high evaluation, "Rough Log Method Cover," has been modernized with a "Corrosion-Resistant Steel Plate Frame." 【Features】 ■ The panels are lightweight and easy to install and assemble. ■ The panels have strength, eliminating the need for temporary materials. ■ It does not impose a burden on the site, allowing for significant reductions in construction time. ■ The top edges of the panels are mostly concealed, creating a seamless appearance. ■ Thinned logs can be attached to the top edges, allowing for consideration of the landscape. *For more details, please refer to the PDF materials or feel free to contact us.

  • Renovation and repair methods
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Sand control dam wall construction method

Introducing the self-supporting sediment control dam block (dam wall) designed specifically for each slope!

The 15 types of "sediment control dam blocks" designed for vertical use, ranging from 0.5 to 0.7 (in increments of 0.05), are all self-supporting, providing high stability during construction and making work easier. Even when the slopes on the front and back of the dam differ, this product is designed so that the vertical height of one layer is consistently 1.5m, allowing for a concrete placement height of 1.5m for the embankment. By applying stone planting and decorative elements to the front, it enables the construction of dams that match the natural landscape. 【Features】 ■ Self-supporting precast blocks ■ Design tailored for each slope ■ Does not compromise the landscape ■ Excellent cost-effectiveness ■ Made to order *For more details, please refer to the PDF document or feel free to contact us.

  • Civil Engineering Method
  • Formwork material
  • Erosion control works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Greening technology from the perspective of biodiversity: Curtain wall method

This is a method that solves the problems of greening spray work in conventional cut slope surfaces, etc.

The curtain wall construction method is a technique that ensures slope stability and establishes vegetation composed of native plants around the site by combining site-applied frame construction with curtain walls (cast-in-place flexible concrete fences) on cut slopes. By using suitable topsoil as a growth substrate for plants, it secures the water retention capacity of the growth substrate and prevents the peeling of sprayed materials seen in thick-layer substrate spraying work. The surface of the growth substrate remains level, preventing the outflow of the growth substrate. 【Features】 - Ensures slope stability - Establishes vegetation composed of native plants around the site - Secures the thickness and water retention capacity of the growth substrate - Facilitates the elongation of rhizomes - Expects germination and growth from buried seeds For more details, please contact us or download the catalog.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Information] Environmentally friendly soil solidification material "Harden"

Introducing an environmentally friendly soil solidification material that effectively utilizes recycled resources!

This document outlines the features and product composition of the environmentally friendly soil solidification material "Harden," handled by EARTH CREATE. "Harden" can be recycled into high-quality improved soil by adding an appropriate amount to the excavated soil, mud, and sludge generated at construction sites and mixing it. Additionally, it eliminates the need for transportation to disposal sites or the transport of new material soil, thereby reducing CO2 emissions. [Contents (excerpt)] ■ Overview ■ Features ■ Harden product composition ■ Improvement principle of Harden ■ Reaction mechanism of Harden *For more details, please refer to the PDF document or feel free to contact us.

  • Paving Materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Data] Evaluation Results of the Utilization Effect of the Truss-Type Gatehouse

Introduction of the evaluation results of the utilization effects of the truss-type gatehouse, including features and observations!

This document presents the results of the effectiveness evaluation of the "truss-style sluice gate superstructure" handled by EARTH CREATE. It includes an overview, features, observations, perspectives on future evaluations, and the necessity of evaluations. The "truss-style sluice gate superstructure" is a superstructure for sluices, gates, and conduits, constructed primarily of aluminum alloy and utilizing a truss system for the roof. [Contents] ■ NEITS Information ■ Effectiveness Evaluation ■ Effectiveness Survey Results ■ Need for Follow-up Surveys ■ Follow-up Surveys *For more details, please refer to the PDF document or feel free to contact us.

  • Outdoor storage, living room, and veranda unit
  • Watergate

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Document] Graffiti Removal Cleaning Agent Application Manual

Photos before and after construction included! Important notes and safety and health precautions are provided.

This document is the application manual for the graffiti removal cleaning agents 'MT-47' and 'MT-T3'. It includes precautions and safety and health considerations. Additionally, it features photos showcasing the actual use of the products, as well as the conditions before and after application. Please take a moment to read it. 【Contents】 ■ Precautions ■ Safety and health considerations ■ First aid measures ■ Storage methods ■ Disposal methods *For more details, please refer to the PDF document or feel free to contact us.

  • paint
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Concrete Structure Anti-Corrosion Method "GF Protect Method"

It demonstrates its power in places where a shortened construction period is required and long-term maintenance-free operation is demanded.

The "GF Protect Method" is a groundbreaking technique aimed at preventing corrosion in concrete structures by combining the excellent durability of glass fibers with high-flow, non-shrink filling materials, enhancing safety and cost-effectiveness. It improves "corrosion resistance" and "durability," is lightweight and easy to handle, and does not allow water penetration or reactions, thus preventing freezing and thawing or deterioration of the substrate. 【Features】 ■ No formwork required ■ Workability - Lightweight, making it easy to work without heavy machinery, etc. ■ Shortened construction period ■ Freeze-thaw resistance *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Simple earth retention method for excavation.

The relocation of the excavation area due to construction is quick, so the construction period in residential areas is shorter.

We would like to introduce the "Simple Earth Retention Method for Excavation." In this method, we carry out the work while confirming the excavation in areas that have traditionally been extremely difficult, such as gravel layers. Therefore, when there are boulders, cobbles, or obstacles, it becomes easy to either remove them or proceed with the excavation while embedding them. Additionally, the machinery used consists only of an excavator and a crane truck, with no other heavy equipment or materials required. 【Features】 ■ Each component is designed with safety calculations and a soft composite structure. ■ The interior of the excavation allows for wider and safer work. ■ The movement of the excavation area due to construction is quick. ■ The construction period in residential areas is shorter. ■ Each component can be disassembled and transported by a regular truck. *For more details, please refer to the PDF document or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration