Choosing construction methods that won't fail! Non-pick method <Seismic retrofitting edition>
It is now possible to carry out construction that was previously difficult! No chipping is required, and it can be done with low noise and dust-free construction.
Introducing the post-construction slit work "Non-Pick Method" for apartment buildings, office buildings, and more. The angled construction allows for easy installation behind pipes without the need to remove external piping. Additionally, a compact dedicated cutting machine can be used for easy installation in narrow spaces. This method reduces the burden on residents and offices, ensuring excellent results and construction precision. 【Features】 ■ Outstanding results and construction precision ■ Reduced burden on residents and offices ■ Safe work while occupied, ensuring safe passageways ■ No chipping required, low noise, and dust-free construction ■ Thin residual type complete slit with technical evaluation obtained ■ Years of trust and proven results *For more details, please refer to the PDF materials or feel free to contact us.
- Company:ロンビックジャパン
- Price:Other