Removal method Product List and Ranking from 8 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

Removal method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

  1. マルホウ 本社 Aichi//Other construction industries
  2. グリーンアーム Tokyo//Other construction industries
  3. 日本海洋サービス 大阪支店 Osaka//Building materials, supplies and fixtures manufacturers
  4. 4 東京テクノ Tokyo//Facility Design Office
  5. 5 丸建興業 Tokyo//General contractors and subcontractors

Removal method Product ranking

Last Updated: Aggregation Period:Sep 03, 2025~Sep 30, 2025
This ranking is based on the number of page views on our site.

  1. Parking lot waterproofing removal work - Terminator removal method マルホウ 本社
  2. IH-type pavement removal method グリーンアーム
  3. Excavation and removal method using MJP. 日本海洋サービス 大阪支店
  4. 4 MRT method for underground obstacle removal in narrow spaces 丸建興業
  5. 5 Dismantling Adhesive Technology Utilization: SFRC Pavement Removal Method 阪神高速技術

Removal method Product List

16~23 item / All 23 items

Displayed results

[Construction Case Studies] Special Feature on Removed Underground Obstacles - March

We have a track record of construction in various fields! We can cut, remove, and backfill underground obstacles using various methods suitable for the site.

On our company website, we introduce case studies of underground obstacle removal. This page features a special report on underground obstacles removed in March 2022. For more details, please refer to the related links. Our company is capable of cutting, removing, and backfilling underground obstacles using various methods suitable for the site. Please feel free to contact us with your requests. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Removal of Underground Obstacles in Minato Ward & 30m Foundation Pile Driving Work

Feel free to consult us if you are in trouble! Here is an example of a case where we encountered underground obstacles and received a removal request.

We would like to introduce a case of underground obstacle removal conducted by our company in Takanawa, Minato-ku, Tokyo. During the construction using the Aboron method, we encountered an underground obstacle at a depth of 18 meters, which made it impossible to continue the work, leading to a request for removal from our company. Using the multi-drill excavator SR-45, we performed the underground obstacle removal with the multi-drill method, and after the obstacle was removed, we also carried out the installation of the foundation piles for the tower crane, measuring 350×350H. [Case Overview] ■ Project Name: Underground Obstacle Removal & 30m Foundation Pile Installation in Minato-ku ■ Construction Date: March 11, 2020 ■ Location: Takanawa, Minato-ku, Tokyo *For more details, please download the PDF from the related link or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] SR45 Multi-Drill Method Underground Obstacle Removal

Introducing examples of smooth removal made possible by using our independently developed tools!

We would like to introduce a case study of underground obstacle removal conducted by our company. In Nihonbashi, Chuo-ku, Tokyo, where the Shinkansen runs nearby, we used the SR45 multi-drill to remove a site construction pile with a diameter of 1200 mm and a depth of 22 m. The removal of the site construction pile in a narrow area was extremely challenging, but by utilizing our uniquely developed Kelly grab, 3D bucket, and lightweight power jack, we were able to achieve a smooth removal. 【Case Overview】 ■ Project Name: SR45 Multi-Drill Method - Underground Obstacle Removal ■ Construction Date: September 11, 2021 ■ Location: Hon-Ishicho, Nihonbashi, Chuo-ku, Tokyo ■ Details: Diameter 1200 mm, Depth 22 m *For more details, please download the PDF from the related link or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Studies] Special Feature on Removed Underground Obstacles

For inquiries and requests regarding foundation work, please contact us! We feature underground obstacles that have been removed using our developed tools.

On our company website, we introduce case studies of underground obstacle removal. On this page, we feature underground obstacles that were removed using tools developed by our company. For more details, please check the related links. Additionally, we have included images of the removal status from January 2022, so please take a look. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Studies] Special Feature on Removed Underground Obstacles (6)

Track record of construction in various fields! Consistent in-house construction is possible from ground surveys to ground improvement work.

On our company website, we introduce examples of underground obstacle removal projects. This page features Part 6 of our series on removed underground obstacles. For more details, please refer to the related links. Our company offers a comprehensive in-house service from ground surveys to ground improvement work. Please feel free to contact us if you have any requests. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Studies] Special Feature on Removed Underground Obstacles (8)

In the multi-drilling method, tools are selected and constructed according to the situation! Original tools are also developed.

On our company website, we introduce case studies of underground obstacle removal. This page features Part 8 of our series on removed underground obstacles. For more details, please refer to the related links. Our company has also developed original tools, achieving significant results in various field situations. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Underground Obstacle Removal using Multi-Drill Method

Introduction of the original tool "Kachi Waku-kun"! Pile removal work using the multi-drilling method.

We would like to introduce a case study of underground obstacle removal conducted by our company. At a site in Honmoku, Yokohama City, an existing PHC pile with a depth of 28m and a diameter of 600mm broke during extraction, leading to a request for underground obstacle removal from our company. Using our original tool "Kachi-Wakukun," we performed the removal using a casing with a diameter of 1,000mm and the all-casing method with the SR-45 multi-drill excavator. 【Project Overview】 ■ Project Name: Introduction of "Kachi-Wakukun" and pile removal using the multi-drill method ■ Construction Date: September 27, 2023 ■ Location: Yokohama City, Kanagawa Prefecture *For more details, please refer to the related links or feel free to contact us.

  • Other civil engineering works
  • Other earthworks, foundation works, and exterior floors
  • Drilling Machine

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

IH-type pavement removal method

Electromagnetic induction heating system for the removal of asphalt pavement from steel deck slabs.

The "IH Method for Pavement Removal [IHIR(TM) Method]" is a technique that uses electromagnetic induction heating technology (IH technology) to heat the interface between the steel deck of a bridge and the asphalt pavement, thereby loosening the adhesion and facilitating the peeling and removal of the pavement surface. When a strong high-frequency current flows through a coil, a powerful magnetic field is generated. When a metal that conducts electricity well, such as iron or stainless steel, is placed within that magnetic field, eddy currents are generated through electromagnetic induction, causing the metal itself to heat up due to electrical resistance. By utilizing this mechanism to heat the steel deck, the underside of the asphalt pavement is softened. 【Features】 ■ Facilitates the peeling and removal of the steel deck and asphalt pavement ■ Reduces noise, vibration, and dust generated during work, minimizing the impact on the surrounding environment ■ Minimizes damage to the steel deck, preserving the quality of the steel deck and bridge ■ Reduces the need for chipping work, promoting labor savings and improving safety during construction *For more details, please download the PDF or feel free to contact us.

  • Road construction
  • Paving of sidewalks, roads, parking lots and stadiums
  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Search Keywords Related to Removal method