Hard Ground Pre-Boring "Low Head MLT Method"
Corresponds to areas such as under bridges, substations, and power plants! Low headroom construction method using a pile driver for hard ground with a height of 4m!
The "Low-Head MLT Method" is a low-head version of the "MLT Method," which efficiently excavates hard ground by compressing the excavated soil against the borehole wall using a special screw consisting of a compression wing and a mixing wing. *Are you facing challenges in locations where the ground is high and there are restrictions above? - Under bridges - Inside substations and power plants - Inside factory buildings By improving the conventional hard ground pre-boring method (MLT method) drilling machine, we have developed a pile driver for hard ground with a height of 4 meters without reducing the excavation power. This machine is designed to handle construction in sites with headroom restrictions and narrow spaces. 【Features】 ■ 4-meter high pile driver for hard ground ■ Suitable for construction in sites with headroom restrictions and narrow spaces ■ Compresses excavated soil against the borehole wall using a special screw consisting of a compression wing and a mixing wing ■ Vibration-free and low noise *For more details, please refer to the PDF document or feel free to contact us.
- 企業:エムエルティーソイル
- 価格:Other