Ugo~ku Utilization Case: Shizuoka Prefecture Commercial Facility New Construction (Ceiling Finishing Work)
Move independently! Effortless movement with electric power, just a finger's touch.
We would like to introduce a case study of the mobile scaffold electric caster "Ugo-k." The benefits of this product are threefold: labor-saving, improved work efficiency, and cost reduction. In Shizuoka Prefecture, during the new construction of a commercial facility (ceiling finishing work), we introduced this machine as we were looking for a solution to ensure the safety of workers and reduce their burden during scaffold movement. After the introduction, it took a little time to get used to the remote control operation, but we were able to safely move the scaffold, which typically requires about four people, with just one person. [Case Overview] - Scaffold Information: 9.1m (height) x 7.3m (width) x 1.9m (floor height), Weight 2.2t - Utilization Plan: 1 set rented for one month - Background of Introduction: Safety measures for workers during scaffold movement, burden reduction - Effect of Introduction: Scaffold movement that typically requires about four people could be safely done by one person. *For more details, please refer to the related links or feel free to contact us.
- Company:サイト 本社
- Price:Other