Excavator×青山機工 - List of Manufacturers, Suppliers, Companies and Products

Excavator Product List

1~1 item / All 1 items

Displayed results

Hard Ground Drilling Method "BG Method"

Using a multipurpose excavator, all-casing foundation piles and other tasks can be performed.

The BG method involves equipping a base machine with a leader and a high-torque rotary drive, allowing for the execution of all-casing foundation pile work, underground obstacle removal work, and stable liquid drilling foundation pile work using a Kelly bar. The underground obstacle removal work involves rotating and pressing in a casing tube while excavating and removing underground obstacles using drilling tools (auger drill, core tube, drilling bucket) and backfilling with quality soil. 【Features】 ■ Multipurpose drilling machine ■ Can be constructed in close proximity at boundaries *For more details, please download the PDF or feel free to contact us.

  • Civil Engineering Method
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration