Hard Ground Drilling Method "BG Method"
Using a multipurpose excavator, all-casing foundation piles and other tasks can be performed.
The BG method involves equipping a base machine with a leader and a high-torque rotary drive, allowing for the execution of all-casing foundation pile work, underground obstacle removal work, and stable liquid drilling foundation pile work using a Kelly bar. The underground obstacle removal work involves rotating and pressing in a casing tube while excavating and removing underground obstacles using drilling tools (auger drill, core tube, drilling bucket) and backfilling with quality soil. 【Features】 ■ Multipurpose drilling machine ■ Can be constructed in close proximity at boundaries *For more details, please download the PDF or feel free to contact us.
- Company:青山機工
- Price:Other